Loading...
HomeMy WebLinkAboutB16-0401_2017-8406 CASCADE CLUB PARKING FINAL REPORT 7-19-17_1505253960.pdf NEBB Certification #3235 JEDI Balancing, Inc. Certification #BB009025C 568 Briggs Street (physical) P.O. Box 525 (mail) Erie, CO. 80516 Phone (720) 839-5333 www.jedibalancing.com Testing, Adjusting & Balancing Certified Report Project Cascade Club -Parking Address 1295 Westhaven Drive Vail, CO 81657 Architect Unknown Mechanical Engineer Unknown Contractor Skyline Mechanical, Inc TABB Certified Supervisors Don Pittser & Bryan Hund & Daniel Pegues Date 7/19/2017 Job Number 2017-8406 09/12/17 Instrumentation: Digital Manometer Alnor Balometer EBT-721 Flowhood Alnor Balometer EBT-721 Digital Pressure Gage Alnor Hydronic Manometer HM-680 Tachometer DT-36M Digital Volt-Amp Meter Fluke 335 Thermometer Alnor Balometer EBT-721 Method of Balancing: Supply, Return and Exhaust diffusers, grilles and registers were measured with an Alnor Balometer EBT-721. Heating and Chilled water flow rates were measured with an Alnor Hydronic Manometer HM-680 connected to the installed flow meters. Warranty Information: This project was completed according to NEBB Procedural Standards. The data presented in this report is a record of system measurements and final adjustments that have been obtained in accordance with the current edition of the NEBB Procedural Standards for testing, adjusting, and balancing environmental systems. Any variances from design quantities, which exceed NEBB tolerances, are noted in the Test-Adjust-Balance Report Project Summary. If a Test-Adjust-Balance Report Project Summary is not issued directly following this cover page, all measurements met the design requirements as specified by the design mechanical engineer. This project has a one-year guarantee on all Testing, Adjusting & Balancing from the date listed on this cover page. Don Pittser President NEBB Certified Professional TABB Certified Supervisor 09/12/17 Abbreviation Index TAB: Testing, Adjusting & Balancing Cx: Commissioning AHU: Air Handling Unit Motor FLA: Full Load Amperage RTU: Roof Top Unit S.F.: Service Factor PACU: Packaged Air Conditioning Unit OD: Outside Diameter MAU: Make Up Air Unit P.F.: Power Factor FCU: Fan Coil Unit Nom. Eff.: Nominal Efficiency CRAC: Computer Room Air Conditioning Unit RPM: Revolutions per Minute VAV: Variable Air Volume T1: Terminal 1 K Factor: Correction Factor T2: Terminal 2 FPB: Fan Powered Box T3: Terminal 3 AK: Area Correction PSI: Pounds per Square Inch Design D.P.: Design Differential Pressure TDH: Total Dynamic Head Actual D.P.: Recorded Differential Pressure CS: Circuit Setter Ind.Imp.Dia. Indicated Impeller Diameter BV: Balance Valve CUH: Cabinet Unit Heater Valve D.P.: Discharge Pressure UH: Unit Heater Valve S.P.: Suction Pressure ERV: Energy Recovery Ventilator ERU: Energy Recovery Unit EF: Exhaust Fan PEF: Power Exhaust Fan KEF: Kitchen Exhaust Fan SF: Supply Fan RF: Return Fan TF: Transfer Fan Diff.: Differential SEF: Smoke Exhaust Fan SPF: Stairwell Pressurization Fan DX: Direct Expansion SACU: Spilt Air Conditioner Unit SP: Static Pressure TSP: Total Static Pressure in. wc: Inches Water Column ESP: External Static Pressure HW: Heating Water VP: Velocity Pressure CHW: Cooling Water SA: Supply Air CW: Condenser Water RA: Return Air HX: Heat Exchanger OSA: Outside Air SWD: Sidewall Diffuser OA: Outside Air EAT: Entering Air Temperature MA: Mixed Air LAT: Leaving Air Temperature SD: Supply Diffuser EWT: Entering Water Temperature CD: Ceiling Diffuser LWT: Leaving Water Temperature ER: Exhaust Register MVD: Manual Volume Damper RG: Return Grille OBD: Opposed Blade Damper CFM: Cubic Feet Per Minute NAC: No Access FPM: Feet Per Minute NG: Not Given SSD: Square Supply Diffuser NIC: Not in Contract SRD: Square Return Diffuser E: Existing TG: Transfer Grille cm: Centimeter l/s: Liters per Second M: Meter mm: Millimeter Pa: Pascal kPa: Kilopascal CMH: Cubic Meters per Hour 09/12/17 GENERAL NOTES SEE ALL FIELD NOTES LOCATED BELOW EQUIPMENT DATA 09/12/17 Table Of Contents PROJECT: LOCATION: CASCADE CLUB PARKING VAIL, CO 2017-8406 PROJECT #: DATE: CONTACT: 7/19/2017 Josh Cota Table Of Contents 1 Fan Unit........................................................................................................................................................................ 1 1.1 EF-01...................................................................................................................................................................... 1 1.2 EF-02...................................................................................................................................................................... 2 1.3 EF-03...................................................................................................................................................................... 3 JEDI Balancing, Inc. 09/12/17 Fan Unit PROJECT: LOCATION: CASCADE CLUB PARKING VAIL, CO 2017-8406 PROJECT #: DATE: CONTACT: 7/19/2017 Josh Cota Tested By: Bryan Hund Date: 7/10/2017 SYSTEM/UNIT: EF-01 Log: EF-01 7/10/2017 Bryan Hund WITH BIRD-SCREEN AND SAFETY GRILL. FREE AREA CALCULATED AT 35X35 OR 8.5 SQFT. 941 FPM REQUIRED. ACTUAL 977 OR 8305 CFM Unit Data Fan Manufacturer COOK Fan Model Number 36EP6 Fan Serial Number 185SG65454-01/0000701 Rated CFM 8000 Total SP Design 0.75 in. wc Total Connected CFM 8000 Starter Data Starter Manufacturer BUILT IN Test Data Total CFM Actual 8305 Fan RPM Actual 1168 Motor Volts 1 Actual 211 Motor Volts 2 Actual 210 Motor Volts 3 Actual 210 Motor Amps 1 Actual 6.1 Motor Amps 2 Actual 6.03 Motor Amps 3 Actual 6.18 Motor Data Motor Manufacturer WEG Motor HP 3 Motor RPM 1765 Motor Rated Volts 208-230/460 Motor Phase 3 Motor FL Amps 8.54-7.72/3.86 Motor Service Factor 1.15 Motor Frame 182/4T Motor Type ODP Nominal Efficiency 89.5 % Power Factor 80.0 Sheave Data Motor Sheave Model VP56 Motor Sheave Bore 1 1/8 in. Fan Sheave Model AK70 Fan Sheave Bore 1 in. Number of Belts 1 Belt Size AX40 in. Test Pressures Fan SP In Actual ATMOSPHERE in. wc Fan SP Out Actual ATMOSPHERE in. wc JEDI Balancing, Inc. Page 1 of 3 09/12/17 Fan Unit PROJECT: LOCATION: CASCADE CLUB PARKING VAIL, CO 2017-8406 PROJECT #: DATE: CONTACT: 7/19/2017 Josh Cota Tested By: Bryan Hund Date: 7/10/2017 SYSTEM/UNIT: EF-02 Log: EF-02 7/10/2017 Bryan Hund WITH BIRD-SCREEN AND SAFETY GRILL. FREE AREA CALCULATED AT 35X35 OR 8.5 SQFT. 941 FPM REQUIRED. ACTUAL 982 FPM OR 8350 CFM Unit Data Fan Manufacturer COOK Fan Model Number 36EP6 Fan Serial Number 185SG65454-01/0000702 Rated CFM 8000 Total SP Design 0.75 in. wc Total Connected CFM 8000 Starter Data Starter Manufacturer BUILT IN Test Data Total CFM Actual 8350 Fan RPM Actual 1182 Motor Volts 1 Actual 211 Motor Volts 2 Actual 210 Motor Volts 3 Actual 211 Motor Amps 1 Actual 6.33 Motor Amps 2 Actual 6.2 Motor Amps 3 Actual 6.41 Motor Data Motor Manufacturer WEG Motor HP 3 Motor RPM 1765 Motor Rated Volts 208-230/460 Motor Phase 3 Motor FL Amps 8.54-7.72/3.86 Motor Service Factor 1.15 Motor Frame 182/4T Motor Type ODP Nominal Efficiency 89.5 % Power Factor 80.0 Sheave Data Motor Sheave Model VP56 Motor Sheave Bore 1 1/8 in. Fan Sheave Model AK70 Fan Sheave Bore 1 in. Number of Belts 1 Belt Size AX40 in. Test Pressures Fan SP In Actual ATMOSPHERE in. wc Fan SP Out Actual ATMOSPHERE in. wc JEDI Balancing, Inc. Page 2 of 3 09/12/17 Fan Unit PROJECT: LOCATION: CASCADE CLUB PARKING VAIL, CO 2017-8406 PROJECT #: DATE: CONTACT: 7/19/2017 Josh Cota Tested By: Bryan Hund Date: 7/10/2017 SYSTEM/UNIT: EF-03 Log: EF-03 7/10/2017 Bryan Hund DESIGN FLOW ACHIEVED AT 1653 RPM OR 92% ON DIGITAL SPEED CONTROL. SPEED CONTROL SET. EF-03 7/10/2017 Bryan Hund 13.5X13.5= 1.26 SQFT. 952 DESIGN FPM. ACTUAL 984 FPM OR 1240 CFM. Unit Data Fan Manufacturer COOK Fan Model Number 120 SQN Fan Serial Number 185SG65454-00/0000701 Rated CFM 1200 Total SP Design 0.5 in. wc Total Connected CFM 1200 Starter Data Starter Manufacturer NONE Test Data Total CFM Actual 1240 Fan RPM Actual DIRECT DRIVE Motor Volts 1 Actual 123 Motor Amps 1 Actual 2.7 Motor Data Motor HP 1/2 Motor RPM 1725 Motor Rated Volts 115 Motor Phase 1 Motor FL Amps 3.0 Motor Service Factor 1.0 Sheave Data Motor Sheave Model DIRECT DRIVE Test Pressures Fan SP In Actual ATMOSPHERE in. wc Fan SP Out Actual 0.20 in. wc JEDI Balancing, Inc. Page 3 of 3 09/12/17 GENERAL 1. IT IS THE INTENTION OF THE SPECIFICATIONS AND DRAWINGS TO PROVIDE FOR COMPLETE AND FULLY OPERATIONAL SYSTEMS TO MEET THE OWNER'S REQUIREMENTS AS DESCRIBED HEREIN AND IN ACCORDANCE WITH ALL APPLICABLE CODES AND AUTHORITIES HAVING JURISDICTION. 2. THESE DRAWINGS AND SPECIFICATIONS ARE NOT A DETAILED SET OF INSTALLATION INSTRUCTIONS BUT RATHER A GUIDELINE TO ESTABLISH QUALITY OF EQUIPMENT AND MATERIALS, LEVEL OF WORKMANSHIP AND PERFORMANCE. DO NOT SCALE DRAWINGS. VERIFY DIMENSIONS WITH SHOP DRAWINGS COORDINATION EFFORT AND IN FIELD PRIOR TO COMMENCEMENT OF WORK. REFER TO ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS. 3. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING AND REVIEWING THE ARCHITECTURAL, STRUCTURAL, CIVIL AND ELECTRICAL DOCUMENTS FOR ANY WORK THAT AFFECTS OR OTHERWISE IMPACTS THE MECHANICAL SCOPE OF WORK. ALL DRAWINGS AND SPECIFICATIONS ARE TO BE READ IN COORDINATION WITH ONE ANOTHER SUCH THAT WORK SHOWN ON ONE SET IS BINDING TO THE OTHER. 4. ALL WORK, MATERIALS AND TRADES SHALL COMPLY WITH THE 2015 INTERNATIONAL BUILDING CODE (IBC) FAMILY, THE 2014 NATIONAL ELECTRIC CODE, ALL LOCAL ORDINANCES AND AMENDMENTS, MOST CURRENT NFPA STANDARDS, AND MANUFACTURER'S INSTALLATION INSTRUCTIONS. THE IBC FAMILY INCLUDES THE BUILDING, MECHANICAL, PLUMBING, FUEL GAS, ENERGY CONSERVATION, AND FIRE CODES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PERFORM WORK IN CONFORMANCE WITH ALL APPLICABLE CODES, ORDINANCES, AND LIFE SAFETY MEASURES AS REQUIRED, BY LOCAL, STATE AND NATIONAL AUTHORITIES. CONTRACTOR SHALL VERIFY WITH ARCHITECT IF MODIFICATION OF WORK IS REQUIRED FOR COMPLIANCE. 5. PRIOR TO SUBMITTING A BID, EACH BIDDER SHALL CAREFULLY EXAMINE THE BIDDING DOCUMENTS. BRING TO THE ATTENTION OF THE ARCHITECT IN WRITING, ANY DISCREPANCIES, AMBIGUITIES, INCONSISTENCIES, OR ERRORS THEREIN THAT ARE DISCOVERED DURING EXAMINATION OF DRAWINGS AND EXISTING EQUIPMENT. FURTHER, ALL BIDDERS SHALL EXAMINE THE SITE, CONDITION AND ALL ASSOCIATED SCOPES OF WORK THAT FALL UNDER THIS CONTRACT AND DETERMINE ALL COSTS FOR THE WORK ARE FULLY COVERED IN THEIR BID SUBMISSION. FAILURE TO REQUEST CLARIFICATION DURING THE BID PERIOD FOR ANY INADEQUACY, OMISSION, OR CONFLICT SHALL NOT RELIEVE CONTRACTOR OF RESPONSIBILITIES. SIGNING OF THE CONTRACT SHALL BE CONSIDERED TO IMPLICITLY DENOTE THAT THE CONTRACTOR HAS A THOROUGH UNDERSTANDING OF THE FULL INTENT AND SCOPE OF THESE CONSTRUCTION CONTRACT DRAWINGS AND SPECIFICATIONS. 6. DURING CONSTRUCTION THE CONTRACTOR SHALL ENSURE THAT ALL MATERIAL AND EQUIPMENT IS NEW (WITH THE EXCEPTION OF USED EQUIPMENT FURNISHED BY OWNER) AND MEETS OR EXCEEDS THE QUALITY AS SET OUT IN THE SPECIFIED EQUIPMENT AND APPLICABLE CODES. THE INSTALLATION OF ALL EQUIPMENT AND MATERIALS SHALL BE OF THE HIGHEST WORKMANSHIP AND QUALITY. ATTENTION TO DETAIL, SAFETY, NEATNESS, ACCESS FOR MAINTENANCE, DURABILITY, ETC. IS EXPECTED AND REQUIRED. 7. ALL EQUIPMENT SHALL BE SET STRAIGHT AND SQUARE WITH THE STRUCTURE. PIPING AND DUCTWORK SHALL BE INSTALLED PARALLEL OR AT RIGHT ANGLES TO ALL WALLS AND STRUCTURAL MEMBERS. HANGER RODS, EQUIPMENT BASES, SUPPORTS AND ISOLATION SHALL BE SET PLUMB AND SQUARE AND IN VERTICAL ALIGNMENT WHERE APPLICABLE. ALL WORK SHALL BE NEAT AND CLEAN UPON COMPLETION. ALL WORK SHALL BE PERFORMED IN A WORKMANLIKE MANNER TO THE SATISFACTION OF THE ARCHITECT, OWNER, AND ENGINEER. 8. THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE BUILDING, STRUCTURE AND THE WORKS OF THE OTHER TRADES INVOLVED. THIS CONTRACTOR SHALL WORK AND COOPERATE WITH THE OTHER TRADES TO ENSURE A QUALITY INSTALLATION, AND MINIMIZE CONFLICTS. 9. THE CONTRACTOR SHALL MAKE NECESSARY REVISIONS, RE-ROUTINGS, ALTERATIONS, CHANGES AND ADDITIONS TO ANY AND ALL WORK AS REQUIRED TO ACCOMMODATE OTHER TRADES SCOPE OF WORKS INCLUDING ARCHITECTURAL, STRUCTURAL AND ELECTRICAL WITHOUT COST TO THE OWNER. 10. UPON COMPLETION OF THE WORK THE CONTRACTOR SHALL FURNISH TO THE OWNER A WRITTEN GUARANTEE STATING THAT THE CONTRACT WARRANTS ALL NEW MATERIAL AND EQUIPMENT AND ALL ASSOCIATED WORK AND COMPONENTS SHALL BE FREE FROM DEFECTS AND/OR FAILURE FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF OWNER ACCEPTANCE AND COMPLETION. ANY AND ALL MATERIALS, EQUIPMENT, WORKMANSHIP AND LABOR FOUND TO BE DEFECTIVE OR THAT FAILS IN ANY WAY IS TO BE REPLACED OR CORRECTED AT NO ADDITIONAL COST TO THE OWNER. CONTRACTOR SHALL WARRANT EXISTING EQUIPMENT FROM TIME OF DELIVERY ON SITE, THROUGH RIGGING AND INSTALLATION, AND ENDING UPON SUCCESSFUL STARTUP AND FUNCTIONAL PERFORMANCE TESTING OF THAT EXISTING EQUIPMENT. OWNER SHALL TAKE OVER WARRANTY OF EXISTING EQUIPMENT UPON CONTRACTOR'S PROOF OF SYSTEM' FUNCTIONAL PERFORMANCE. 11. THE TERM "SUPPLY”, "PROVIDE", "INSTALL", OR “FURNISH” SHALL MEAN TO SUPPLY AND INSTALL ALL NECESSARY LABOR, MATERIALS, TOOLS AND EQUIPMENT AS MAY BE NECESSARY TO INSTALL SAME FOR THE COMPLETE AND FUNCTIONAL OPERATION OF THE MECHANICAL SYSTEMS FOR THIS PROJECT. 12. FURNISH ALL NECESSARY SLEEVES, FLASHINGS, COUNTER-FLASHINGS, INSERTS, ANCHOR BOLTS, EQUIPMENT SUPPORTS, ETC. IN A TIMELY FASHION WHERE REQUIRED TO COMPLETE THE WORK. THIS SHALL INCLUDE ANY AND ALL CAULKING, PATCHING, CUTTING, ETC. AS REQUIRED THROUGH ROOF AND WALL SYSTEMS. 13. DO NOT CUT, CORE, ATTACH TO, OR MODIFY ANY STRUCTURAL OR BUILDING ELEMENTS WITHOUT RECEIVING PRIOR APPROVAL FROM THE ENGINEER OR ARCHITECT INVOLVED. 14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE TRANSPORTATION AND PROTECTION OF ALL EQUIPMENT AND MATERIAL PROVIDED FOR THIS PROJECT UNTIL THE OWNER HAS ACCEPTED THE BUILDING. THIS SHALL INCLUDE STORAGE OF SAME ON SITE AND REMOVAL OF ALL MATERIALS AND REFUSE AS A RESULT. 15. PROVIDE ALL NECESSARY SCAFFOLDING, LADDERS, HOISTS, RIGGING, ETC. AS REQUIRED FOR THE INSTALLATION OF THE WORK WITHIN THIS SCOPE. ALL HOISTING, SUPPORTS, DELIVERY, ETC OF EQUIPMENT AND MATERIAL FOR THIS PROJECT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR. 16. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF THE BUILDING, WORK OF OTHERS, ETC. DURING THE COURSE OF CARRYING OUT THE WORK AS INVOLVED IN THIS CONTRACT. THE CONTRACTOR SHALL MAKE GOOD AND/OR PAY FOR ANY DAMAGES SUSTAINED. THE OWNER RESERVES THE RIGHT TO BACK CHARGE THE CONTRACTOR FOR THE REPAIR AND/OR REPLACEMENT OF ANY DAMAGES. 17. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND PAY FOR ALL NECESSARY FEES OR OTHER COSTS ASSOCIATED WITH CARRYING OUT THE WORK HEREIN. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ANY AND ALL CERTIFICATES AS REQUIRED TO ENSURE THAT THE INSTALLATION IS IN CONFORMANCE WITH, AND HAS BEEN APPROVED BY ALL AUTHORITIES HAVING JURISDICTION. ANY REVISIONS AND/OR CHANGES REQUIRED BY THE AUTHORIZED INSPECTOR SHALL BE DONE WITHOUT CHARGE TO THE OWNER AND SHALL BE DONE SO AS NOT TO AFFECT SCHEDULE OR THE WORK OF OTHERS. ALL PERMITS SHALL BE POSTED IN A CONSPICUOUS PLACE ON SITE. UPON COMPLETION THIS CONTRACTOR SHALL PROVIDE THE OWNER WITH A CERTIFICATE OF FINAL APPROVAL FROM ALL AUTHORITIES INVOLVED IN THE SCOPE OF HIS WORK. 18. IN CARRYING OUT THE WORK, THE CONTRACTOR SHALL UTILIZE TRADESPEOPLE THAT ARE FULLY QUALIFIED, LICENSED, EXPERIENCED AND KNOWLEDGEABLE IN THEIR RESPECTIVE AREAS OF THE CONSTRUCTION INDUSTRY AND SHALL PERFORM WORK IN A RESPONSIBLE MANNER WITH ESTABLISHED CONSTRUCTION PRACTICE. 19. PRIOR TO COMMENCEMENT OF THE WORK, CONTRACTOR SHALL CONCLUSIVELY COORDINATE THE DETAILED INSTALLATION OF THE AND EQUIPMENT WITH ALL CONDUIT, CABLE TRAYS, STRUCTURAL, STRUCTURAL ELEMENTS, AND OTHER WORK OF OTHER TRADES. NO ADDITIONAL COSTS WILL BE CONSIDERED FOR CHANGES AS A RESULT OF INTERFERENCE WITH THE WORK OF OTHERS. THIS INCLUDES ANY ADDITIONAL MATERIAL REQUIRED TO CORRECT MINOR JOB CONFLICTS FOR NORMALLY ACCEPTED PROCEDURES OF ANY AND ALL TRADES. 20. CLEAN ALL EQUIPMENT, MATERIALS, WALLS, CEILINGS, FLOORS, PIPING, DUCTS, ETC. OF A DIRT, OIL, DUST AND PACKAGING MATERIAL AFFECTED DURING THE COURSE OF THIS WORK. DISCONNECT, CLEAN AND RECONNECT WHERE NECESSARY, FOR THE PURPOSE OF LOCATING AND REMOVING OBSTRUCTIONS. 21.REMOVE ALL TOOLS, WASTE MATERIAL, TRASH, AND PACKAGING MATERIALS GENERATED BY THIS WORK FROM THE SITE. UPON COMPLETION ENSURE ALL SURFACES ARE CLEANED OF GREASE, DIRT, ETC. ONCE COMPLETED, THE FACILITY SHALL BE AVAILABLE FOR IMMEDIATE USE. 22. ALL EQUIPMENT AND MATERIAL SPECIFIED AND NOTED ON THE DRAWINGS IS SET AS A MINIMUM STANDARD FOR THE CONTRACTOR TO WORK TO. ALL SUBMITTED TENDERS SHALL BE BASED ON MATERIAL AND EQUIPMENT AS SPECIFIED. EQUIPMENT AND MATERIAL SUPPLIERS OTHER THAN THOSE SPECIFIED ARE TO MAKE A WRITTEN SUBMISSION FOR CONSIDERATION AS AN EQUAL OR ALTERNATE ALONG WITH ANY COST SAVINGS THAT MAY BE REALIZED AS A RESULT OF USING HIS EQUIPMENT. SUBMISSION FOR CONSIDERATION AS AN EQUIVALENT SHALL BE MADE, ALONG WITH TECHNICAL INFORMATION, A MINIMUM OF 5 BUSINESS DAYS BEFORE BID DATE. 23. SHOULD ENGINEER ALLOW CONTRACTOR TO USE EQUIVALENT EQUIPMENT AND MATERIALS FROM AN APPROVED MANUFACTURER OTHER THAN THAT SPECIFICALLY SPECIFIED, IN ACCORDANCE WITH PROCEDURES ABOVE, THE USE OF SAME DOES NOT RELIEVE THE CONTRACTOR FROM CONFIRMING TO OTHER TRADES AFFECTED ALL RELEVANT INFORMATION SUCH AS DIMENSIONS, ELECTRICAL, WEIGHT, ETC. ANY NECESSARY REVISIONS AS A RESULT SHALL BE PAID FOR BY THIS CONTRACTOR. IF THE PROPOSED EQUIPMENT OR NECESSARY MODIFICATIONS ARE NOT TO THE SATISFACTION OF THE ENGINEER THAT THE END RESULT WILL BE THE SAME THE CONTRACTOR SHALL PROVIDE THE SPECIFIED EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER. 24. CONSTRUCTION PHASE SUBMITTALS - CONTRACTOR SHALL SUBMIT ELECTRONIC COPIES OF ALL SHOP DRAWINGS AND PRODUCT DATA FOR EQUIPMENT PROPOSED AND INSTALLATION DETAILS, REROUTINGS, ETC PER THE COORDINATION EFFORT FOR THIS PROJECT TO THE ENGINEER FOR REVIEW PRIOR TO ORDERING MATERIALS OR EQUIPMENT. PRODUCT DATA SHALL STATE CAPACITIES, SIZES, ETC. OF ALL EQUIPMENT AND SHALL BE CERTIFIED. INCLUDE COMPUTER BASED SELECTIONS OF PROJECT SPECIFIC CONDITIONS WHERE APPLICABLE. CLEARLY MARK EACH SHOP DRAWING, CATALOG CUT AND/OR SPECIFICATION SHEET TO INDICATE THOSE PRODUCTS AND FEATURES WHICH ARE INTENDED TO BE FURNISHED. ENGINEER RESERVES THE RIGHT TO REJECT SUBMITTALS THAT ARE INADEQUATELY OR UNCLEARLY MARKED. SPECIFICALLY INDICATE ANY DEVIATIONS FROM THE DESIGN INTENT. ENGINEER RESERVES THE RIGHT TO REQUIRE CORRECTION AT NO EXTRA COST FOR DEVIATIONS NOT SPECIFICALLY INDICATED IN THE SUBMITTAL. REVIEW AND APPROVAL OF SUBMITTALS SHALL NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY TO FURNISH EQUIPMENT AND MATERIALS OF PROPER DIMENSION, SIZE, QUANTITY, QUALITY AND ALL PERFORMANCE CHARACTERISTICS TO EFFICIENTLY PERFORM THE REQUIREMENTS AND INTENT OF THE CONTRACT DOCUMENTS. 25. CLOSEOUT SUBMITTALS - OPERATION AND MAINTENANCE MANUALS: UPON RECEIPT OF REVIEWED SUBMITTALS, CONTRACTOR SHALL IMMEDIATELY COMMENCE COMPILING OPERATIONS AND MAINTENANCE DATA MANUALS (O&M'S). SUBMIT O&M'S FOR REVIEW NO LESS THAN THIRTY (30) CALENDAR DAYS PRIOR TO SUBMITTING NOTICE OF SUBSTANTIAL COMPLETION. O&M'S SHALL CONTAIN AT A MINIMUM: TABLE OF CONTENTS TABBED DIVIDERS INDEX CONSTRUCTION PHASE SUBMITTALS W/ ENGINEER'S REVIEW SYSTEMS DESCRIPTIONS MAINTENANCE TASKS LUBRICATION INFORMATION LIST OF CONTRACTORS EQUIPMENT SUPPLIERS' PARTS LISTS, TROUBLESHOOTING GUIDES, AND MAINTENANCE DATA TESTING/INSPECTION, CERTIFICATES, BALANCING REPORTS IDENTIFICATION DIRECTORY UPON COMPLETION OF REVIEW, SUBMIT TWO (2) COPIES NEATLY BOUND IN 3-RING BINDERS, TABBED, AND LABELED AND (1) ELECTRONIC COPY WITH SIMILAR TABBING AND ORGANIZATION FOR EASE OF NAVIGATION, SIMILAR TO THE HARD COPIES 26. CLOSEOUT SUBMITTALS - AS-BUILTS AND RECORD DRAWINGS: UPON COMPLETION, CONTRACTOR SHALL SUBMIT FOR REVIEW MARKED UP RECORD DRAWINGS INDICATING ALL DIMENSIONS, INVERTS, DISTANCES FROM STRUCTURE, AND ALL DEVIATIONS OF THE AS-BUILT INSTALLATION FROM THE GRAPHICAL REPRESENTATIONS ON THE CONTRACT DOCUMENTS. UPON COMPLETION OF REVIEW, SUBMIT TWO (2) FULL SIZE COPIES, BOUND AND ONE (1) ELECTRONIC COPY. 27.USE OF THE PERMANENT HEATING SYSTEM PRIOR TO COMPLETION OF CONSTRUCTION SHALL NOT BE PERMITTED WITHOUT WRITTEN PERMISSION FROM THE OWNER/ENGINEER. TEMPORARY HEAT SHALL BE PROVIDED BY THE GENERAL CONTRACTOR. ANY EQUIPMENT THAT IS PERMITTED TO BE USED SHALL BE PROFESSIONALLY CLEANED BY SPECIALIST, LUBRICATED AND NEW FILTERS INSTALLED PRIOR TO TURNOVER TO OWNER AT COMPLETION. 28.ELECTRICAL COORDINATION - ALL MOTORS SUPPLIED WITH MECHANICAL EQUIPMENT SHALL BE 1800 RPM MAXIMUM UNLESS OTHERWISE SPECIFIED. VERIFY AVAILABLE VOLTAGE AND PHASE ON SITE AND ACCORDING TO ELECTRICAL DRAWINGS. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR CONFIRMING ANY AND ALL ELECTRICAL INFORMATION AND EQUIPMENT/SYSTEMS COMPATIBILITY PRIOR TO ORDERING ANY EQUIPMENT. THIS CONTRACTOR SHALL BE RESPONSIBLE TO FURNISH ALL NECESSARY STARTERS FOR MECHANICAL EQUIPMENT UNLESS NOTED OTHERWISE. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE TO SET IN PLACE AND WIRE STARTERS PROVIDED BY THIS CONTRACTOR. 29. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE RECEIVING AND INSTALLATION OF ALL OWNER SUPPLIED EQUIPMENT UNLESS NOTED OTHERWISE. THIS SCOPE REQUIRES COORDINATION WITH THE OWNER SUPPLIED EQUIPMENT, AND NOT ALL DETAILS OF THAT EQUIPMENT ARE NECESSARILY INCLUDED IN THESE DRAWINGS. REFER TO ORIGINAL INSTALLATION DRAWINGS, MANUFACTURER'S DRAWINGS, ORIGINAL EQUIPMENT SUBMITTAL DATA SHEETS, AND EQUIPMENT MANUFACTURER'S RESELECTIONS AND REFURBISHMENT GUIDELINES FOR NEW PROJECT ALTITUDE, AND MEET THE REQUIREMENTS DEFINED THEREIN. DUCTWORK, EQUIPMENT AND ACCESSORIES 1. UNLESS NOTED OTHERWISE, DUCTWORK SHALL BE CONSTRUCTED AND SEALED IN CONFORMANCE WITH SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS, LATEST EDITION AND ASHRAE STANDARDS. DUCT CONSTRUCTION PRESSURE CLASS SHALL BE AS FOLLOWS: MEDIUM PRESSURE SUPPLY DUCT, BETWEEN AIR HANDLING UNIT AND SUPPLY TERMINAL BOX INLET: 4 INCH POSITIVE/NEGATIVE. LOW PRESSURE SUPPLY DUCT, DOWNSTREAM OF SUPPLY TERMINAL BOX OUTLET: 2 INCH POSITIVE/NEGATIVE. LOW PRESSURE RETURN AND EXHAUST DUCT: 2 INCH POSITIVE/NEGATIVE. TESTING, STARTUP, ADJUSTING AND BALANCING 1. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TESTING OF ALL EQUIPMENT BOTH NEW AND USED EQUIPMENT FURNISHED BY OWNER, PIPING AND MATERIALS AS NOTED HEREIN AND AS REQUIRED BY LOCAL INSPECTORS AND AUTHORITIES IN ORDER TO ENSURE AND PROVE THAT ALL SYSTEMS AND COMPONENTS ARE INSTALLED AND FUNCTIONING PROPERLY. THE CONTRACTOR SHALL ALLOW IN BID ALL NECESSARY COSTS INCLUDING ADDITIONAL LABOR AND MATERIAL TO DO SO. 2. NOTIFY THE OWNER/ENGINEER PRIOR TO STARTING ANY TESTING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES THAT OCCUR AS A RESULT OF TESTING, AND SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH LIABILITY AND REPAIRS AS NECESSARY. 3. ALL DEFECTS, ETC. SHALL BE REPAIRED OR REPLACED IMMEDIATELY UPON DISCOVERY. LEAKING JOINTS SHALL BE RE-DONE AND COMPLETED IN A TIMELY MANNER. 4. PERFORMANCE TESTS SHALL BE CARRIED OUT UPON COMPLETION OF PRESSURE TESTS AND INSTALLATION. THE CONTRACTOR SHALL MAKE ALL NECESSARY CHANGES AND MODIFICATIONS AS REQUIRED TO DELIVER AN OPERATIONAL SYSTEM. 5. ALL AIR SYSTEMS SHALL BE BALANCED TO WITHIN +/-5% OF VALUES SPECIFIED. AIR BALANCING SHALL BE CARRIED OUT BY AN INDEPENDENT AGENCY SPECIALIZING IN THIS FORM OF WORK AND IN ACCORDANCE WITH GUIDELINES ESTABLISHED BY THE AABC. 6. TO OBTAIN SPECIFIED AIR VOLUMES THIS CONTRACTOR SHALL MAKE ALL NECESSARY BELT AND SHEAVE CHANGES, ADD DAMPERS, VALVES, ETC. AS MAY BE REQUIRED AT NO ADDITIONAL COST TO THE CONTRACT. 7. PREPARE AND SUBMIT ELECTRONIC COPY OF COMPLETED REPORTS FOR ALL AIR HANDLING SYSTEMS AS PER THE NATIONAL GUIDELINES FOR SAME. CONTROLS 1. ALL AUTOMATIC CONTROLS FOR MECHANICAL EQUIPMENT SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR. WHERE AUTOMATIC CONTROLS REQUIRE WIRING OF ANY SYSTEMS OPERATING AT VOLTAGE IN EXCESS OF 30V, MECHANICAL CONTRACTOR SHALL RETAIN A LICENSED AND QUALIFIED ELECTRICAL CONTRACTOR TO PERFORM THE WORK. THE ELECTRICAL SUBCONTRACTOR TO THE MECHANICAL SHALL INSTALL ALL ELECTRICAL LINE VOLTAGE WIRING AND RACEWAY REQUIRED BY THE AUTOMATIC CONTROL SYSTEM. INSTALLATION OF THE ELECTRICAL SUBCONTRACTOR SHALL BE DONE UNDER THE SUPERVISION OF THE MECHANICAL CONTRACTOR. 2. CONTROL WIRING, CONDUIT AND ELECTRICAL DEVICES SHALL COMPLY WITH THE REQUIREMENTS OF THE NEC. ALL CONTROL WIRING SHALL BE COLOR CODED AND TAGGED FOR EASY IDENTIFICATION. ALL LOW-VOLTAGE CONTROL WIRING NOT SUBJECT TO THE NEC SHALL BE INSTALLED IN RACEWAY. 3. IT IS THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO ENSURE THAT ALL CONTROL DEVICES AND CONTROLLED EQUIPMENT ARE INSTALLED CORRECTLY AND FUNCTION PROPERLY, AND THAT ALL MECHANICAL EQUIPMENT OPERATES AS DESIGN AND SPECIFIED, IN CONJUNCTION WITH THE CONTROLS. 4. SUBMIT SHOP DRAWINGS OF WIRING DIAGRAMS AND CONTROL DEVICES FOR ENGINEER'S REVIEW. MAINTAIN AS-BUILT RECORD COPY OF WIRING DIAGRAMS DURING CONSTRUCTION AND INCORPORATE ALL FIELD CHANGES INTO A COMPREHENSIVE CONTROLS WIRING DIAGRAM FOR INCLUSION WITH THE O&M'S AT PROJECT CLOSEOUT. MECHANICAL SYSTEMS SPECIFICATIONS MEP SHEET INDEX ISSUE LOG LEGEND ISSUE LOG DISCONTINUED  INCLUDED IN SET ISSUANCE  NOT INCLUDED IN SET ISSUANCE ISSUED WITHOUT CHANGES O SHEET NUMBER SHEET TITLE MEP-1 MEP COVER SHEET  MEP-2 PARKING LEVEL - NEW WORK  MEP-3 ELECTRICAL SCHEDULES AND SCHEMATICS  MEP-4 MECHANICAL DETAILS AND CONTROLS         1. a. FAN INSTALLATION - TWO (2) NEW EXHAUST FANS SHALL BE INSTALLED AND EQUIPPED WITH TWO SPEED MOTORS AND SUPPLIED WITH 2-SPEED MOTOR STARTERS. ADDITIONALLY, ONE (1) INLINE EXHAUST FAN SHALL BE INSTALLED TO RUN CONTINUOUSLY TO SATISFY THE MINIMUM EXHAUST REQUIREMENTS PER 2015 IMC. b. CONTROLS - 2015 IMC REQUIRES BOTH CARBON MONOXIDE (CO) AND NITROGEN DIOXIDE (NO2) SENSORS. COVERAGE STUDIES HAVE BEEN PERFORMED USING MACURCO DEVICES AS BASIS OF DESIGN. A TOTAL OF TEN (10) SENSORS OF EACH TYPE ARE REQUIRED BASED ON THIS EXERCISE. SUCCESSFUL CONTROLS VENDOR SHALL PROVIDE SHOP DRAWING SHOWING PROPOSED GAS DETECTOR COVERAGE IF DIFFERENT FROM BASIS OF DESIGN. 2. PROJECT CONSTITUTES INCREASED LOAD FOR MECHANICAL EQUIPMENT, GARAGE DOOR OPERATOR AND DRY SPRINKLER SYSTEM AIR COMPRESSOR. LIGHTING UPGRADE IS DEEMED TO REPRESENT A LOAD REDUCTION TO THE LIGHTING PANELS. THOUGH OVERALL SYSTEM ADDITIONAL LOAD AT THE EXISTING MAIN DISTRIBUTION CENTER IS DEEMED NEGLIGIBLE, ADDITIONAL LOAD ON PANEL 'HP2' IS NOT NEGLIGIBLE. THE EXISTING LOADS ON THE ELECTRICAL SYSTEM AT THIS POINT ARE NOT KNOWN AND CANNOT BE CONFIDENTLY VERIFIED WITH NEC CALCULATION. 30-DAY METERING IN ACCORDANCE WITH NEC SHALL BE REQUIRED. INSTALL LOAD RECORDING METER IMMEDIATELY UPON AWARD OF CONTRACT. DOWNLOAD DATA AFTER 7 DAYS OF RECORDING AND IMMEDIATELY SUBMIT TO ENGINEER TO REVIEW FOR INITIAL VERIFICATION OF SYSTEM SUITABILITY FOR CURRENTLY DEPICTED DESIGN. 3. THE EXISTING LIGHTING SYSTEM CONSISTS OF A TOTAL OF SEVENTY NINE (79) OPEN CAGED FLUORESCENT UPLIGHTS, THIRTY FIVE (35) OF WHICH ARE ROUGHLY 4FT LONG WHILE THE REMAINING FORTY FOUR (44) FIXTURES ARE APPROXIMATELY 8FT LONG. SCOPE INCLUDES REPLACEMENT OF ALL EXISTING FIXTURES WITH TWELVE (12) NEW LED HIGH BAY FIXTURES. ANY NEW CABLING REQUIRED SHALL BE IN EMT AND PAINTED TO COLOR AS SPECIFIED BY ARCHITECT. SEE LUMINAIRE SCHEDULE FOR ADDITIONAL INFORMATION. GENERAL SCOPE OVERVIEW NOTES: 1. FIRE SPRINKLER SCOPE - THE EXISTING COVERAGE SPACING IS BASED ON LIGHT HAZARD OCCUPANCY AND NOT SUITED FOR RE-USE WITHOUT SIGNIFICANT MODIFICATION TO ACHIEVE COVERAGE, SPACING AND DENSITY REQUIREMENTS OF CHANGE IN USE TO MOTOR VEHICLE PARKING. SCOPE INCLUDES COMPLETE REMOVAL OF EXISTING SYSTEMS AND REPLACEMENT WITH COMPLETELY NEW DRY SYSTEM WITH SPACING/DENSITY COVERAGE FOR ORDINARY HAZARD GROUP I CLASSIFICATION. DRY VALVE ASSEMBLY AND AIR COMPRESSOR SHALL BE LOCATED IN CONDITIONED SPACE. HEAT TRACING OF DRY VALVE ASSEMBLY SHALL NOT BE PERMITTED. SEE DELEGATED DESIGN NOTES FOR FURTHER INFORMATION. 2. FIRE PROTECTION SYSTEM PIPING SHALL BE HYDRAULICALLY CALCULATED, SIZED, AND BID USING SCHEDULE 40 CUT-GROOVED, THREADED, OR WELDED PIPE. REDUCED PIPE SIZES SUCH AS SCHEDULE 30 WITH ANTIMICROBIAL COATING FOR EQUIVALENT CORROSION RESISTANCE RATING SHALL NOT BE PERMITTED IN THE BASE BID. 3. PERFORM NEW SITE FIRE FLOW TEST IF EXISTING DATA AVAILABLE FROM THE AHJ OR THE WATER UTILITY PROVIDER IS OLDER THAN SIX (6) MONTHS. ASSUME THAT THE FLOW TEST DATA IS OLDER THAN SIX MONTHS. INCLUDE COST TO PARTICIPATE IN AND OBSERVE THE FLOW TEST PROCEDURE. FLOW TEST SHALL BE PERFORMED PRIOR TO THE DESIGN AND HYDRAULIC CALCULATIONS. TEST DATA ALONG WITH HYDRAULIC CALCULATIONS SHALL BE INCLUDED IN THE SUBMITTAL OF SPRINKLER SHOP DRAWINGS TO THE FIRE MARSHALL HAVING JURISDICTION. 4. PIPE SCHEDULE DESIGN METHODS ARE NOT PERMITTED. HYDRAULIC CALCULATIONS MUST BE PERFORMED TO ALL APPLICABLE NFPA SPECIFICATIONS AND SUBMITTED TO THE ARCHITECT/ ENGINEER FOR APPROVAL AS PART OF THE SHOP DRAWING PROCEDURE. 5. PROVIDE DRAWINGS AND CALCULATIONS WITH SEAL OF LICENSED FIRE PROTECTION ENGINEER OR NICET III LEVEL TECHNICIAN FOR SUBMITTAL TO FIRE MARSHALL AND TOWN OF VAIL PRIOR TO INSTALLATION. 6. DESIGN PARAMETERS: OCCUPANCY CLASSIFICATIONS - ORDINARY HAZARD, GROUP I. DENSITY: ORDINARY HAZARD - 0.15 GPM / SF COVERAGE: ORDINARY HAZARD - 130 SF / SPRINKLER (15' MAXIMUM ALLOWABLE SPACING; HOWEVER, BASIS OF DESIGN PIPING SHALL BE 10' X 12' MAXIMUM). FIRE PROTECTION DELEGATED DESIGN NOTES: 1. COORDINATE EXACT LOCATION AND ELECTRICAL CONNECTION REQUIREMENTS OF EACH PIECE OF MECHANICAL EQUIPMENT WITH MECHANICAL CONTRACTOR PRIOR TO ROUGH-IN. 2. SEAL PENETRATIONS OF FIRE RATED ASSEMBLIES WITH U/L APPROVED MATERIALS AND METHODS TO MAINTAIN FIRE RATING. 3. PROVIDE DEDICATED NEUTRAL CONDUCTORS FOR ALL BRANCH CIRCUITS. 4. ALL NEW BRANCH CIRCUITS SHALL BE ROUTED IN EMT. GENERAL POWER SCOPE NOTES: ELECTRICAL ABBREVIATIONS SUFFIX DESCRIPTION ADA AMERICANS WITH DISABILITIES ACT AF/AT AMP FRAME, AMP TRIP AFF ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE AIC EMPERES INTERRUPTING CAPACITY (SYMMETRICAL) AMP or A AMPERE AS/AF AMP SWITCH, AMP FUSE ATS AUTOMATIC TRANSFER SWITCH AVG AVERAGE AWG AMERICAN WIRE GAUGE C CONDUIT CB CIRCUIT BREAKER CIRC, CKT CIRCUIT CT CURRENT TRANSFORMER DISC DISCONNECT E EXISTING EF EXHAUST FAN EMT ELECTRICAL METALLIC TUBING ENT ELECTRICAL NON-METALLIC TUBING EPO EMERGENCY POWER OFF FA FIRE ALARM FLA FULL LOAD AMPS FSD FIRE SMOKE DAMPER FT or ' FEET GFCI GROUND FAULT CIRCUIT INTERRUPTER GFP GROUND FAULT PROTECTION GRD GROUND H,W,D,L HEIGHT, WIDTH, DEPTH, LENGTH HOA HAND-OFF-AUTO HP HORSEPOWER HVAC HEATING, VENTILATION AND AIR CONDITIONING IG ISOLATED GROUND IN or " INCHES JBOX JUNCTION BOX KVA KILOVOLT AMPERES KW KILOWATT KWH KILOWATT HOUR LF LINEAR FEET LTG or LTS LIGHTING M METER MAX MAXIMUM MCA MINIMUM CIRCUIT AMPACITY MCB MAIN CIRCUIT BREAKER MCC MOTOR CONTROL CENTER MCM THOUSAND CIRCULAR MILS MCP MOTOR CIRCUIT PROTECTOR MFR MANUFACTURER MIN MINIMUM MLO MAIN LUGS ONLY MOCP MAXIMUM OVERCURRENT PROTECTION MON MONITORING MTD MOUNTED NC/NO NORMALLY CLOSED/NORMALLY OPEN NEC NATIONAL ELECTRICAL CODE NEMA NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION NF NON-FUSED NIC NOT IN CONTRACT NL NIGHT LIGHT NO or # NUMBER NTS NOT TO SCALE OFCI OWNER FURNISHED, CONTRACTOR INSTALLED P POLE PC PHOTOCELL PH PHASE PROVIDE FURNISH, INSTALL AND CONNECT PT POTENTIAL TRANSFORMER PVC POLYVINYL CHLORIDE REC or RECEPT RECEPTACLE RGS RIGID GALVANIZED STEEL RMS ROOT MEAN SQUARE SPD SURGE PROTECTION DEVICE SPST SINGLE-POLE, SINGLE-THROW SQ SQUARE TC TIMECLOCK TEL/DATA TELEPHONE/DATA TV TELEVISION TYP TYPICAL UGPS UNDERGROUND PULL SECTION UON UNLESS OTHERWISE NOTED UPS UNITERRUPTABLE POWER SYSTEM V VOLTS VA VOLT AMPERES VAV VARIABLE AIR VOLUME VD VOLTAGE DROP W WIRE WP WEATHERPROOF XFMR TRANSFORMER %Z PERCENTAGE IMPEDANCE MECHANICAL ABBREVIATIONS SUFFIX DESCRIPTION AAV AIR ADMITTANCE VALVE ABV ABOVE ADA AMERICANS WITH DISABILITIES ACT AFF ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE AHU AIR HANDLING UNIT AUTO AUTOMATIC AVG AVERAGE BAS BUILDING AUTOMATION SYSTEM BDD BACKDRAFT DAMPER BFG BELOW FINISHED GRADE BTU BRITISH THERMAL UNITS BTUH BTU'S PER HOUR CA COMBUSTION AIR CFM CUBIC FEET PER MINUTE (AIR FLOW RATE) CLG CEILING CO CLEAN OUT COTG CLEAN OUT TO GRADE CU CONDENSING UNIT D or (D) DEMO DIA DIAMETER DHW DOMESTIC HOT WATER DN DOWN DW DOMESTIC WATER DWR DOMESTIC HOT WATER RECIRCULATION E or (E) EXISTING EA EXHAUST AIR EAT ENTERING AIR TEMPERATURE EC ELECTRICAL CONTRACTOR EF EXHAUST FAN ESP EXTERNAL STATIC PRESSURE EWT ENTERING WATER TEMPERATURE EXH EXHAUST FA FREE AREA FACP FIRE ALARM CONTROL PANEL FCT FOR CONTINUATION FD FIRE DAMPER FFI FOR FURTHER INFORMATION FLA FULL LOAD AMPS FSD COMBINATION FIRE/SMOKE DAMPER FT or ' FEET GPM GALLONS PER MINUTE (WATER FLOW RATE) H,W,D,L HEIGHT, WIDTH, DEPTH, LENGTH HOA HAND-OFF-AUTO HP HORSEPOWER HVAC HEATING, VENTILATION AND AIR CONDITIONING ILO IN LIEU OF IN or " INCHES IN WC INCHES OF WATER COLUMN LF LINEAR FEET LTG or LTS LIGHTING LWT LEAVING WATER TEMPERATURE M METER MAX MAXIMUM MC MECHANICAL CONTRACTOR MCA MINIMUM CIRCUIT AMPACITY MBH BTUH X 1000 MFR or MFG MANUFACTURER MIN MINIMUM MOD MOTOR OPERATED DAMPER MOCP MAXIMUM OVERCURRENT PROTECTION MTD MOUNTED MVD MANUAL VOLUME DAMPER N OR (N) NEW NC/NO NORMALLY CLOSED/NORMALLY OPEN NEC NATIONAL ELECTRICAL CODE NEMA NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION NIC NOT IN CONTRACT NO or # NUMBER NTS NOT TO SCALE OA, ODA, OSA OUTDOOR AIR OBD OPPOSED BLADE DAMPER OC ON CENTER OFCI OWNER FURNISHED, CONTRACTOR INSTALLED PROVIDE FURNISH AND INSTALL RA RETURN AIR REQ'D REQUIRED REQ'MT REQUIREMENT RE: REFER TO: RTU ROOF TOP UNIT SA SUPPLY AIR SD SMOKE DAMPER SF SQUARE FEET SFFA SQUARE FEET FREE AREA TON 12,000 BTUH COOLING CAPACITY TSP TOTAL STATIC PRESSURE TYP TYPICAL UON OR UNO UNLESS OTHERWISE NOTED V VOLTS VAV VARIABLE AIR VOLUME VTR VENT THRU ROOF WCO WALL CLEAN OUT WH WATER HEATER WP WEATHERPROOF W/ WITH XFR TRANSFER EXHAUST FANS TAG EF-1 EF-2 EF-3 DESCRIPTION GARAGE EXHAUST FAN SEE EF-1 GARAGE EXHAUST FAN FUNCTION GARAGE VENTILATION SEE EF-1 MINIMUM CONTINUOUS GARAGE VENTILATION LOCATION WALL, NW CORNER WALL, NE CORNER CEILING SUSPENDED, NW CORNER DRIVE BELT SEE EF-1 DIRECT AIR FLOW (CFM) 8000 SEE EF-1 1200 EFFECTIVE PLUME HT ESP @ S.L. (IN WC) 0.75 SEE EF-1 0.5 @ ALT (IN WC) 0.59 SEE EF-1 0.39 WHEEL TYPE AXIAL/ PROPELLER SEE EF-1 CENTRIFUGAL CLASS SPEED (RPM) 1110 SEE EF-1 1536 ELECTRIC NAMEPLATE HP 3 SEE EF-1 1/2 BRAKE HP 2.06 SEE EF-1 216 W VOLTAGE / PH 208/3 SEE EF-1 115/1 EM POWER SEE EF-1 STARTER SEE EF-1 MAX SONES (NC) 30 SEE EF-1 10.2 WEIGHT (LBS) 497 SEE EF-1 112 BASED ON: COOK MODEL # COOK 36EP614B SEE EF-1 COOK 120SQN17DEC REMARKS: A, B SEE EF-1 A, B ACCESSORIES: C SEE EF-1 D NOTES: E SEE EF-1 E GENERAL NOTES, FEATURES AND ACCESSORIES: A. BASIS OF DESIGN (BOD) MAKES & MODELS NOTED ABOVE DEFINE PHYSICAL SIZES, CHARACTERISTICS, MANUFACTURING DETAILS AND OTHER FEATURES NOT NECESSARILY SCHEDULED ABOVE BUT LIKELY COMTEMPLATED DURING THE DESIGN PROCESS. ALTERNATIVE MANUFACTURERS AVAILABLE TO BIDDERS: GREENHECK. BIDDERS SHALL BE RESPONSIBLE TO VERIFY EQUIVALENCY OF ALTERNATIVES TO THE BOD IF USING ALTERNATIVE IN THEIR BID. ENGINEER WILL NOT REVIEW ALTERNATIVES FOR EQUIVALENCY DURING THE BID PHASE. B. PROJECT IS AT ALTITUDE. GARAGE SPACE WILL BE UNCONDITIONED, FAN MOTOR SELECTIONS ARE AT 0F INLET TEMP. C. ACCESSORIES: PREMIUM EFFICIENCY 2-SPEED MOTOR, MOTORIZED SHUT-OFF DAMPER (115V), NEMA1 DISCONNECT, SHUTTER GUARD WITH INSECT SCREEN, SPARE BELT SET, BELT TENSIONER. D. ACCESSORIES: MOTOR MOUNTED SPEED CONTROL, NEMA1 DISCONNECT, MOTORIZED SHUT-OFF DAMPER (115V), INLET GUARD, FILTER BOX WITH ALUMINUM FILTER. E. RE: MEP-4 FOR FAN INSTALLATION DETAIL. (303) 900-8782 PO Box 3699, Evergreen, CO 80437 STBENGR.COM INFO@STBENGR.COM 1295 WESTHAVEN DRIVE VAIL, CO 81657 10/17/16 09/12/17 PARKING LEVEL - NEW WORK SCALE: 1/8" = 1'-0" 0 10' 20' GENERAL NOTES: 1. REPLACE EXISTING LAMPS WITH (N) LED LAMPS AS SHOWN. INCLUDE IN COST THE REMOVAL OF EXISTING LIGHTING FIXTURES AND LAMPS. DISPOSE OF EXISTING FLUORESCENT LIGHTING EQUIPMENT PER LOCAL REGULATIONS AS REQUIRED. 2. (E) WET TYPE FIRE SPRINKLER SYSTEM TO BE REPLACED WITH (N) DRY TYPE FIRE SPRINKLER SYSTEM, AS NECESSITATED BY THE PLANNED UNCONDITIONED PARKING GARAGE. FLAG NOTES: CO SENSOR, INSTALLED 5' AFF. NO2 SENSOR, INSTALLED 5' AFF. ADDRESSABLE DETECTION AND VENTILATION CONTROL PANEL, SEE CONTROLS DRAWINGS. INSTALL (N) EXHAUST FANS INCLUDING MOTOR OPERATED DAMPER. RE: EXHAUST FAN SCHEDULE INSTALL (N) EXHAUST FAN SUSPENDED FROM CEILING. FAN SHALL OPERATE CONTINUOUSLY TO PROVIDE MINIMUM VENTILATION REQUIREMENT. RE: EXHAUST FAN SCHEDULE. (D) ALL EXISTING LIGHTING FIXTURES AND INSTALL NEW TYPE S1 LIGHTING FIXTURES, TYP 12. REUSE EXISTING CIRCUITING AND CONTROLS TO FEED NEW FIXTURES. IN ADDITION TO EXISTING BUILDING LIGHTING CONTROLS, NEW FIXTURES SHALL HAVE INTEGRAL MOTION SENSOR TO ALLOW NEW SYSTEM TO DIM TO 10% WHEN GARAGE IS UNOCCUPIED. PROVIDE MAINTENANCE RECEPTACLES AS REQUIRED. (E) GAS FIRED RADIANT HEAT PANELS TO REMAIN. TYP 12. (N) L1 ELECTRICAL PANEL, FED FROM (E) MDC ELECTRICAL PANEL LOCATED IN MAIN ELECTRICAL ROOM APPROXIMATELY 120 FT. DISTANT. VISIT SITE PRIOR TO BID TO VERIFY DISTANCE. (N) L1A ELECTRICAL PANEL, FED FROM (N) L1 ELECTRICAL PANEL. (N) 75 KVA TRANSFORMER. NEW DISCONNECT. PROVIDE RACEWAY FROM (N) L1 TO JUNCTION BOX, TYP. 2, FOR GARAGE DOOR OPERATOR (SIZE/ VOLTAGE REMAINS TO BE DETERMINED). INCLUDE (1) 3/4" C & (1) 1" C IN BASE BID. RELOCATE HOSE BIB TO NEW LOCATION SHOWN. REPLACE PLASTIC TUBING WITH SOLDERED COPPER PIPE. CONNECT (N) WALL MOUNT FIXTURE TO UNSWITCHED HOT LEG SERVING EGRESS FIXTURES. FINAL HEIGHT TO BE DETERMINED. ANTICIPATE 30' MOUNTING HEIGHT FOR PRICING PURPOSES. TYP OF 2. (N) ODA INTAKE LOUVER, BASED ON RUSKIN ELF-6375DX. (N) EXH LOUVER, BASED ON RUSKING ELF-6375DX. PROVIDE GFCI WEATHERPROOF RECEPTACLE WITH LOCKABLE COVER. VERIFY EXACT LOCATION WITH GC. 1 2 3 NO2 CO NO2 CO NO2 CO NO2 CO NO2 CO NO2 CO NO2 CO NO2 CO NO2 CO NO2 CO EF 3 12 10 1 4 8 2 10 15 9 5 9 6 7 13 11 12 13 14 15 16 17 L L L L L H H H H H SUBSCRIPT DESIGNATES THRESHOLD SETTING FOR SENSOR PAIR (HIGH VS. LOW). SEE SEQUENCE OF OPERATION. W3 W3 J J 14 17 EF 1 6 16 16 ODA 65 SF M EF 2 18 EXH 4 SF 11 4 4 5 3 18 18 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 13 EXH 25 SF EXH 25 SF M M 7 WP WP WP 8 8 8 L1-15 18 19 19 19 19 19 GFI/ WP GFI/ WP GFI/ WP GFI/ WP (303) 900-8782 PO Box 3699, Evergreen, CO 80437 STBENGR.COM INFO@STBENGR.COM 1295 WESTHAVEN DRIVE VAIL, CO 81657 10/17/16 EF­01 EF­03 EF­02 09/12/17