Loading...
HomeMy WebLinkAboutFP1.pdfMAIN LEVEL FLOOR PLAN FINISHED FLOOR 46' - 6" UPPER LEVEL FLOOR PLAN FINISHED FLOOR 57' - 6" LOWER LEVEL FINISHED FLOOR 34' - 6" MUDROOM 111 MECH 001 GARAGE 113 T.O. CONC. WALL @ 45' - 1 5/8" E E T.O. CHIMNEY CAP @ 69' - 10 1/8" T.O. STEEL BEAM @ 45' - 3" T.O. STEEL BEAM @ 58' - 5 1/8" T.O. STEEL BEAM @ 61' - 9 7/8" T.O. STEEL BEAM @ 68' - 1" T.O. CHIMNEY @ 65' - 6 1/8" Flush 11 2" Single FDC Horn & Strobe Check Valve 1 1/2" pendent head in ceiling 54 heads for this project 3 19 15 MIS-REPRESENT THE EXACT LAYOUT OF THE LAYOUT & CALCULATIONS. AID THE AUTHORITY HAVING JURISDICTION WITH SPRINKLER SCHEMATIC MAY IN SOME CASES SPRINKLER SYSTEM. IT IS INTENDED TO HELP 5151 Bannock St. Denver, CO 80216 303-291-1012 303-383-5023 FAX firesprinkler@afssco.com A FIRE SPRINKLERDESIGN COMPANY ACCEPTING THIS COPY IS DEEMED AS AGREEING TO THE FOLLOWING: THIS DRAWING COPY, ITS CONTENTS, INFORMATION AND PRINCIPALS OF DESIGN ARE THE EXCLUSIVE PROPERTY OF THE FIRE PROTECTION CONTRACTOR LISTED AND MILE HIGH DESIGN GROUP, LLC AND IS BEING SUBMITTED TO YOU WITH THE UNDERSTANDING THAT IT IS NOT TO BE REPRODUCED, COPIED OR MODIFIED IN ANY MANNER; NEITHER SHALL IT BE RELAYED IN WHOLE OR IN PART TO ANY OTHER INDIVIDUAL OR FIRM FOR ANY OTHER PROJECT OR EXTENSION OF THIS PROJECT EXCEPT THRU WRITTEN AGREEMENT WITH THE FIRE PROTECTION CONTRACTOR AND MILE HIGH DESIGN GROUP, LLC. ERRORS AS A RESULT OF THIS FILE BEING ELECTRONICALLY TRANSMITTED ARE BEYOND THE CONTROL OF AND ARE NOT THE RESPONSIBILITY OF THE FIRE PROTECTION CONTRACTOR OR MILE HIGH DESIGN GROUP. MILE HIGH DESIGN GROUP IS NOT RESPONSIBLE FOR INSTALLATION OR INSPECTION OF WORK INSTALLED. THESE PLANS ARE DIAGRAMMATICAL ONLY. ON SITE COORDINATION MUST BE ARRANGED WITH ALL OBSTRUCTIONS, i.e.: MECHANICAL, ELECTRICAL, AND STRUCTURAL. ANY ALTERATIONS FROM ENGINEERED DRAWINGS MUST BE APPROVED BY MILE HIGH DESIGN GROUP. MILE HIGH DESIGN GROUP IS NOT RESPONSIBLE FOR LAYOUT DESIGN ISSUES OR CONFLICTS WITH ANY OBSTRUCTIONS. IF ADDITIONAL FIRE SPRINKLER PIPING AND/OR FIRE SPRINKLER HEADS ARE REQUIRED THIS WILL BE THE RESPONSIBILITY OF THE FIRE SPRINKLER CONTRACTOR. ALL CHANGES MUST ME APPROVED BY MILE HIGH DESIGN GROUP, LLC THE OWNER IS RESPONSIBLE TO PROVIDE SUFFICIENT HEAT THROUGHOUT THIS BUILDING TO PREVENT FREEZING OF WATER IN THE FIRE SPRINKLER SYSTEM - 3 heads T/S T/S Reviewed for code compliance. Vaughan 0355 Vail Fire & Emergency Services 05/29/15