HomeMy WebLinkAboutFLD15-0002 Permit.pdfTOWN OF VAIL PUBLIC WORKS DEPARTMENT
1329 ELKHORN DRIVE
VAIL, CO 81657
phone: 970.479.2158 fax: 970.479.2166 inspection line: 970.479.2149
NOTE: THIS PERMIT MUST BE POSTED ON JOBS/TE AT ALL TIMES
FLOOD PLAIN PERMIT Permit #
Project#
Job Address: 1778 SUNBURST DR VAIL Status ....... :
Location ..... : VAIL GOLF COURSE CLUBHOUSE Applied ...... :
Parcel No ... : PRJ12-0156 Issued ....... :
OWNER TOWN OF VAIL 09/16/2015
IN CARE OF FINANCE DEPT
75 S FRONTAGE RD
VAIL co 81657
APPLICANT EVANS CHAFFEE CONSTRUCTION G 09/16/2015 Phone: 970-845-0466
MICHELLE EVANS
PO BOX 8266
AVON
co 81620
License: C000003077
CONTRACTOR EVANS CHAFFEE CONSTRUCTION G 09/16/2015 Phone: 970-845-0466
MICHELLE EVANS
PO BOX 8266
AVON co 81620
License: C000003077
Desciption of Work: INSTALLATION OF NEW STORMWATER SEWER LINE
FLD15-0002
PRJ12-0156
ISSUED
09/16/2015
09/17/2015
*********************************************************** FE:E: ~lJIVllVI"-~~ ****************************************************************
Flood Plain Permit Fee----->
Bond Required--------------->
$300.00
$0.00
Fees Paid----------->
BALANCE DUE---->
$0.00
$0.00
TOTAL FEES--------------> $300.00
*************************************************************************************************************************************************
DECLARATIONS
I certify that I have read all chapters of Title 12 of the Vail Municipal Code and all utility company agreements, signed by me,
and will abide by the same, and that all utilities as required. Public Works will have a spec/detail book available April of 1998.
REQUESTS FOR INSPECTION SHALL BE MADE FORTY-EIGHT (48) HOURS IN ADVANCE BY TELEPHONE AT
970-479-2149 OR AT OUR OFFICE FROM 8:00 AM -4 PM.
Signature of Owner or Contractor Date
Print Name
flood
Conditions for FLD15-0002 11:29 09/17/2015 Sec Item Id Description Aon roved Rea Date Items Action Inheritable Item Origin * CON001431 All grading within 100 Year Floodplain No 0 09/17/2015 0 No CONDITIO 9 must be returned back to existing N conditions and grades prior to final inspection. As-built survey may be required. * 400 A pre-construction and post No 0 09/16/2015 0 No construction survey will be required for this work. The post construction survey must match the pre-existing conditions at all locations within the floodplain. Total Rows: 2 Page 1