HomeMy WebLinkAboutOTC14-0039 roof specifications color.pdf 1976-2014
THE ROOFING COMPANY 39
Your Mountain Roofing Experts
YEARS OF
28 Ten Mie Drive I PO Box 29 I Granby,CO 80446 I vrnw theroofingco.cont j 97C-897-0104 EXCELLENCE
THE ROOFING COMPANY
Estimator: Filipp Eretnev
P: 970-887-0104
F: 970-887-0106
E: Feretnevtu.�.theroofinoco.com
Attn:Gerrad Brigham&Bryan/Jeanne Macsata Aspen Lane Duplex
2855 Aspen Lane,Vail CO 81657
VAIL
303-884-1860(Gerrad)970-445-7747(Bryan)
gbrigham@eberls.com,bryanmacsata@comcast.net Proposal date:July 17,2014
BID PROPOSAL
Section I-DaVinci Roofing:
1-Acquire permit from local authority.
2-Remove existing shake,built up low sloped roofing,clean up daily,and dispose of all debris.Boston vent will
remain in place.
3-Install Grace Ice and Water Shield.Pricing includes 2-plies at ridge and transition as well as stripping in all flashing
flanges.Price includes 24"wrap up roof to wall junctures at headwalls only.Install Vulca-sheild as a 2nd layer for
Class"A"fire separation at all designated locations.
4-Install 24 GA factory painted steel flashings at eave,rake,and L style at roof to wall locations. Install new pipe
boots and reinstall hotstacks.Install 16oz copper flashings only at sky lights and chimneys.Fabrication and
installation to be done in accordance with industry standards.
5-Install DaVinci Multiwidth Shakes with 8 inch exposure at all designated locations.Includes all components.
6-Price includes Taxes,Insurance,and saftey protocol.Installation of DaVinci components to be done in accordance
with industry standards.
Cost $57,540.00
LOW SLOPED ROOF---Install Tamko"Awaplan"rubberized premium membrane with all components,
including all flashings at low sloped roofing area.(Must be choosen with main option to complete full reroof)
(Cost ADD $4,571.00
Install New 5/8 OSB at all roofing locations.
'Cost ADD $5,519.00
Install New 5/8 CDX at all roofing locations.CDX is a better and lighter product.
ICost ADD $7,783.00
EXCLUSIONS:Unless Otherwise Specified
Snow and Ice removal. Blocking,framing,or carpentry. Ventilation calculations. Snow retention. Gutters,downspouts,or heat cable.
Siding removal and reinstalation at sidewalls.All DaVinci Components.Rake,Starter,Ridge,shakes.
Winter Conditions:(November through March)priming of roof decks will be billed at$.35 per sq.ft.in
addition to contract.Snow Removal at$50.00 per man hour.
The Roofing Company-2 Year Water-Tight Warranty(NOT PROVIDED WITH OWNER SUPPLIED MATERIAL)
Water-Tight Guarantee-The Roofing Company will warranty all workmanship against leaks for a period of(2)years.
Please Note-steep roofing systems are not designed to protect against standing water. Any condition causing standing water on roof
(ie.ice damming)would void the water-tight guarantee.
Initial to
//++��� Accept
lb L "I 1 1 IJ it VIVM
skis NVOROTlC« Firestone
BBB PREiEnfOtQN(RAM etRLI NNGBRiNIZOCTg
sos rs YEAR SYSTEM WARRANTEs II YFAlI f6URANn Carlisle SynTec INTELLIGENT
ROO°r,Gy MONS
Please see"Conditions of Contract"Addendum to Proposal for Payment Terms&Conditions-Please note All amounts due and owing beyond
thirty(30)days from completion,as set forth herein,shall bear interest at rate of one and one-half percent(1%%)per month
Note:TRC expects ventilation to be calculated and appropriate for proper air flow and does not accept any responsibility for ventilation,condensation,or damage
caused thereof.
By receipt of this proposal,proposal addressee acknowledges that The Roofing Company(LRC)has amassed significant time in assembling and reviewing documents
(drawings,pictures,etc.),coordinating information,applying methodologies,calculating interpreted costs,and building the appropriate proposal to relate this
disclosure.Client and TRC agree that this information as supplied in the proposal contains confidential details and trade secrets owned by TRC and thus the client
agrees to keep this information and trade secrets confidential.Any disputes or damages recognized through non-compliance with this matter shall be governed by
THE ROOFING COMPANY
Your Mountain Roofing Experts
INFORMATION REQUIRED FOR BILLING/PAYMENT PURPOSES.
PLEASE PRINT
Contractor if applicable
Job Name
(Physical Address) 2 855 4s e t VQci I CO/ V j 7
Job Location I
Contact Name 13r a A4 (5cL4t /Oe rre 13113110-,
(Person responsible for payn3asnts due)
Mailing Address
Billing Address if different
Telephone Ci-t) `97O -Gym 42- ( d) 970 -1/14,5 -77447
Fax 970 -- — Z-SESY
Email byl,r)nni ziJ qya I100.COM br(�a.n lY1Q.CS 0 eitniCQ54i
Credit Card Info if using for payment �/
Type of card
Card Number
Expiration Date
Signature authorizing payment by card date
Special Billing instructions or request
•
According to the contract terms (unless otherwise agreed upon between parties in writing) a 50% down
payment is required before we can schedule work with the balance due upon completion. Payments in the
form of a personal check are acceptable, or you may call our office at (970) 887-0104 to make
arrangements for payment by Visa or MasterCard.
The Roofing Company
P.O. BOX 29, 29 TEN MILE DRIVE
GRANBY, COLORADO 80446
970-887-0104 office-970-887-0106 fax
= PAC-CLA1u►.
Petersen Aluminum
A Cardinal Red ♦ Colonial Red Burgundy A Terra Cotta A Sierra Tan A Mansard Brow'
Apt Stone White A Granite A Sandstone A Almond ♦ Medium Bronze A Dark Bronze
A*Slate Gray A Bone White A Musket Gray A; Charcoal Midnight Bronze Matte Black
A*Cityscape Interstate Blue A Hemlock Green A Arcadia Green A Patina Green ♦Hunter Green
.11J
A*Military Blue Award Blue ♦Teal Hartford Green Forest Green ♦ Evergreen
•Denotes PAC-CLAD Metallic Colors Denotes Energy Stare Colors
♦ Denotes PAC-CLAD Cool Colors
Kynar 5003'or Hylar 500O'pre-finished galvanized steel and aluminum
for roofing, curtainwall and storefront applications.
+. Berkshire Blue A Slate Blue
PAC-CLAD Metallic Colors
•A*Zinc •A*Silver •AN'r Copper Penny •A` Aged Copper •A. Champagne •A.• Weathered
Zinc
PETERSEN ALUMINUM CORPORATION
HQ:1005 Tonne Road 9060 Junction Drive 10551 PAC Road 350 73rd Ave.,NE,Ste 1 102 Northpoint Pkwy Ext, Bldg 1,Ste 100
Elk Grove Village,IL 60007 Annapolis Junction,MD 20701 Tyler,TX 75707 Fridley,MN 55432 Acworth,GA 30102
P:800-PAC-CLAD P:800-344-1400 P:800-441-8661 P:877-571-2025 P:800-272-4482
F:800-722-7150 F:301-953-7627 F:903-581-8592 F:866-901-2935 F:770-420-2533
PAC - CLAD' CALOR AVAILABIL Y
PAC-CLAD 3 YEAR STEEL ALUMINUM ENERGY
COLORS
STANDARD REFLECTIVITY EMISSIVITY EXPOSURE SRI 24GA. 22GA. .032 .040 .050 .063 STAR
Almond 0.56 0.83 0.57 64 4 J 4 4 4 •
Arcadia Green 0.33 0.84 0.32 33 J 4 •
Bone White 0.71 0.85 0.71 86 J 4 4 J J 4 •
Cardinal Red 0.42 0.84 0.41 45 J J J
Charcoal 0.28 0.84 0.28 27 4 J J E
Cityscape 0.37 0.85 0.34 39 J J J 4
Colonial Red 0.34 0.85 0.33 35 4 J J 4 °
Dark Bronze 0.27 0.85 0.26 26 J J 4 J J J
Evergreen 0.27 0.85 0.25 26 J 4 z
Granite' 0.36 0.84 0.35 37 4 J 4 4 J °
Hemlock Green 0.30 0.85 0.31 30 J J 4 J •
Hunter Green 0.26 0.84 0.26 24 J J
Mansard Brown 0.26 0.84 0.24 24 J J J J J •
Medium Bronze 0.30 0.85 0.29 30 J J J 4 4 4 °
Military Blue 0.29 0.84 0.28 28 J J
Musket Gray 0.32 0.84 0.31 32 J J J J
Patina Green 0.34 0.85 0.33 35 J J
Sandstone 0.51 0.83 0.51 57 J 4 J 4 4 J
Sierra Tan 0.38 0.85 0.35 40 J J J J 4 ..
Slate Blue 0.25 0.84 0.27 23 J J
Slate Gray 0.38 0.84 0.37 40 J J 4 4 4 ..
Stone White 0.61 0.86 0.59 72 J J 4 4 J J
Teal 0.26 0.85 0.26 24 J J
Terra Cotta 0.37 0.84 0.37 39 4 J 4 •
4
PAC-CLAD METALLIC COLORS
Aged Copper 0.27 0.83 0.25 25 4 4 4
Champagne 0.45 0.78 0.41 57 J 4 4 J •
Copper Penny 0.45 0.82 0.42 49 J J J J
Silver 0.53 0.80 0.51 59 J J J J
Weathered Zinc 0.27 0.80 0.27 23 J J J "
Zinc 0.30 0.85 0.30 30 J J J
Galvalume Plus" 0.68 0.14 0.55 57 J
PAC-CLAD STANDARD COLORS(DO NOT MEET COOL ROOF REQUIREMENTS)
Award Blue J J J
Berkshire Blue* 0.25 0.84 0.22 23 J •
Burgundy J J J
Forest Green J J 4 J J
Hartford Green J J J J
Interstate Blue J 4 J
Matte Black J J .1 J J
Midnight Bronze J
PAC-CLAD,Metallic finishes are available from stock at a moderate extra cost.PAC-CLAD Copper Penny is a Non-Weathering finish.
Solar Reflectance Index calculated according to ASTM C-1549. `Low Gloss/Low Sheen,full Kynar 500'1 or Hylar 500ff finish"Acrylic coated,non-Kynar Finish.
Energystare Performance Criteria:Emissivity uses •Solvent Resistance:(NCCA procedure 11-18,no •Pencil hardness:(ASTM D 3363)-HB to 2H.
ASTM C1371.Reflectivity uses ASTM C1549. comparable ASTM test)-Pass. •Specular Gloss(ASTM D 523)-At 60 degrees;Typical;
Samples:These color reproductions are as accurate as •Humidity Resistance:(ASTM D 2247,Apparatus Al)-2,000 20-35(low gloss/tow sheen available).
modem printing technology will permit.Free material samples hours,hot dipped Galvanized,or 3000 hours, •Abrasion Resistance:(ASTM D 968)-65x10 liters.
are available on request. Aluminum: No field blisters. •Adhesion:(ASTM D 3359)-No loss of adhesion.
Technical Data for Kynar 500./Hylar 5000'Coating: •Salt Spray Resistance:(ASTM B 117),3,000 hours, •Impact Resistance:(ASTM D 2794)-1/2"ball indenter,
•Life Expectancy:20 years exposure:Chalk-rating of 8 or aluminum-No creep from scribe;no blisters.1000 hours, Gardner Impact tester:No cracking;no loss of adhesion.
better.Color-<5AE(Hunter Units)change. hot dipped galvanized-creep from scribe not to exceed •Flame Test(ASTM E 84)-Class A coating
•Accelerated Weathering:(ASTM G-23 Type EH Apparatus) 1/16";no blisters. Recycled Content:For information on recycled content,
5,000 hours:Chalk-rating of 8 or better.Color:s2AE •Chemical/Acid Pollution Resistance:(ASTM D 1308)-Pass. contact your PAC representative or visit
(Hunter Units)color change. •Formability:(ASTM D 4145)-IT-3T,No loss of adhesion. www.pacgreeninlo.com
PAC-CLAD'is a registered trademark of Petersen Aluminum Corporation,Kynar 500°is a registered trademark of Elf Atochem North America,Inc.Hylar 5000•is a registered trademark of Ausimont USA. 6/2010
r) .
....,_ .,,..
'mss
.,_ ,
ri,",:, M-2,----41'
4
DAVINCI SHAKE.
.. :. . -#- _ 0 DaVinci Multi-Width Shake recalls the
�,,vikvatakiiiaitim
., craftsmanship and authenticity of natural, hand-
ii �' �� ;,,. split cedar shakes, with durability and a 50-year
- `- .„ warranty.The deep-grained, multi-width tiles
' `"s are available in six standard color blends.
iii
��, ;-,071.7.»...; �,�__.-..,.'� .."____,...i._______IJti f
r i 1 ---r
____i .....____, . ..
I iw
J { '
tit ._._,,.,u:
Chesapeake Mountain
� I ' -5.fr 111117 I 4... .
eaal
I
Ill ,
i
iI O
New Cedar tahoe Weathered Gray
Contact a DaVinci project specialist to learn more about how you can create your own color blend or custom color.
www.davinciroofscapes.com
NOTE:Printing reproduction o colors shown in this brochure may vary from actual product.
Low Maintenance & Easy Installation
DaVinci Multi-Width Shake polymer roofing tiles make installation easy—saving materials and cutting down on
installation costs.With little to no upkeep and backed by DaVinci's 50-year warranty, DaVinci shake tiles are the
perfect fit for your home for generations to come.
A Safer & More Secure Roof
DaVinci Multi-Width Shake has achieved the highest possible test ratings for fire, wind and impact giving
you a more secure home for your family and has been approved and preferred by cities and subdivisions
nationwide.
DAVINCI MULTI-WIDTH SHAKE SPECIFICATION CHART
Shingle Dimensions
Widths 9",8',7',6',4" Thickness at Butt 5/8"
Length 22" Thickness at Tip 1/4"
HIP* RIDGE•STARTER
6" Hip&Ridge One-piece Hip&Ridge 12'Valley Shingle 12"Starter
Pieces/ Bundle 20 10 10 20
Lineal Ft/Bundle 8,33' 8,33' 4.3" 20
Pieces/Lineal Ft 2.40• 2,40' 2.3* 1
•At recommended 7"exposure
FIELD SHINGLES PER ROOFING SQUARE
Coursing Roof Pitch Max.Exposure Bundles/Square Shingles/Square Weight I Square
Straight 4:12 or greater 10" 8 200 304 lbs
Staggered 4:12 or greater 9' 9 225 342 lbs
Note 1:All calculations are based on using the recommended 3/B' gap between shingles.
Note 2:Felt interlay is suggested on any pitch and required on pitches less than 6'in 12'
PACKING AND SHIPPING INFORMATION
#Shingles Weight
Per Bundle* 25 38 lbs
Per Pallet•• 1,200 1,824 lbs
Per Truckload'•• 28,800 43,776 lbs
All weights are approximate ••48 bundles per pallet 24 pallets per truckload
TESTING SUMMARY
Type of Test Standard Results
Fire Test ASTM E 108 Class A
Impact Test UL 2218 Class 4
Wind Test ASTM D 3161 Certified to 110MPH•
Building Code Approvals:ICC-ES ESR 2119,Miami-Dade County,FL NOA No. 13-0107.01 and TDI
'Go to www.davinciroofscapes.com for the most up-to-date technical information.
Toll Free: 800-328-4624 Phone: 913-599-0766 Fax:913-599-0065
MLMWSHcs-2/14
www.davinciroofscapes.com
DA\ cI DaVinci shake
Multi-Width Shake • Single-Width Shake
NSTALLATION GUIDE
DaVinci polymer shakes are carefully engineered to provide the authentic look of hand-split
shakes with dramatically increased durability and resistance to fire and impact. Special
care has been taken to make the product easy to install.By following these instructions,
and using good installation practices,you will be assured a quality installation.
NOTE TO INSTALLER /
DaVinci Shake offers a 5/8"thick profile,yet remains lightweight, because ' `
the shakes have an engineered rib structure.When cutting shakes for
valleys or at overhangs such as eaves and gable ends,the ribbed
support structure on the underside of the shake needs to be
hidden by standard metal flashings.In addition,DaVinci offers
a 12"solid accessory tile that can be used in these areas and J
:: :: ::::: :: :::::: :h1
ld t the d fl fng.
tspecial 1.
for accessories and installation at eaves(page 2),
gable ends(page 4)and valleys(page 7).
JOB SITE READY!
DaVinci shake bundles are delivered to the construction site pre-collated with
shingle widths and color variations in the ordered blend. This pre-planned
distribution produces the right aesthetic effect every time. Collated bundles also
simplify installation and save time by eliminating hand sorting on the job site.
. tt�r1
l�{ l lti
Multi-Width Shake
Widths: 9",8", 7", 6",4" Length:22" Thickness at butt: 5/8"
Single-Width Shake
Widths:9" Length:22" Thickness at butt:5/8"
This information is provided for the use of professional roofing contractors.This Installation Guide does not supersede local building codes
which should always be followed.DaVinci Roofscapes®does not warranty or have any responsibility for installation of its products.The
DaVinci Roofscapes Limited Fifty-Year Warranty outlines its warranty responsibilities for the roofing materials it manufactures.
For questions about DaVinci Shake or its application,contact DaVinci Roofscapes®,LLC
913-599-0766 or 800-DaVinci(800-328-4624)or www.davinciroofscapes.com
Please be sure to check DaVinci's website for updates.Installation Guide is subject to change without notice.
MLIGSH-06/14 Pg.1 of 10
INSTALLATION Decking
Distance from butt-line Felt Interlay
to felt is equal to twice
DECKING the shingle exposure
Shingle
DaVinci Shake must be installed on a smooth flat surface(plywood or OSB); exposure -
minimum 15/32"APA approved plywood or 7/16"approved OSB. It is necessary' 4r it
that all previous roofing materials be removed prior to installation of DaVinci
Shake.Imperfections in the decking may transmit through to finished roof.
DRIP-EDGE
Metal flashing is required on gable ends and eaves.An overhanging drip
edge is recommended on gable ends to help mask the rib structure on
the underside.An overhanging drip edge may also be used on eaves
although non-overhanging drip edge styles are acceptable options. ,, 1-•' �► -
Style D or Self-Adhered
SELF-ADHERED MEMBRANE Style F Drip Edge . Membrane
(Severe Climate Underlayment in accordance with Chapter 15 of the UBC) can be used Starter Course
In areas where the average daily temperature in January is 25°F or lower or where ice buildup is possible,DaVinci requires
self-adhered membrane be installed: from the bottom edge extending two feet above the exterior wall line on all eaves.The
self-adhered membrane is required in all valleys regardless of average daily temperatures or the possibility of ice buildup.
UNDERLAYMENT AND INTERLAYMENT
Method 1: Class A installation
One layer of GAF VersaShielde Fire—Resistant Roof Deck Protection(ESR-2053)in addition to required self-adhered membrane.
Method 2: Class A Installation
One layer Fontana VulcaSeal G40 in addition to required self-adhered membrane(This system is not recognized by ICC-ES).
Method 3: Class C Installation
The entire roof must be covered with an approved underlayment in addition required self-adhered membrane.
Pitches below 6:12—DaVinci Shake should be installed with 30 lb felt interlay.Felt interlay is installed by rolling out 18"
wide rolls of 30 lb felt at the same exposure as the shakes.The felt should be applied over the top portion of the shakes and
extend onto the plywood sheathing so that the bottom edge of the felt is positioned at a distance above the butt equal to twice
the weather exposure. So for an exposure of 10",start the layer of felt 20" above the butt line of the course below.If a class A
installation is required the felt interlay must be used in addition to the other required underlayments.An alternative to using felt
interlay is to use two layers of approved underlayment with their laps offset.If class A is required one of these layers may be
GAF VersaShield or Fontana VulcaSeal G40.
Note 1:Underlayment and Asphalt Shingles are listed Class A components of a listed roof deck assembly by an Approved Agency.The third
party program in which products are certified,carry a label,and are listed in the directory of an agency accredited by the International
Accreditation Service,Inc.(IAS),or by an accredited body that is a partner with IAS in a mutual recognition arrangement,pertaining to
certification bodies and their compliance with ISO/IEC Guide 65,General Requirements for Bodies Operating Product Certification Systems.
These underlayment and asphalt shingle components are to meet Class A Classification when tested to ASTM E108 or UL 790.
Note 2:Underlayment and Asphalt Shingle components are to be installed with mechanical fasteners in accordance with the manufacturer's pub-
lished installation instructions.Self-adhering or adhesive applied underlayment and asphalt shingle installtions are outside the scope of this listing.
FASTENERS
Tiles should be installed with nails long enough that they will penetrate through the roof deck by at least 3/16". In most
instances, 13/4"roofing nails are acceptable. We recommend copper,stainless steel,or hot-dipped galvanized nails.
Ring-shank nails should be used in high wind areas.
STARTER COURSE
Each starter tile should be installed so that it extends past the drip edge by approximately 1".If using overhanging drip edge,the
starter shingle may overhang less if it is appropriate for the gutter system.The starter tiles should be installed with the DaVinci
logo on top. The starter tiles should be spaced 3/8"apart as tiles will expand when warm.Each starter tile should be nailed with
two approved nails on a line approximately 6" from the butt and 3/4" from outside edge.
MLIGSH-06/14 c,Pg.2 of 10
INSTALLATION
GETTING STARTED
Use approved nails in each shake at or near nailing location shown on the shakes(see page 10).Nails may be placed lower than
the indicators as long as the tile above it covers the nail.Once the starter tiles are in place,begin installing shakes in the lower
left corner(or lower right corner for a left-handed roofer).The shakes should be flush with the starter tiles on the outer(rakes)
and lower(eaves)edges.DaVinci recommends a minimum 3/8"gap between shakes.
Two methods of installation are available:
1.Straight: in which the exposure of each shake is kept consistent
2. Staggered: in which the exposure varies by a maximum of 1"on adjacent shakes
Use the alignment indicator at the top of each shake to help manage the exposure.An exposure of between 9"or 10" is
acceptable for straight courses and 9" for staggered courses.As you progress up the roof,be careful not to damage shakes a
ready in place.Put something,perhaps a piece of cardboard or cut shake, under toe irons(scaffolding brackets)to avoid
scratching or marring the shake already installed below.
STRAIGHT COURSING
Install the shakes one at a time starting in the lower left hand Straight Coursing on DaVinci Shake at a 10"Exposure
corner if right handed or lower right hand corner if left
handed.The first course of shakes should be laid directly on
42"
the starter tiles with the butt of the shake flush with the butt Nail
of the starter tile.The shakes should be installed individually • • •/holes\• • • •
with two nails in or near the defined areas.The shakes should 32"
be laid individually with a rack type system,also known as
rack-style,stair-stepping,or pyramiding;to prevent same size
shake directly on top of another.The shakes should be laid
with an approximate 3/8"gap between each shake.The gaps — — — — — — — — — —22"
between shakes on adjacent courses should offset by a
minimum 1%2".To assure proper horizontal alignment we
recommend that chalk lines be snapped frequently.These chalk
lines should be placed on the underlayments so that the shakes
are aligned by the tips of the tiles rather than the butts. It
Chalk lines should be snapped on underlayment with the tips of 3/8"Gap between each shingle
the shakes following the lines.Do not snap lines on DaVinci Shake
or use red chalk as the chalk may permanently discolor the shake.
Staggered Coursing on DaVinci Shake at a 9" Exposure
STAGGERED COURSING
Staggering the courses is accomplished by laying the shakes — 40„
Nail
in 9" courses with every other shingle lowered 1". holes
An example of how to accomplish this is as follows: • ' �•
Step 1: Lay the first course of shakes flush on top of the
starter.Then snap a horizontal line 9"above the tips of the
shakes you just installed or 31"from the eave line(butt of •
the shake you just laid).
—22"
Step 2: The first shake on second course should be 9"
installed putting the tip of the shake on the chalk line.The
next or adjacent shake should be 1" below the line.The •
third shake should be on the line;the fourth shake should 9„
be below the line.This continues in the same pattern all \
the wayacross the roof one shingle tipon the line and between Gap
g each
the next 1" below the line. shingle
Pg.3 of 10
MLIGSH-06/14
INSTALLATION
STRAIGHT COURSING (Continued)
,-: _:-• , .Atot
Step 3: Snap another horizontal line 9"above the line you chalkedll
in Step 2 or 40"above the butt of the first course of shakes.Start laying :I �,�
shakes as in Step 2 with the first shake tip on the line and the next %
shake tip about 1"below the line. �,4'-_,,,411r
/ it f
Step 4: Continue up the roof in this manner.Every course does not i- '/(/
00
need to be chalked.As roofers begin to understand the concept,they
may use alignment indicators to accomplish the stagger.However,we
do recommend frequent horizontal chalking to assure correct alignment.
Chalk lines should be snapped on underlayment with the tips of the
shakes following the lines.Do not snap lines on DaYinci Shake or use Field Shakes should extend
red chalk as the chalk may permanently discolor the shake. '/<"past the overhang drip
Single-Width 9" Shake Installation Tip:4 'h"or 5"setback pattern edge on gable ends(rakes).
Method 1:A 5"setback pattern is recommended.In this method,
starting from the bottom course,each 9"shake is set back 5"from
GABLE ENDS/RAKES
the shake on the adjacent course.This pattern is most easily established
by using a roofing hammer with gauge set at 5':Once the pattern has Cutting DaVinci Shakes at gable ends,or where a course
been established the setback should be checked occasionally. terminates can almost always be avoided by choosing from the
Method 2:A 4'/"pattern may also be used.In this method,starting five different shake sizes and adjusting the spacing between
from the bottom course,each 9"shake is set back 4'/i'from the shake shakes. In the rare case when cutting is required, shakes should
on the adjacent course.This method requires that the pattern be straight be cut so that the factory edge faces out on the gable end.
vertically as well as horizontally because the breaks between shakes on
alternate course are aligned.With this method we recommend frequent Single-Width Shake Installation Tip
vertical chalk lines so that the pattern may be checked regularly. The shakes are all 9"wide so must be cut at gable ends and any
abutments.The 9" shakes should be cut so that the factory edge is
GAP on the outside.
The recommended gap between shakes is 3/8"with a minimum
3/16"gap required.The number of shingles per square for DaVinci CUTTING
Shake is based on the assumption of 3/8"spacing between shakes. DaVinci Slate may be cut with a utility knife and straight edge.
If spacing is less,more shingles per square will be required. It may also be cut effectively with a circular saw. Carbide tooth
AVOID "CRACK ON CRACK" blades are recommended for maximum blade life.
The gap between two shingles in one course should always line up
1'/"or more from the gap between two shingles in the course below. -` - ,f
r 4F
Correct
, r
Y
F COLOR AND WIDTH VARIATION
Incorrect DaVinci multi-width field shakes come in five widths:
9",8'; 7',6" and 4". Each bundle contains a mixture of 25
l shakes and includes a pre-collated assortment of widths and
�____-�__ colors needed for each color blend. Single-Width Valore shakes
` • come in a single 9"width with 20 shakes per bundle. DaVinci
il , Roofscapes recommends that the shakes should generally be
l' ._--- �...� installed as they come out of the bundles.Keep in mind there
`��� must be 1'/" side lap maintained and installation must be in a
riii! iiii,iir i iit ill • rack or pyramid style.
MLIGSH-06/14g1Q
INSTALLATION
ONE-PIECE HIP AND RIDGE APPLICATION:•HIP AND RIDGE PREPARATION
DaVinci one-piece hip and ridge shakes have an optimum appearance when used on pitches of 12:12 or less. Steeper pitches
may cause outside edge to lift and it is recommended the conventional two-piece hip and ridge method be used for pitches
greater than 12:12.Roofing nails that penetrate through the roof deck and exceed it by 3/16" should be used.
RIDGE VENT APPLICATION
If using a continuous ridge vent we recommend a rigid shingle roll-over type. Once the continuous vent is installed,
prepackaged 12"DaVinci One-Piece Hip and Ridge shingles should be installed in accordance with the standard hip and
ridge installation instructions below. Special caution should be used when cutting the decking on the ridge to assure adequate
nailing for the ridge pieces.
DAVINCI ONE-PIECE HIP AND RIDGE SHINGLE INSTALLATION
• DaVinci Shake one-piece hip and ridge should be installed at a 10"exposure with two roofing nails in each piece.
• A pair of 6" shakes should be used as a starter course underneath the first piece of hip and ridge.These 6"tiles should
be cut so that they are approximately 5"widths and they should also be cut in length so that they don't extend beyond
the top of the second course of field tiles.If preferred on the bottom of a hip the two 6"DaVinci Shakes may be placed
upside down so that the rib structure on the underside is not visible.
• When installing the hip and ridge attempt to nail in areas where the underneath shakes offer support.It is not necessary
to nail precisely in the nailing circles.This is especially important on hips.Roofing nails that penetrate through the roof
deck by 3/16" should be used.
_r qY
-#
k 1_
\\,
-4NN-,.. ...,
i
I , ..--
,</iN.'..s'N'-.. : i )„,.---
, < i),...,,,, N'N '..,, ,,.., .
1 ,7's4
I. a •. ,,,,. \
...,..., i
..,,,.. NR./1 I ‘ . . • .,
,
L.,..:„:„.,._:,:.,,,,
-'1'.. T.,...,...7.>"........,"'
',..;:
:1/4....,.........../ . .
,,,,...s..1 .// 1 \
0#7.-".. r>"'... 1
4111
12"DaVinci Shake
10"exposure �`'� f
One-Piece Hip and Ridge
}
MLIGSH-06/14 Pg.5 of 10
INSTALLATION
TWO-PIECE HIP AND RIDGE APPLICATION: HIP AND RIDGE PREPARATION
After installing field shakes,hips and ridges should be prepared by installing a minimum 6"wide piece of non-corrosive
metal,UV stable EPDM or equivalent over the hips and ridges. This metal or EPDM should extend at least three inches from
the center point on each side of the hip or ridge.
RIDGE VENT APPLICATION
If using a continuous ridge vent we recommend a rigid shingle roll-over type.When installing continuous ridge vent,care
should be taken to insure joints in ridge vent are water tight. Once the continuous vent is installed,prepackaged 6"DaVinci
hip and ridge shakes should be installed in accordance with the standard hip and ridge installation instructions below. Caution
should be used when cutting the decking on the ridge to assure adequate nailing for the ridge pieces.Roofing nails that penetrate
through the roof deck and exceed it by 3/16"should be used.
TWO-PIECE HIP AND RIDGE SHINGLE APPLICATION
The bottom piece of hip and ridge should be cut so the tip does not extend past the butt of the second course.If preferred on
the bottom of a hip,two 6"DaVinci Shake cut 5"wide placed upside down can be used as an under course.This will prevent
the rib structure from being seen on the underside.These shakes that make up a hip and ridge unit should be installed with a
ten-inch exposure.Using a chalk line to assure straightness,the prepackaged 6"hip and ridge should be installed one piece at
a time so that the butts of two shingles are adjacent and the inside edges touch.
Non-corrosive metal
\,
ks
r
i ./ , .
j
, / • . 1 ' ' \. \ e'''C
•
• 6
i N
1‘,/,:
,.,
s.. it', i s_ .„,.-\
, .1, F 7....,,,,,,.. ,..,, .
of V=. ' �" t
LW exposure - 6"DaVinci Shakes
MLIGSH-06/14 C Pg.6 of 10
INSTALLATION
VALLEYS
Because DaVinci Shake has a rib-structure on the underside*,care must be used when installing DaVinci Shake in valleys.
Open or closed valley systems may be used with variants of each system.Whether installing an open or a closed valley system,
valley metal should be made from 24"stock of copper,minimum .019 aluminum,or minimum 28-gauge clad steel.DaVinci
requires self-adhered membrane be used in all valleys.
*A 12"solid shake accessory tile is available.
OPEN VALLEYS
If open valleys are preferred, be aware that the cut edge of the tile may be seen.Location of the valley,roof pitch and height
of roof should be considered in determining if the cut tiles will have an acceptable appearance.
Option A:In many cases,with steeper pitched roofs,it is acceptable to Option A
install a"W"valley and cut the DaVinci Shake on an angle parallel and Single Diverter Valley Metal
2W'from the center diverter.Keep in mind that the cut rib structure of the 7"
shakes may be visible from the ground with some roof pitches.
DaVinci offers 12"solid tiles if the rib structure or open area under DaVinci iov_"
shakes is a concern.
Option B
Option B: Double"W"valley.This should be made from 24" stock that Twin Diverter Valley Metal
is broken in the middle without diverter to look like a"V': Additionally,
there should be a"W"(diverter)on either side 2W'from the center line. / I'%"
(See Diagram)DaVinci Shake should be cut and laid against the diverters
on either side to mask the rib structure.
to°
Valley metal(Option A or B)
Valley metal broken from 24"stock.
The top corner of the shake closest to Self-adhered membrane is
the center of the valley should be cut required in all valleys.
off at a 45°angle. Use wider shakes adjacent to
valley where possible.
Nail as far from center as •
practical.Try to not nail 'A
1 . /
closer than 5"from center. Y
I`
' • . /
• \ . \ _ . 1
:p_,. -C1..''r
r 7- ---
4.
MLIGSH-06/14 O.P- of 0
INSTALLATION
CLOSED VALLEYS
A closed valley can be achieved by using valley metal option(A or B).In our preferred method,option A,valley metal with a
single, narrow-based diverter in the middle is used and the DaVinci Shakes are cut and butted to the diverter.An alternate is
to use standard"W"valley with the shakes butted against the diverter.Wider shakes should be used as valley cuts in order to
ensure that nailing be kept at least 5"from center or as far from center as possible.
Option A
Option A: Install valley with a standing seam in the middle and Standing Seam Valley Metal
place already-cut DaVinci Shake against center standing seam. i w
\ lo%:"-11"
Option B: It is acceptable to install a"W"valley and place an Option B
all ready-cut DaVinci Shake against center diverter.Metal should be Single Diverter Valley Metal
broken with a diverter at least 11/4"tall. 1 ya„
ta'i"
Valley metal broken from 24"stock. Valley metal(Option A or B)
The top corner of the shake closest to Self-adhered membrane is
the center of the valley should be cut required in all valleys.
off ata 45°angle.
Use wider shakes adjacent to
' valley where possible.
Nail as far from center as �'
practical.Try to not nail rr` /°
closer than 5"from center.
MLIGSH-06/14 ( Pg.8 of 10
SPECIAL ISSUES
FLASHING i . 4.
y. fFold down
Flashing should be used in all areas , ,. counter flashing
where the roof abuts a vertical wall, '•- ,.,r....>r over step flashing.
dormer,chimney,skylight or other s
structural protrusions. Fasten flashing
ry ' ,4___------ to roof.
Use the step flashing method,with - .
copper,a minimum of 28-gauge clad Succeeding
steel,or a minimum .019 aluminum ,, flashing pieces
flashing.The flashing should extend 14"long with
4"overlap.
4"upvertical walls. - - --
First piece of
Counter
i !
Flashing flashing is 14"
Apron
Flashing - � Mini
Jr ,f mum Lengths
VENTILATION7-
l4'
../1 „.-
In some climatic regions of the country,proper
ventilation is crucial to the performance of a roofing i /-
system.Proper ventilation is especially important
in cold climates where modern houses are well 4•'
insulated and weather-tight.We suggest you follow
standard building practices in your area and meet
all national and local building codes.A continuous
ridge vent combined with proper intake or eave
ventilation is an especially effective ventilation
system,and one that we highly recommend. Continuous Vent
SNOW GUARDS }.' ;, , _ One square foot of
.,� __ vent for every 300
square feet of attic.
Snow guards should be considered in all geographic _------2-7
17--
areas where accumulating snow fall is possible. V' •• _ A`—
1.Most kinds of brass,copper,or clad aluminum f
snow guard systems work well with DaVinci. / 'J� r!, \.
Rocky Mountain Snow Guards,Inc. is good source -_j r j,_ ,
for further information about snow guards.Contact • . • {A,. \
them at www.rockymountainsnowguards.com / .'/ r � C
or call 877-414-7606.It is recommended that snow i ;, f ice-
guards be installed during the installation of the " . :'_ y j,
�� a r;y _
DaVinci roof although retro-fit snow guards are Z. /, � ` /f r
available for previouslyinstalled DaVinci roofs. a /,
Details regarding installation remain the _ - -- --I . a----
responsibility
'�responsibility of the installer and the customer. --` _ 'rte Soffit Vents
-----7---_ __; ' lir
For additional information please see Q&A Guide to Snow Guards at www.davinciroofscapes.com/technical-downloads.php.
Consult with your local contractor to determine if snow guards would be appropriate for your project.
DaVinci makes no representations or warranties about the propriety of snow guard installation on any given
project. Rather,the decision to install snow guards rests solely with the end user.
Pg.9 of 10
MLIGSH-06/14
PRODUCT FEATURES
EXPOSURE
ROOF PITCH COURSING INTERLAY MAX.EXPOSURE Exp,:.
Less than 3:12 Not Recommended Align
less than 6:12 Staggered Required* 9"
less than 6:12 Straight Required* 10"
6:12 or greater Staggered Recommended 9"
6:12 or greater Straight Recommended 10" I
j
Felt interlay is suggested on any pitch and required on pitches less than 6"in 12'.' I
*If two layers of Fontana VulcaSeal is used interlay is not required. 5 . t l'.
• ! ;�ura • ) . ,,i
NAILING
Each shake should be applied with two copper,non-corrosive stainless steel,
or hot-dipped galvanized,3/8"head x 1'/4"length nails in most instances.
Roofing nails that penetrate through the roof deck and exceed it by 3/16"
should be used. Shakes can be nailed by hand or with a pneumatic nail gun. i
Don't overdrive nails or drive nails at an angle.Keep the nail head flush with 1 i
the surface of the shingle to avoid creating"craters"which can collect moisture 1 • i t4 1 : ,
and can also prevent the exposed end of the shingles from laying flat. '
,I 1 ' i
Use these alignment guides with the top edge of the previous row of shakes
to control the exposure. •
i
CUTTING
DaVinci Shake can be cut with a utility knife and straight edge. QUICK REFERENCE
Electrical circular saws(carbide blade,two teeth per inch)or
cordless circular saws(a minimum of 18 volts is recommended) • Don't overdrive or install nails at an angle
may also be used. • Always leave a gap between all tiles
Please note:DaVinci Shake is made flat,should be stored flat and • Vertical,always install up the roof not one row
must not be installed unless it is flat and in its original form.If shakes across the roof at a time
are not stored flat and become twisted or curled, lay them flat in a • Install over a clean plywood deck only
warm place and they will return to their original flatness.Damaged • Never use red chalk
shake should never be installed. • Cut edges always go to the inside along rake
edges or gable ends
ELECTRO-GALVINIZED NAILS • Install snowguards in any snow prone area
DaVinci recommends the use of copper,stainless steel,or
hot-dipped galvanized nails.We realize however that in many ISSUE DAVINCI ACCEPTABLE
climatic regions nail corrosion is not a factor in the long-term RECOMMENDS ALTERNATIVES
performance of the roof system.Therefore DaVinci Roofscapes Valley Copper 28-gauge clad metal
supports the use of Electro-galvanized nails and a system using Flashing Copper 28-gauge clad metal
those nails will be in compliance with the DaVinci Fifty-year
Limited Warranty.The exception to that is that if the nails fail, Eaves Flashing Copper 28-gauge clad metal
any portion of the warranty associated with wind performance
Nails Non-Corrosive Hot-dipped
would be void. Stainless Steel Galvanized
For questions about DaVinci Shake or its application,contact DaVinci Roofscapese,LLC
913-599-0766 or 800-DaVinci(800-328-4624)or www.davinciroofscapes.com
Please be sure to check DaVinci's website for updates.Installation Guide is subject to change without notice.
MLIGSH-06/14 c` Pg.10 of 10