Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Snowguard layout.pdf
ROCKY MOUNTAINMI 2055 S. Raritan St. Denver,CO 80223 SNOW GUARDS INC (877)414-7606 Fax: (720)387-8361 www.rockymountainsnowguards.com Snow Guard Layout Pattern Job Name: Sierra Condos Location: Vail, CO Contractor: G and G Roofing Material: Asphalt Shingles Slope: 4/12-8/12 Ground Snow Load: 145 Peak \ \ \ \ \ \ 2) Additional Rows (if required) 1 \ \ \ \ 1 \ C. Vertical Spacing 24" \ k 1 1 \\l' \ \ \ D. Horizontal Spacing 36" 0/C \ \ \•.'•. \ \ \ ‘,A 1 1 Additional rows continue to peak \ \ \ \ 1 1 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ c \ 1 1`,�;\ \ \ \\ \ \ \ 1 ` 1 \ \ 1 \ \ \ \ \ \ \ 1 1 1 1 1 1 1 1) Minimum 3 Row Eave Pattern: \ v-,,, \ V \ \\ \ A A. Horizontal Spacing 24" O/Cl B. Vertical Spacing 12" `�' 1 \ 1st Eave row is placed above exterior \ 1 1 T` \ 1` ` wall. iv iv Eave Note: Roof support structure should always be reviewed to make sure that the additional snow held on the roof will not cause structural issues. Note: On asphalt shingle roofs less than 8/12 pitch where ground snow loads do not exceed 110 psf, additional rows are not required above the minimum 3 row snow guard layout. T 1 r