Loading...
HomeMy WebLinkAboutDRB17-0476_action_form_1509993401.pdf Design Review Board (DRB) Department of Community Development 75 South Frontage Road West TOWN F VA 1 L ACTION FORM Vail, CO 81657 Tel: 970-479-2139 www.vailgov.com Project Name: H-B 1709 Geneva LLC 2017 Application Number: DRB17-0476 Application Type: Change to Approved Date Applied: 10/10/2017 Change to Approved Plans - During Construction raise entire building 30" for Project Description: sewer lines, lessen roof pitch from 2:12 to 1 3/4:12, change vertical wood siding to stained wood, increase size of unit B deck with cantilever. CONTACTS Contact Type: Applicant Full Name: John G Martin, Architect (John Martin) Address: John G Martin, Architect PO Box 4701 Eagle, CO 81631 Phone: 9703280592 Contact Type: Property Owner Full Name: H-B 1709 GENEVA LLC (Dave Hilb) Address: Phone: 970-376-2742 Project Address: 1709 GENEVA DR (210312312028) (210312312028) Job Site Location: No Legal Description: Subdivision: MATTERHORN VILLAGE FILING 1 Lot: 4 Block: Data Parcel Number: 210312312028 BOARDS/STAFF ACTION Motion By: Action: Staff Approved Second By: Vote: Date: 11/06/2017 Conditions: - The applicant for this project is required to submit a framing Improvement Location Certificate (ILC) showing ridge and eave elevations in compliance with the approved development plan in conjunction with the building permit inspection process. - The applicant for this project is required to submit a foundation Improvement Location Certificate (ILC) showing the foundation of the structure in compliance with the approved development plan in conjunction with the building permit inspection process. - All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted (adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final inspections. - Any heated portion of the driveway located within the right of way must be in a separate zone. The four (4) foot concrete pan cannot be heated, Pursuant to Section 14-3-2, Other Requirements, Vail Town Code. - Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. - Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail building personnel prior to construction activities. - Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3 Appeals. - No changes to these plans maybe made without the written consent of Town of Vail staff and/or the appropriate review committee(s). - Prior to the issuance of a final certificate of occupancy, the applicant shall have completed all site and landscaping improvements as shown on the approved Design Review Board. - Crawl spaces shall only be accessible through an opening not greater than twelve (12) square feet in area and have a ceiling height of five (5) feet or less, as measured from the surface of the earth to the underside of the structural floor members of the floor/ceiling assembly above pursuant to Section 12-15-3, Definition, Calculation, and Exclusions, Vail Town Code. Planner: Chris Neubecker