Loading...
HomeMy WebLinkAboutSnowguard layout.pdf ROCKY MOUNTAINMI 2055 S. Raritan St. Denver,CO 80223 SNOW GUARDS INC (877)414-7606 Fax: (720)387-8361 www.rockymountainsnowguards.com Snow Guard Layout Pattern Job Name: Sierra Condos Location: Vail, CO Contractor: G and G Roofing Material: Asphalt Shingles Slope: 4/12-8/12 Ground Snow Load: 145 Peak \ \ \ \ \ \ 2) Additional Rows (if required) 1 \ \ \ \ 1 \ C. Vertical Spacing 24" \ k 1 1 \\l' \ \ \ D. Horizontal Spacing 36" 0/C \ \ \•.'•. \ \ \ ‘,A 1 1 Additional rows continue to peak \ \ \ \ 1 1 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ c \ 1 1`,�;\ \ \ \\ \ \ \ 1 ` 1 \ \ 1 \ \ \ \ \ \ \ 1 1 1 1 1 1 1 1) Minimum 3 Row Eave Pattern: \ v-,,, \ V \ \\ \ A A. Horizontal Spacing 24" O/Cl B. Vertical Spacing 12" `�' 1 \ 1st Eave row is placed above exterior \ 1 1 T` \ 1` ` wall. iv iv Eave Note: Roof support structure should always be reviewed to make sure that the additional snow held on the roof will not cause structural issues. Note: On asphalt shingle roofs less than 8/12 pitch where ground snow loads do not exceed 110 psf, additional rows are not required above the minimum 3 row snow guard layout. T 1 r