Department of Community Development
75 South Frontage Road West
TOWN F VA 1 L ACTION FORM Vail, CO 81657
Tel: 970-479-2139
www.vailgov.com
Project Name: H-B 1709 Geneva LLC 2017 Application Number: DRB17-0476
Application Type: Change to Approved Date Applied: 10/10/2017
Change to Approved Plans - During Construction raise entire building 30" for
Project Description: sewer lines, lessen roof pitch from 2:12 to 1 3/4:12, change vertical wood siding
to stained wood, increase size of unit B deck with cantilever.
CONTACTS
Contact Type: Applicant
Full Name: John G Martin, Architect (John Martin)
Address: John G Martin, Architect PO Box 4701 Eagle, CO 81631 Phone: 9703280592
Contact Type: Property Owner
Full Name: H-B 1709 GENEVA LLC (Dave Hilb)
Address: Phone: 970-376-2742
Project Address: 1709 GENEVA DR (210312312028) (210312312028)
Job Site Location:
No
Legal Description: Subdivision: MATTERHORN VILLAGE FILING 1 Lot: 4 Block: Data
Parcel Number: 210312312028
BOARDS/STAFF ACTION
Motion By: Action: Staff Approved
Second By:
Vote: Date: 11/06/2017
Conditions:
- The applicant for this project is required to submit a framing Improvement Location Certificate (ILC) showing
ridge and eave elevations in compliance with the approved development plan in conjunction with the building
permit inspection process.
- The applicant for this project is required to submit a foundation Improvement Location Certificate (ILC)
showing the foundation of the structure in compliance with the approved development plan in conjunction with
the building permit inspection process.
- All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted
(adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective
pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final
inspections.
- Any heated portion of the driveway located within the right of way must be in a separate zone. The four (4)
foot concrete pan cannot be heated, Pursuant to Section 14-3-2, Other Requirements, Vail Town Code.
- Approval of this project shall lapse and become void one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
- Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail
building personnel prior to construction activities.
- Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant
to the Vail Town Code, Chapter 12-3-3 Appeals.
- No changes to these plans maybe made without the written consent of Town of Vail staff and/or the
appropriate review committee(s).
- Prior to the issuance of a final certificate of occupancy, the applicant shall have completed all site and
landscaping improvements as shown on the approved Design Review Board.
- Crawl spaces shall only be accessible through an opening not greater than twelve (12) square feet in area
and have a ceiling height of five (5) feet or less, as measured from the surface of the earth to the underside
of the structural floor members of the floor/ceiling assembly above pursuant to Section 12-15-3, Definition,
Calculation, and Exclusions, Vail Town Code.
Planner: Chris Neubecker