HomeMy WebLinkAboutB16-0401_2017-8406 CASCADE CLUB PARKING FINAL REPORT 7-19-17_1505253960.pdf
NEBB Certification #3235 JEDI Balancing, Inc. Certification #BB009025C
568 Briggs Street (physical)
P.O. Box 525 (mail)
Erie, CO. 80516
Phone (720) 839-5333
www.jedibalancing.com
Testing, Adjusting & Balancing Certified Report
Project Cascade Club -Parking
Address 1295 Westhaven Drive Vail, CO 81657
Architect Unknown
Mechanical Engineer Unknown
Contractor Skyline Mechanical, Inc
TABB Certified Supervisors Don Pittser & Bryan Hund & Daniel Pegues
Date 7/19/2017
Job Number 2017-8406
09/12/17
Instrumentation:
Digital Manometer Alnor Balometer EBT-721
Flowhood Alnor Balometer EBT-721
Digital Pressure Gage Alnor Hydronic Manometer HM-680
Tachometer DT-36M
Digital Volt-Amp Meter Fluke 335
Thermometer Alnor Balometer EBT-721
Method of Balancing:
Supply, Return and Exhaust diffusers, grilles and registers were measured with an Alnor
Balometer EBT-721.
Heating and Chilled water flow rates were measured with an Alnor Hydronic Manometer
HM-680 connected to the installed flow meters.
Warranty Information:
This project was completed according to NEBB Procedural Standards.
The data presented in this report is a record of system measurements and final adjustments
that have been obtained in accordance with the current edition of the NEBB Procedural
Standards for testing, adjusting, and balancing environmental systems. Any variances from
design quantities, which exceed NEBB tolerances, are noted in the Test-Adjust-Balance
Report Project Summary. If a Test-Adjust-Balance Report Project Summary is not issued
directly following this cover page, all measurements met the design requirements as specified
by the design mechanical engineer.
This project has a one-year guarantee on all Testing, Adjusting & Balancing from the date
listed on this cover page.
Don Pittser
President
NEBB Certified Professional
TABB Certified Supervisor
09/12/17
Abbreviation Index
TAB: Testing, Adjusting & Balancing Cx: Commissioning
AHU: Air Handling Unit Motor FLA: Full Load Amperage
RTU: Roof Top Unit S.F.: Service Factor
PACU: Packaged Air Conditioning Unit OD: Outside Diameter
MAU: Make Up Air Unit P.F.: Power Factor
FCU: Fan Coil Unit Nom. Eff.: Nominal Efficiency
CRAC: Computer Room Air Conditioning Unit RPM: Revolutions per Minute
VAV: Variable Air Volume T1: Terminal 1
K Factor: Correction Factor T2: Terminal 2
FPB: Fan Powered Box T3: Terminal 3
AK: Area Correction PSI: Pounds per Square Inch
Design D.P.: Design Differential Pressure TDH: Total Dynamic Head
Actual D.P.: Recorded Differential Pressure CS: Circuit Setter
Ind.Imp.Dia. Indicated Impeller Diameter BV: Balance Valve
CUH: Cabinet Unit Heater Valve D.P.: Discharge Pressure
UH: Unit Heater Valve S.P.: Suction Pressure
ERV: Energy Recovery Ventilator ERU: Energy Recovery Unit
EF: Exhaust Fan PEF: Power Exhaust Fan
KEF: Kitchen Exhaust Fan SF: Supply Fan
RF: Return Fan TF: Transfer Fan
Diff.: Differential SEF: Smoke Exhaust Fan
SPF: Stairwell Pressurization Fan DX: Direct Expansion
SACU: Spilt Air Conditioner Unit SP: Static Pressure
TSP: Total Static Pressure in. wc: Inches Water Column
ESP: External Static Pressure HW: Heating Water
VP: Velocity Pressure CHW: Cooling Water
SA: Supply Air CW: Condenser Water
RA: Return Air HX: Heat Exchanger
OSA: Outside Air SWD: Sidewall Diffuser
OA: Outside Air EAT: Entering Air Temperature
MA: Mixed Air LAT: Leaving Air Temperature
SD: Supply Diffuser EWT: Entering Water Temperature
CD: Ceiling Diffuser LWT: Leaving Water Temperature
ER: Exhaust Register MVD: Manual Volume Damper
RG: Return Grille OBD: Opposed Blade Damper
CFM: Cubic Feet Per Minute NAC: No Access
FPM: Feet Per Minute NG: Not Given
SSD: Square Supply Diffuser NIC: Not in Contract
SRD: Square Return Diffuser E: Existing
TG: Transfer Grille cm: Centimeter
l/s: Liters per Second M: Meter
mm: Millimeter Pa: Pascal
kPa: Kilopascal CMH: Cubic Meters per Hour
09/12/17
GENERAL NOTES
SEE ALL FIELD NOTES LOCATED BELOW EQUIPMENT DATA
09/12/17
Table Of Contents
PROJECT:
LOCATION:
CASCADE CLUB PARKING
VAIL, CO
2017-8406
PROJECT #:
DATE:
CONTACT:
7/19/2017
Josh Cota
Table Of Contents
1 Fan Unit........................................................................................................................................................................ 1
1.1 EF-01...................................................................................................................................................................... 1
1.2 EF-02...................................................................................................................................................................... 2
1.3 EF-03...................................................................................................................................................................... 3
JEDI Balancing, Inc.
09/12/17
Fan Unit
PROJECT:
LOCATION:
CASCADE CLUB PARKING
VAIL, CO
2017-8406
PROJECT #:
DATE:
CONTACT:
7/19/2017
Josh Cota
Tested By: Bryan Hund
Date: 7/10/2017
SYSTEM/UNIT: EF-01
Log: EF-01 7/10/2017 Bryan Hund WITH BIRD-SCREEN AND SAFETY GRILL. FREE
AREA CALCULATED AT 35X35 OR 8.5 SQFT. 941
FPM REQUIRED. ACTUAL 977 OR 8305 CFM
Unit Data
Fan Manufacturer COOK
Fan Model Number 36EP6
Fan Serial Number 185SG65454-01/0000701
Rated CFM 8000
Total SP Design 0.75 in. wc
Total Connected CFM 8000
Starter Data
Starter Manufacturer BUILT IN
Test Data
Total CFM Actual 8305
Fan RPM Actual 1168
Motor Volts 1 Actual 211
Motor Volts 2 Actual 210
Motor Volts 3 Actual 210
Motor Amps 1 Actual 6.1
Motor Amps 2 Actual 6.03
Motor Amps 3 Actual 6.18
Motor Data
Motor Manufacturer WEG
Motor HP 3
Motor RPM 1765
Motor Rated Volts 208-230/460
Motor Phase 3
Motor FL Amps 8.54-7.72/3.86
Motor Service Factor 1.15
Motor Frame 182/4T
Motor Type ODP
Nominal Efficiency 89.5 %
Power Factor 80.0
Sheave Data
Motor Sheave Model VP56
Motor Sheave Bore 1 1/8 in.
Fan Sheave Model AK70
Fan Sheave Bore 1 in.
Number of Belts 1
Belt Size AX40 in.
Test Pressures
Fan SP In Actual ATMOSPHERE in. wc
Fan SP Out Actual ATMOSPHERE in. wc
JEDI Balancing, Inc. Page 1 of 3
09/12/17
Fan Unit
PROJECT:
LOCATION:
CASCADE CLUB PARKING
VAIL, CO
2017-8406
PROJECT #:
DATE:
CONTACT:
7/19/2017
Josh Cota
Tested By: Bryan Hund
Date: 7/10/2017
SYSTEM/UNIT: EF-02
Log: EF-02 7/10/2017 Bryan Hund WITH BIRD-SCREEN AND SAFETY GRILL. FREE
AREA CALCULATED AT 35X35 OR 8.5 SQFT. 941
FPM REQUIRED. ACTUAL 982 FPM OR 8350 CFM
Unit Data
Fan Manufacturer COOK
Fan Model Number 36EP6
Fan Serial Number 185SG65454-01/0000702
Rated CFM 8000
Total SP Design 0.75 in. wc
Total Connected CFM 8000
Starter Data
Starter Manufacturer BUILT IN
Test Data
Total CFM Actual 8350
Fan RPM Actual 1182
Motor Volts 1 Actual 211
Motor Volts 2 Actual 210
Motor Volts 3 Actual 211
Motor Amps 1 Actual 6.33
Motor Amps 2 Actual 6.2
Motor Amps 3 Actual 6.41
Motor Data
Motor Manufacturer WEG
Motor HP 3
Motor RPM 1765
Motor Rated Volts 208-230/460
Motor Phase 3
Motor FL Amps 8.54-7.72/3.86
Motor Service Factor 1.15
Motor Frame 182/4T
Motor Type ODP
Nominal Efficiency 89.5 %
Power Factor 80.0
Sheave Data
Motor Sheave Model VP56
Motor Sheave Bore 1 1/8 in.
Fan Sheave Model AK70
Fan Sheave Bore 1 in.
Number of Belts 1
Belt Size AX40 in.
Test Pressures
Fan SP In Actual ATMOSPHERE in. wc
Fan SP Out Actual ATMOSPHERE in. wc
JEDI Balancing, Inc. Page 2 of 3
09/12/17
Fan Unit
PROJECT:
LOCATION:
CASCADE CLUB PARKING
VAIL, CO
2017-8406
PROJECT #:
DATE:
CONTACT:
7/19/2017
Josh Cota
Tested By: Bryan Hund
Date: 7/10/2017
SYSTEM/UNIT: EF-03
Log: EF-03 7/10/2017 Bryan Hund DESIGN FLOW ACHIEVED AT 1653 RPM OR 92%
ON DIGITAL SPEED CONTROL. SPEED CONTROL
SET.
EF-03 7/10/2017 Bryan Hund 13.5X13.5= 1.26 SQFT. 952 DESIGN FPM. ACTUAL
984 FPM OR 1240 CFM.
Unit Data
Fan Manufacturer COOK
Fan Model Number 120 SQN
Fan Serial Number 185SG65454-00/0000701
Rated CFM 1200
Total SP Design 0.5 in. wc
Total Connected CFM 1200
Starter Data
Starter Manufacturer NONE
Test Data
Total CFM Actual 1240
Fan RPM Actual DIRECT DRIVE
Motor Volts 1 Actual 123
Motor Amps 1 Actual 2.7
Motor Data
Motor HP 1/2
Motor RPM 1725
Motor Rated Volts 115
Motor Phase 1
Motor FL Amps 3.0
Motor Service Factor 1.0
Sheave Data
Motor Sheave Model DIRECT DRIVE
Test Pressures
Fan SP In Actual ATMOSPHERE in. wc
Fan SP Out Actual 0.20 in. wc
JEDI Balancing, Inc. Page 3 of 3
09/12/17
GENERAL
1. IT IS THE INTENTION OF THE SPECIFICATIONS AND DRAWINGS TO PROVIDE FOR COMPLETE AND FULLY
OPERATIONAL SYSTEMS TO MEET THE OWNER'S REQUIREMENTS AS DESCRIBED HEREIN AND IN
ACCORDANCE WITH ALL APPLICABLE CODES AND AUTHORITIES HAVING JURISDICTION.
2. THESE DRAWINGS AND SPECIFICATIONS ARE NOT A DETAILED SET OF INSTALLATION INSTRUCTIONS BUT
RATHER A GUIDELINE TO ESTABLISH QUALITY OF EQUIPMENT AND MATERIALS, LEVEL OF WORKMANSHIP
AND PERFORMANCE. DO NOT SCALE DRAWINGS. VERIFY DIMENSIONS WITH SHOP DRAWINGS
COORDINATION EFFORT AND IN FIELD PRIOR TO COMMENCEMENT OF WORK. REFER TO ARCHITECTURAL
DRAWINGS FOR ALL DIMENSIONS.
3. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING AND REVIEWING THE ARCHITECTURAL,
STRUCTURAL, CIVIL AND ELECTRICAL DOCUMENTS FOR ANY WORK THAT AFFECTS OR OTHERWISE
IMPACTS THE MECHANICAL SCOPE OF WORK. ALL DRAWINGS AND SPECIFICATIONS ARE TO BE READ IN
COORDINATION WITH ONE ANOTHER SUCH THAT WORK SHOWN ON ONE SET IS BINDING TO THE OTHER.
4. ALL WORK, MATERIALS AND TRADES SHALL COMPLY WITH THE 2015 INTERNATIONAL BUILDING CODE (IBC)
FAMILY, THE 2014 NATIONAL ELECTRIC CODE, ALL LOCAL ORDINANCES AND AMENDMENTS, MOST CURRENT
NFPA STANDARDS, AND MANUFACTURER'S INSTALLATION INSTRUCTIONS. THE IBC FAMILY INCLUDES THE
BUILDING, MECHANICAL, PLUMBING, FUEL GAS, ENERGY CONSERVATION, AND FIRE CODES. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO PERFORM WORK IN CONFORMANCE WITH ALL APPLICABLE CODES,
ORDINANCES, AND LIFE SAFETY MEASURES AS REQUIRED, BY LOCAL, STATE AND NATIONAL AUTHORITIES.
CONTRACTOR SHALL VERIFY WITH ARCHITECT IF MODIFICATION OF WORK IS REQUIRED FOR COMPLIANCE.
5. PRIOR TO SUBMITTING A BID, EACH BIDDER SHALL CAREFULLY EXAMINE THE BIDDING DOCUMENTS. BRING
TO THE ATTENTION OF THE ARCHITECT IN WRITING, ANY DISCREPANCIES, AMBIGUITIES, INCONSISTENCIES,
OR ERRORS THEREIN THAT ARE DISCOVERED DURING EXAMINATION OF DRAWINGS AND EXISTING
EQUIPMENT. FURTHER, ALL BIDDERS SHALL EXAMINE THE SITE, CONDITION AND ALL ASSOCIATED SCOPES
OF WORK THAT FALL UNDER THIS CONTRACT AND DETERMINE ALL COSTS FOR THE WORK ARE FULLY
COVERED IN THEIR BID SUBMISSION. FAILURE TO REQUEST CLARIFICATION DURING THE BID PERIOD FOR
ANY INADEQUACY, OMISSION, OR CONFLICT SHALL NOT RELIEVE CONTRACTOR OF RESPONSIBILITIES.
SIGNING OF THE CONTRACT SHALL BE CONSIDERED TO IMPLICITLY DENOTE THAT THE CONTRACTOR HAS A
THOROUGH UNDERSTANDING OF THE FULL INTENT AND SCOPE OF THESE CONSTRUCTION CONTRACT
DRAWINGS AND SPECIFICATIONS.
6. DURING CONSTRUCTION THE CONTRACTOR SHALL ENSURE THAT ALL MATERIAL AND EQUIPMENT IS NEW
(WITH THE EXCEPTION OF USED EQUIPMENT FURNISHED BY OWNER) AND MEETS OR EXCEEDS THE
QUALITY AS SET OUT IN THE SPECIFIED EQUIPMENT AND APPLICABLE CODES. THE INSTALLATION OF ALL
EQUIPMENT AND MATERIALS SHALL BE OF THE HIGHEST WORKMANSHIP AND QUALITY. ATTENTION TO
DETAIL, SAFETY, NEATNESS, ACCESS FOR MAINTENANCE, DURABILITY, ETC. IS EXPECTED AND REQUIRED.
7. ALL EQUIPMENT SHALL BE SET STRAIGHT AND SQUARE WITH THE STRUCTURE. PIPING AND DUCTWORK
SHALL BE INSTALLED PARALLEL OR AT RIGHT ANGLES TO ALL WALLS AND STRUCTURAL MEMBERS.
HANGER RODS, EQUIPMENT BASES, SUPPORTS AND ISOLATION SHALL BE SET PLUMB AND SQUARE AND IN
VERTICAL ALIGNMENT WHERE APPLICABLE. ALL WORK SHALL BE NEAT AND CLEAN UPON COMPLETION.
ALL WORK SHALL BE PERFORMED IN A WORKMANLIKE MANNER TO THE SATISFACTION OF THE ARCHITECT,
OWNER, AND ENGINEER.
8. THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE BUILDING, STRUCTURE AND THE WORKS OF THE
OTHER TRADES INVOLVED. THIS CONTRACTOR SHALL WORK AND COOPERATE WITH THE OTHER TRADES
TO ENSURE A QUALITY INSTALLATION, AND MINIMIZE CONFLICTS.
9. THE CONTRACTOR SHALL MAKE NECESSARY REVISIONS, RE-ROUTINGS, ALTERATIONS, CHANGES AND
ADDITIONS TO ANY AND ALL WORK AS REQUIRED TO ACCOMMODATE OTHER TRADES SCOPE OF WORKS
INCLUDING ARCHITECTURAL, STRUCTURAL AND ELECTRICAL WITHOUT COST TO THE OWNER.
10. UPON COMPLETION OF THE WORK THE CONTRACTOR SHALL FURNISH TO THE OWNER A WRITTEN
GUARANTEE STATING THAT THE CONTRACT WARRANTS ALL NEW MATERIAL AND EQUIPMENT AND ALL
ASSOCIATED WORK AND COMPONENTS SHALL BE FREE FROM DEFECTS AND/OR FAILURE FOR A PERIOD OF
ONE (1) YEAR FROM THE DATE OF OWNER ACCEPTANCE AND COMPLETION. ANY AND ALL MATERIALS,
EQUIPMENT, WORKMANSHIP AND LABOR FOUND TO BE DEFECTIVE OR THAT FAILS IN ANY WAY IS TO BE
REPLACED OR CORRECTED AT NO ADDITIONAL COST TO THE OWNER. CONTRACTOR SHALL WARRANT
EXISTING EQUIPMENT FROM TIME OF DELIVERY ON SITE, THROUGH RIGGING AND INSTALLATION, AND
ENDING UPON SUCCESSFUL STARTUP AND FUNCTIONAL PERFORMANCE TESTING OF THAT EXISTING
EQUIPMENT. OWNER SHALL TAKE OVER WARRANTY OF EXISTING EQUIPMENT UPON CONTRACTOR'S
PROOF OF SYSTEM' FUNCTIONAL PERFORMANCE.
11. THE TERM "SUPPLY”, "PROVIDE", "INSTALL", OR “FURNISH” SHALL MEAN TO SUPPLY AND INSTALL ALL
NECESSARY LABOR, MATERIALS, TOOLS AND EQUIPMENT AS MAY BE NECESSARY TO INSTALL SAME FOR
THE COMPLETE AND FUNCTIONAL OPERATION OF THE MECHANICAL SYSTEMS FOR THIS PROJECT.
12. FURNISH ALL NECESSARY SLEEVES, FLASHINGS, COUNTER-FLASHINGS, INSERTS, ANCHOR BOLTS,
EQUIPMENT SUPPORTS, ETC. IN A TIMELY FASHION WHERE REQUIRED TO COMPLETE THE WORK. THIS
SHALL INCLUDE ANY AND ALL CAULKING, PATCHING, CUTTING, ETC. AS REQUIRED THROUGH ROOF AND
WALL SYSTEMS.
13. DO NOT CUT, CORE, ATTACH TO, OR MODIFY ANY STRUCTURAL OR BUILDING ELEMENTS WITHOUT
RECEIVING PRIOR APPROVAL FROM THE ENGINEER OR ARCHITECT INVOLVED.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE TRANSPORTATION AND PROTECTION OF ALL
EQUIPMENT AND MATERIAL PROVIDED FOR THIS PROJECT UNTIL THE OWNER HAS ACCEPTED THE
BUILDING. THIS SHALL INCLUDE STORAGE OF SAME ON SITE AND REMOVAL OF ALL MATERIALS AND
REFUSE AS A RESULT.
15. PROVIDE ALL NECESSARY SCAFFOLDING, LADDERS, HOISTS, RIGGING, ETC. AS REQUIRED FOR THE
INSTALLATION OF THE WORK WITHIN THIS SCOPE. ALL HOISTING, SUPPORTS, DELIVERY, ETC OF
EQUIPMENT AND MATERIAL FOR THIS PROJECT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR.
16. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF THE BUILDING, WORK OF OTHERS,
ETC. DURING THE COURSE OF CARRYING OUT THE WORK AS INVOLVED IN THIS CONTRACT. THE
CONTRACTOR SHALL MAKE GOOD AND/OR PAY FOR ANY DAMAGES SUSTAINED. THE OWNER RESERVES
THE RIGHT TO BACK CHARGE THE CONTRACTOR FOR THE REPAIR AND/OR REPLACEMENT OF ANY
DAMAGES.
17. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND PAY FOR ALL
NECESSARY FEES OR OTHER COSTS ASSOCIATED WITH CARRYING OUT THE WORK HEREIN. THE
CONTRACTOR IS RESPONSIBLE FOR PROVIDING ANY AND ALL CERTIFICATES AS REQUIRED TO ENSURE
THAT THE INSTALLATION IS IN CONFORMANCE WITH, AND HAS BEEN APPROVED BY ALL AUTHORITIES
HAVING JURISDICTION. ANY REVISIONS AND/OR CHANGES REQUIRED BY THE AUTHORIZED INSPECTOR
SHALL BE DONE WITHOUT CHARGE TO THE OWNER AND SHALL BE DONE SO AS NOT TO AFFECT SCHEDULE
OR THE WORK OF OTHERS. ALL PERMITS SHALL BE POSTED IN A CONSPICUOUS PLACE ON SITE. UPON
COMPLETION THIS CONTRACTOR SHALL PROVIDE THE OWNER WITH A CERTIFICATE OF FINAL APPROVAL
FROM ALL AUTHORITIES INVOLVED IN THE SCOPE OF HIS WORK.
18. IN CARRYING OUT THE WORK, THE CONTRACTOR SHALL UTILIZE TRADESPEOPLE THAT ARE FULLY
QUALIFIED, LICENSED, EXPERIENCED AND KNOWLEDGEABLE IN THEIR RESPECTIVE AREAS OF THE
CONSTRUCTION INDUSTRY AND SHALL PERFORM WORK IN A RESPONSIBLE MANNER WITH ESTABLISHED
CONSTRUCTION PRACTICE.
19. PRIOR TO COMMENCEMENT OF THE WORK, CONTRACTOR SHALL CONCLUSIVELY COORDINATE THE
DETAILED INSTALLATION OF THE AND EQUIPMENT WITH ALL CONDUIT, CABLE TRAYS, STRUCTURAL,
STRUCTURAL ELEMENTS, AND OTHER WORK OF OTHER TRADES. NO ADDITIONAL COSTS WILL BE
CONSIDERED FOR CHANGES AS A RESULT OF INTERFERENCE WITH THE WORK OF OTHERS. THIS INCLUDES
ANY ADDITIONAL MATERIAL REQUIRED TO CORRECT MINOR JOB CONFLICTS FOR NORMALLY ACCEPTED
PROCEDURES OF ANY AND ALL TRADES.
20. CLEAN ALL EQUIPMENT, MATERIALS, WALLS, CEILINGS, FLOORS, PIPING, DUCTS, ETC. OF A DIRT, OIL, DUST
AND PACKAGING MATERIAL AFFECTED DURING THE COURSE OF THIS WORK. DISCONNECT, CLEAN AND
RECONNECT WHERE NECESSARY, FOR THE PURPOSE OF LOCATING AND REMOVING OBSTRUCTIONS.
21.REMOVE ALL TOOLS, WASTE MATERIAL, TRASH, AND PACKAGING MATERIALS GENERATED BY THIS WORK
FROM THE SITE. UPON COMPLETION ENSURE ALL SURFACES ARE CLEANED OF GREASE, DIRT, ETC. ONCE
COMPLETED, THE FACILITY SHALL BE AVAILABLE FOR IMMEDIATE USE.
22. ALL EQUIPMENT AND MATERIAL SPECIFIED AND NOTED ON THE DRAWINGS IS SET AS A MINIMUM STANDARD
FOR THE CONTRACTOR TO WORK TO. ALL SUBMITTED TENDERS SHALL BE BASED ON MATERIAL AND
EQUIPMENT AS SPECIFIED. EQUIPMENT AND MATERIAL SUPPLIERS OTHER THAN THOSE SPECIFIED ARE TO
MAKE A WRITTEN SUBMISSION FOR CONSIDERATION AS AN EQUAL OR ALTERNATE ALONG WITH ANY COST
SAVINGS THAT MAY BE REALIZED AS A RESULT OF USING HIS EQUIPMENT. SUBMISSION FOR
CONSIDERATION AS AN EQUIVALENT SHALL BE MADE, ALONG WITH TECHNICAL INFORMATION, A MINIMUM
OF 5 BUSINESS DAYS BEFORE BID DATE.
23. SHOULD ENGINEER ALLOW CONTRACTOR TO USE EQUIVALENT EQUIPMENT AND MATERIALS FROM AN
APPROVED MANUFACTURER OTHER THAN THAT SPECIFICALLY SPECIFIED, IN ACCORDANCE WITH
PROCEDURES ABOVE, THE USE OF SAME DOES NOT RELIEVE THE CONTRACTOR FROM CONFIRMING TO
OTHER TRADES AFFECTED ALL RELEVANT INFORMATION SUCH AS DIMENSIONS, ELECTRICAL, WEIGHT, ETC.
ANY NECESSARY REVISIONS AS A RESULT SHALL BE PAID FOR BY THIS CONTRACTOR. IF THE PROPOSED
EQUIPMENT OR NECESSARY MODIFICATIONS ARE NOT TO THE SATISFACTION OF THE ENGINEER THAT THE
END RESULT WILL BE THE SAME THE CONTRACTOR SHALL PROVIDE THE SPECIFIED EQUIPMENT AT NO
ADDITIONAL COST TO THE OWNER.
24. CONSTRUCTION PHASE SUBMITTALS - CONTRACTOR SHALL SUBMIT ELECTRONIC COPIES OF ALL SHOP
DRAWINGS AND PRODUCT DATA FOR EQUIPMENT PROPOSED AND INSTALLATION DETAILS, REROUTINGS,
ETC PER THE COORDINATION EFFORT FOR THIS PROJECT TO THE ENGINEER FOR REVIEW PRIOR TO
ORDERING MATERIALS OR EQUIPMENT. PRODUCT DATA SHALL STATE CAPACITIES, SIZES, ETC. OF ALL
EQUIPMENT AND SHALL BE CERTIFIED. INCLUDE COMPUTER BASED SELECTIONS OF PROJECT SPECIFIC
CONDITIONS WHERE APPLICABLE. CLEARLY MARK EACH SHOP DRAWING, CATALOG CUT AND/OR
SPECIFICATION SHEET TO INDICATE THOSE PRODUCTS AND FEATURES WHICH ARE INTENDED TO BE
FURNISHED. ENGINEER RESERVES THE RIGHT TO REJECT SUBMITTALS THAT ARE INADEQUATELY OR
UNCLEARLY MARKED. SPECIFICALLY INDICATE ANY DEVIATIONS FROM THE DESIGN INTENT. ENGINEER
RESERVES THE RIGHT TO REQUIRE CORRECTION AT NO EXTRA COST FOR DEVIATIONS NOT SPECIFICALLY
INDICATED IN THE SUBMITTAL. REVIEW AND APPROVAL OF SUBMITTALS SHALL NOT RELIEVE THE
CONTRACTOR FROM THE RESPONSIBILITY TO FURNISH EQUIPMENT AND MATERIALS OF PROPER
DIMENSION, SIZE, QUANTITY, QUALITY AND ALL PERFORMANCE CHARACTERISTICS TO EFFICIENTLY
PERFORM THE REQUIREMENTS AND INTENT OF THE CONTRACT DOCUMENTS.
25. CLOSEOUT SUBMITTALS - OPERATION AND MAINTENANCE MANUALS: UPON RECEIPT OF REVIEWED
SUBMITTALS, CONTRACTOR SHALL IMMEDIATELY COMMENCE COMPILING OPERATIONS AND MAINTENANCE
DATA MANUALS (O&M'S). SUBMIT O&M'S FOR REVIEW NO LESS THAN THIRTY (30) CALENDAR DAYS PRIOR
TO SUBMITTING NOTICE OF SUBSTANTIAL COMPLETION. O&M'S SHALL CONTAIN AT A MINIMUM:
TABLE OF CONTENTS
TABBED DIVIDERS
INDEX
CONSTRUCTION PHASE SUBMITTALS W/ ENGINEER'S REVIEW
SYSTEMS DESCRIPTIONS
MAINTENANCE TASKS
LUBRICATION INFORMATION
LIST OF CONTRACTORS
EQUIPMENT SUPPLIERS' PARTS LISTS, TROUBLESHOOTING GUIDES, AND MAINTENANCE DATA
TESTING/INSPECTION, CERTIFICATES, BALANCING REPORTS
IDENTIFICATION DIRECTORY
UPON COMPLETION OF REVIEW, SUBMIT TWO (2) COPIES NEATLY BOUND IN 3-RING BINDERS, TABBED, AND
LABELED AND (1) ELECTRONIC COPY WITH SIMILAR TABBING AND ORGANIZATION FOR EASE OF
NAVIGATION, SIMILAR TO THE HARD COPIES
26. CLOSEOUT SUBMITTALS - AS-BUILTS AND RECORD DRAWINGS: UPON COMPLETION, CONTRACTOR SHALL
SUBMIT FOR REVIEW MARKED UP RECORD DRAWINGS INDICATING ALL DIMENSIONS, INVERTS, DISTANCES
FROM STRUCTURE, AND ALL DEVIATIONS OF THE AS-BUILT INSTALLATION FROM THE GRAPHICAL
REPRESENTATIONS ON THE CONTRACT DOCUMENTS. UPON COMPLETION OF REVIEW, SUBMIT TWO (2)
FULL SIZE COPIES, BOUND AND ONE (1) ELECTRONIC COPY.
27.USE OF THE PERMANENT HEATING SYSTEM PRIOR TO COMPLETION OF CONSTRUCTION SHALL NOT BE
PERMITTED WITHOUT WRITTEN PERMISSION FROM THE OWNER/ENGINEER. TEMPORARY HEAT SHALL BE
PROVIDED BY THE GENERAL CONTRACTOR. ANY EQUIPMENT THAT IS PERMITTED TO BE USED SHALL BE
PROFESSIONALLY CLEANED BY SPECIALIST, LUBRICATED AND NEW FILTERS INSTALLED PRIOR TO
TURNOVER TO OWNER AT COMPLETION.
28.ELECTRICAL COORDINATION - ALL MOTORS SUPPLIED WITH MECHANICAL EQUIPMENT SHALL BE 1800 RPM
MAXIMUM UNLESS OTHERWISE SPECIFIED. VERIFY AVAILABLE VOLTAGE AND PHASE ON SITE AND
ACCORDING TO ELECTRICAL DRAWINGS. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR CONFIRMING
ANY AND ALL ELECTRICAL INFORMATION AND EQUIPMENT/SYSTEMS COMPATIBILITY PRIOR TO ORDERING
ANY EQUIPMENT. THIS CONTRACTOR SHALL BE RESPONSIBLE TO FURNISH ALL NECESSARY STARTERS
FOR MECHANICAL EQUIPMENT UNLESS NOTED OTHERWISE. ELECTRICAL CONTRACTOR SHALL BE
RESPONSIBLE TO SET IN PLACE AND WIRE STARTERS PROVIDED BY THIS CONTRACTOR.
29. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE RECEIVING AND INSTALLATION OF ALL OWNER
SUPPLIED EQUIPMENT UNLESS NOTED OTHERWISE. THIS SCOPE REQUIRES COORDINATION WITH THE
OWNER SUPPLIED EQUIPMENT, AND NOT ALL DETAILS OF THAT EQUIPMENT ARE NECESSARILY INCLUDED IN
THESE DRAWINGS. REFER TO ORIGINAL INSTALLATION DRAWINGS, MANUFACTURER'S DRAWINGS,
ORIGINAL EQUIPMENT SUBMITTAL DATA SHEETS, AND EQUIPMENT MANUFACTURER'S RESELECTIONS AND
REFURBISHMENT GUIDELINES FOR NEW PROJECT ALTITUDE, AND MEET THE REQUIREMENTS DEFINED
THEREIN.
DUCTWORK, EQUIPMENT AND ACCESSORIES
1. UNLESS NOTED OTHERWISE, DUCTWORK SHALL BE CONSTRUCTED AND SEALED IN CONFORMANCE WITH
SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS, LATEST EDITION AND ASHRAE STANDARDS. DUCT
CONSTRUCTION PRESSURE CLASS SHALL BE AS FOLLOWS:
MEDIUM PRESSURE SUPPLY DUCT, BETWEEN AIR HANDLING UNIT AND SUPPLY TERMINAL BOX INLET: 4
INCH POSITIVE/NEGATIVE.
LOW PRESSURE SUPPLY DUCT, DOWNSTREAM OF SUPPLY TERMINAL BOX OUTLET: 2 INCH
POSITIVE/NEGATIVE.
LOW PRESSURE RETURN AND EXHAUST DUCT: 2 INCH POSITIVE/NEGATIVE.
TESTING, STARTUP, ADJUSTING AND BALANCING
1. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TESTING OF ALL EQUIPMENT BOTH NEW AND USED
EQUIPMENT FURNISHED BY OWNER, PIPING AND MATERIALS AS NOTED HEREIN AND AS REQUIRED BY
LOCAL INSPECTORS AND AUTHORITIES IN ORDER TO ENSURE AND PROVE THAT ALL SYSTEMS AND
COMPONENTS ARE INSTALLED AND FUNCTIONING PROPERLY. THE CONTRACTOR SHALL ALLOW IN BID ALL
NECESSARY COSTS INCLUDING ADDITIONAL LABOR AND MATERIAL TO DO SO.
2. NOTIFY THE OWNER/ENGINEER PRIOR TO STARTING ANY TESTING. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL DAMAGES THAT OCCUR AS A RESULT OF TESTING, AND SHALL BE RESPONSIBLE
FOR ALL COSTS ASSOCIATED WITH LIABILITY AND REPAIRS AS NECESSARY.
3. ALL DEFECTS, ETC. SHALL BE REPAIRED OR REPLACED IMMEDIATELY UPON DISCOVERY. LEAKING JOINTS
SHALL BE RE-DONE AND COMPLETED IN A TIMELY MANNER.
4. PERFORMANCE TESTS SHALL BE CARRIED OUT UPON COMPLETION OF PRESSURE TESTS AND
INSTALLATION. THE CONTRACTOR SHALL MAKE ALL NECESSARY CHANGES AND MODIFICATIONS AS
REQUIRED TO DELIVER AN OPERATIONAL SYSTEM.
5. ALL AIR SYSTEMS SHALL BE BALANCED TO WITHIN +/-5% OF VALUES SPECIFIED. AIR BALANCING SHALL BE
CARRIED OUT BY AN INDEPENDENT AGENCY SPECIALIZING IN THIS FORM OF WORK AND IN ACCORDANCE
WITH GUIDELINES ESTABLISHED BY THE AABC.
6. TO OBTAIN SPECIFIED AIR VOLUMES THIS CONTRACTOR SHALL MAKE ALL NECESSARY BELT AND SHEAVE
CHANGES, ADD DAMPERS, VALVES, ETC. AS MAY BE REQUIRED AT NO ADDITIONAL COST TO THE
CONTRACT.
7. PREPARE AND SUBMIT ELECTRONIC COPY OF COMPLETED REPORTS FOR ALL AIR HANDLING SYSTEMS AS
PER THE NATIONAL GUIDELINES FOR SAME.
CONTROLS
1. ALL AUTOMATIC CONTROLS FOR MECHANICAL EQUIPMENT SHALL BE FURNISHED BY THE MECHANICAL
CONTRACTOR. WHERE AUTOMATIC CONTROLS REQUIRE WIRING OF ANY SYSTEMS OPERATING AT
VOLTAGE IN EXCESS OF 30V, MECHANICAL CONTRACTOR SHALL RETAIN A LICENSED AND QUALIFIED
ELECTRICAL CONTRACTOR TO PERFORM THE WORK. THE ELECTRICAL SUBCONTRACTOR TO THE
MECHANICAL SHALL INSTALL ALL ELECTRICAL LINE VOLTAGE WIRING AND RACEWAY REQUIRED BY THE
AUTOMATIC CONTROL SYSTEM. INSTALLATION OF THE ELECTRICAL SUBCONTRACTOR SHALL BE DONE
UNDER THE SUPERVISION OF THE MECHANICAL CONTRACTOR.
2. CONTROL WIRING, CONDUIT AND ELECTRICAL DEVICES SHALL COMPLY WITH THE REQUIREMENTS OF THE
NEC. ALL CONTROL WIRING SHALL BE COLOR CODED AND TAGGED FOR EASY IDENTIFICATION. ALL
LOW-VOLTAGE CONTROL WIRING NOT SUBJECT TO THE NEC SHALL BE INSTALLED IN RACEWAY.
3. IT IS THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO ENSURE THAT ALL CONTROL DEVICES
AND CONTROLLED EQUIPMENT ARE INSTALLED CORRECTLY AND FUNCTION PROPERLY, AND THAT ALL
MECHANICAL EQUIPMENT OPERATES AS DESIGN AND SPECIFIED, IN CONJUNCTION WITH THE CONTROLS.
4. SUBMIT SHOP DRAWINGS OF WIRING DIAGRAMS AND CONTROL DEVICES FOR ENGINEER'S REVIEW.
MAINTAIN AS-BUILT RECORD COPY OF WIRING DIAGRAMS DURING CONSTRUCTION AND INCORPORATE ALL
FIELD CHANGES INTO A COMPREHENSIVE CONTROLS WIRING DIAGRAM FOR INCLUSION WITH THE O&M'S AT
PROJECT CLOSEOUT.
MECHANICAL SYSTEMS SPECIFICATIONS
MEP SHEET INDEX
ISSUE LOG LEGEND ISSUE LOG
DISCONTINUED
INCLUDED IN SET ISSUANCE
NOT INCLUDED IN SET ISSUANCE
ISSUED WITHOUT CHANGES
O
SHEET
NUMBER
SHEET TITLE
MEP-1 MEP COVER SHEET
MEP-2 PARKING LEVEL - NEW WORK
MEP-3 ELECTRICAL SCHEDULES AND SCHEMATICS
MEP-4 MECHANICAL DETAILS AND CONTROLS
1.
a. FAN INSTALLATION - TWO (2) NEW EXHAUST FANS SHALL BE INSTALLED
AND EQUIPPED WITH TWO SPEED MOTORS AND SUPPLIED WITH
2-SPEED MOTOR STARTERS. ADDITIONALLY, ONE (1) INLINE EXHAUST
FAN SHALL BE INSTALLED TO RUN CONTINUOUSLY TO SATISFY THE
MINIMUM EXHAUST REQUIREMENTS PER 2015 IMC.
b. CONTROLS - 2015 IMC REQUIRES BOTH CARBON MONOXIDE (CO) AND
NITROGEN DIOXIDE (NO2) SENSORS. COVERAGE STUDIES HAVE BEEN
PERFORMED USING MACURCO DEVICES AS BASIS OF DESIGN. A TOTAL
OF TEN (10) SENSORS OF EACH TYPE ARE REQUIRED BASED ON THIS
EXERCISE. SUCCESSFUL CONTROLS VENDOR SHALL PROVIDE SHOP
DRAWING SHOWING PROPOSED GAS DETECTOR COVERAGE IF
DIFFERENT FROM BASIS OF DESIGN.
2. PROJECT CONSTITUTES INCREASED LOAD
FOR MECHANICAL EQUIPMENT, GARAGE DOOR OPERATOR AND DRY
SPRINKLER SYSTEM AIR COMPRESSOR. LIGHTING UPGRADE IS DEEMED TO
REPRESENT A LOAD REDUCTION TO THE LIGHTING PANELS. THOUGH
OVERALL SYSTEM ADDITIONAL LOAD AT THE EXISTING MAIN DISTRIBUTION
CENTER IS DEEMED NEGLIGIBLE, ADDITIONAL LOAD ON PANEL 'HP2' IS NOT
NEGLIGIBLE. THE EXISTING LOADS ON THE ELECTRICAL SYSTEM AT THIS
POINT ARE NOT KNOWN AND CANNOT BE CONFIDENTLY VERIFIED WITH
NEC CALCULATION. 30-DAY METERING IN ACCORDANCE WITH NEC SHALL BE
REQUIRED. INSTALL LOAD RECORDING METER IMMEDIATELY UPON AWARD
OF CONTRACT. DOWNLOAD DATA AFTER 7 DAYS OF RECORDING AND
IMMEDIATELY SUBMIT TO ENGINEER TO REVIEW FOR INITIAL VERIFICATION
OF SYSTEM SUITABILITY FOR CURRENTLY DEPICTED DESIGN.
3. THE EXISTING LIGHTING SYSTEM CONSISTS OF A TOTAL
OF SEVENTY NINE (79) OPEN CAGED FLUORESCENT UPLIGHTS, THIRTY FIVE
(35) OF WHICH ARE ROUGHLY 4FT LONG WHILE THE REMAINING FORTY
FOUR (44) FIXTURES ARE APPROXIMATELY 8FT LONG. SCOPE INCLUDES
REPLACEMENT OF ALL EXISTING FIXTURES WITH TWELVE (12) NEW LED
HIGH BAY FIXTURES. ANY NEW CABLING REQUIRED SHALL BE IN EMT AND
PAINTED TO COLOR AS SPECIFIED BY ARCHITECT. SEE LUMINAIRE SCHEDULE
FOR ADDITIONAL INFORMATION.
GENERAL SCOPE OVERVIEW NOTES:
1. FIRE SPRINKLER SCOPE - THE EXISTING COVERAGE SPACING IS BASED ON LIGHT HAZARD
OCCUPANCY AND NOT SUITED FOR RE-USE WITHOUT SIGNIFICANT MODIFICATION TO
ACHIEVE COVERAGE, SPACING AND DENSITY REQUIREMENTS OF CHANGE IN USE TO
MOTOR VEHICLE PARKING. SCOPE INCLUDES COMPLETE REMOVAL OF EXISTING
SYSTEMS AND REPLACEMENT WITH COMPLETELY NEW DRY SYSTEM WITH
SPACING/DENSITY COVERAGE FOR ORDINARY HAZARD GROUP I CLASSIFICATION. DRY
VALVE ASSEMBLY AND AIR COMPRESSOR SHALL BE LOCATED IN CONDITIONED SPACE.
HEAT TRACING OF DRY VALVE ASSEMBLY SHALL NOT BE PERMITTED. SEE DELEGATED
DESIGN NOTES FOR FURTHER INFORMATION.
2. FIRE PROTECTION SYSTEM PIPING SHALL BE HYDRAULICALLY CALCULATED,
SIZED, AND BID USING SCHEDULE 40 CUT-GROOVED, THREADED, OR WELDED
PIPE. REDUCED PIPE SIZES SUCH AS SCHEDULE 30 WITH ANTIMICROBIAL
COATING FOR EQUIVALENT CORROSION RESISTANCE RATING SHALL NOT BE
PERMITTED IN THE BASE BID.
3. PERFORM NEW SITE FIRE FLOW TEST IF EXISTING DATA AVAILABLE FROM THE
AHJ OR THE WATER UTILITY PROVIDER IS OLDER THAN SIX (6) MONTHS. ASSUME
THAT THE FLOW TEST DATA IS OLDER THAN SIX MONTHS. INCLUDE COST TO
PARTICIPATE IN AND OBSERVE THE FLOW TEST PROCEDURE. FLOW TEST SHALL
BE PERFORMED PRIOR TO THE DESIGN AND HYDRAULIC CALCULATIONS. TEST
DATA ALONG WITH HYDRAULIC CALCULATIONS SHALL BE INCLUDED IN THE
SUBMITTAL OF SPRINKLER SHOP DRAWINGS TO THE FIRE MARSHALL HAVING
JURISDICTION.
4. PIPE SCHEDULE DESIGN METHODS ARE NOT PERMITTED. HYDRAULIC
CALCULATIONS MUST BE PERFORMED TO ALL APPLICABLE NFPA SPECIFICATIONS
AND SUBMITTED TO THE ARCHITECT/ ENGINEER FOR APPROVAL AS PART OF THE
SHOP DRAWING PROCEDURE.
5. PROVIDE DRAWINGS AND CALCULATIONS WITH SEAL OF LICENSED FIRE
PROTECTION ENGINEER OR NICET III LEVEL TECHNICIAN FOR SUBMITTAL TO FIRE
MARSHALL AND TOWN OF VAIL PRIOR TO INSTALLATION.
6. DESIGN PARAMETERS:
OCCUPANCY CLASSIFICATIONS - ORDINARY HAZARD, GROUP I.
DENSITY: ORDINARY HAZARD - 0.15 GPM / SF
COVERAGE: ORDINARY HAZARD - 130 SF / SPRINKLER (15' MAXIMUM
ALLOWABLE SPACING; HOWEVER, BASIS OF DESIGN PIPING SHALL BE 10' X 12'
MAXIMUM).
FIRE PROTECTION DELEGATED DESIGN NOTES:
1. COORDINATE EXACT LOCATION AND ELECTRICAL CONNECTION
REQUIREMENTS OF EACH PIECE OF MECHANICAL EQUIPMENT
WITH MECHANICAL CONTRACTOR PRIOR TO ROUGH-IN.
2. SEAL PENETRATIONS OF FIRE RATED ASSEMBLIES WITH U/L
APPROVED MATERIALS AND METHODS TO MAINTAIN FIRE
RATING.
3. PROVIDE DEDICATED NEUTRAL CONDUCTORS FOR ALL
BRANCH CIRCUITS.
4. ALL NEW BRANCH CIRCUITS SHALL BE ROUTED IN EMT.
GENERAL POWER SCOPE NOTES:
ELECTRICAL ABBREVIATIONS
SUFFIX DESCRIPTION
ADA AMERICANS WITH DISABILITIES ACT
AF/AT AMP FRAME, AMP TRIP
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AIC EMPERES INTERRUPTING CAPACITY (SYMMETRICAL)
AMP or A AMPERE
AS/AF AMP SWITCH, AMP FUSE
ATS AUTOMATIC TRANSFER SWITCH
AVG AVERAGE
AWG AMERICAN WIRE GAUGE
C CONDUIT
CB CIRCUIT BREAKER
CIRC, CKT CIRCUIT
CT CURRENT TRANSFORMER
DISC DISCONNECT
E EXISTING
EF EXHAUST FAN
EMT ELECTRICAL METALLIC TUBING
ENT ELECTRICAL NON-METALLIC TUBING
EPO EMERGENCY POWER OFF
FA FIRE ALARM
FLA FULL LOAD AMPS
FSD FIRE SMOKE DAMPER
FT or ' FEET
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GFP GROUND FAULT PROTECTION
GRD GROUND
H,W,D,L HEIGHT, WIDTH, DEPTH, LENGTH
HOA HAND-OFF-AUTO
HP HORSEPOWER
HVAC HEATING, VENTILATION AND AIR CONDITIONING
IG ISOLATED GROUND
IN or " INCHES
JBOX JUNCTION BOX
KVA KILOVOLT AMPERES
KW KILOWATT
KWH KILOWATT HOUR
LF LINEAR FEET
LTG or LTS LIGHTING
M METER
MAX MAXIMUM
MCA MINIMUM CIRCUIT AMPACITY
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MCM THOUSAND CIRCULAR MILS
MCP MOTOR CIRCUIT PROTECTOR
MFR MANUFACTURER
MIN MINIMUM
MLO MAIN LUGS ONLY
MOCP MAXIMUM OVERCURRENT PROTECTION
MON MONITORING
MTD MOUNTED
NC/NO NORMALLY CLOSED/NORMALLY OPEN
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION
NF NON-FUSED
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO or # NUMBER
NTS NOT TO SCALE
OFCI OWNER FURNISHED, CONTRACTOR INSTALLED
P POLE
PC PHOTOCELL
PH PHASE
PROVIDE FURNISH, INSTALL AND CONNECT
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE
REC or RECEPT RECEPTACLE
RGS RIGID GALVANIZED STEEL
RMS ROOT MEAN SQUARE
SPD SURGE PROTECTION DEVICE
SPST SINGLE-POLE, SINGLE-THROW
SQ SQUARE
TC TIMECLOCK
TEL/DATA TELEPHONE/DATA
TV TELEVISION
TYP TYPICAL
UGPS UNDERGROUND PULL SECTION
UON UNLESS OTHERWISE NOTED
UPS UNITERRUPTABLE POWER SYSTEM
V VOLTS
VA VOLT AMPERES
VAV VARIABLE AIR VOLUME
VD VOLTAGE DROP
W WIRE
WP WEATHERPROOF
XFMR TRANSFORMER
%Z PERCENTAGE IMPEDANCE
MECHANICAL ABBREVIATIONS
SUFFIX DESCRIPTION
AAV AIR ADMITTANCE VALVE
ABV ABOVE
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHU AIR HANDLING UNIT
AUTO AUTOMATIC
AVG AVERAGE
BAS BUILDING AUTOMATION SYSTEM
BDD BACKDRAFT DAMPER
BFG BELOW FINISHED GRADE
BTU BRITISH THERMAL UNITS
BTUH BTU'S PER HOUR
CA COMBUSTION AIR
CFM CUBIC FEET PER MINUTE (AIR FLOW RATE)
CLG CEILING
CO CLEAN OUT
COTG CLEAN OUT TO GRADE
CU CONDENSING UNIT
D or (D) DEMO
DIA DIAMETER
DHW DOMESTIC HOT WATER
DN DOWN
DW DOMESTIC WATER
DWR DOMESTIC HOT WATER RECIRCULATION
E or (E) EXISTING
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EF EXHAUST FAN
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
FA FREE AREA
FACP FIRE ALARM CONTROL PANEL
FCT FOR CONTINUATION
FD FIRE DAMPER
FFI FOR FURTHER INFORMATION
FLA FULL LOAD AMPS
FSD COMBINATION FIRE/SMOKE DAMPER
FT or ' FEET
GPM GALLONS PER MINUTE (WATER FLOW RATE)
H,W,D,L HEIGHT, WIDTH, DEPTH, LENGTH
HOA HAND-OFF-AUTO
HP HORSEPOWER
HVAC HEATING, VENTILATION AND AIR CONDITIONING
ILO IN LIEU OF
IN or " INCHES
IN WC INCHES OF WATER COLUMN
LF LINEAR FEET
LTG or LTS LIGHTING
LWT LEAVING WATER TEMPERATURE
M METER
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
MCA MINIMUM CIRCUIT AMPACITY
MBH BTUH X 1000
MFR or MFG MANUFACTURER
MIN MINIMUM
MOD MOTOR OPERATED DAMPER
MOCP MAXIMUM OVERCURRENT PROTECTION
MTD MOUNTED
MVD MANUAL VOLUME DAMPER
N OR (N) NEW
NC/NO NORMALLY CLOSED/NORMALLY OPEN
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION
NIC NOT IN CONTRACT
NO or # NUMBER
NTS NOT TO SCALE
OA, ODA, OSA OUTDOOR AIR
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OFCI OWNER FURNISHED, CONTRACTOR INSTALLED
PROVIDE FURNISH AND INSTALL
RA RETURN AIR
REQ'D REQUIRED
REQ'MT REQUIREMENT
RE: REFER TO:
RTU ROOF TOP UNIT
SA SUPPLY AIR
SD SMOKE DAMPER
SF SQUARE FEET
SFFA SQUARE FEET FREE AREA
TON 12,000 BTUH COOLING CAPACITY
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UON OR UNO UNLESS OTHERWISE NOTED
V VOLTS
VAV VARIABLE AIR VOLUME
VTR VENT THRU ROOF
WCO WALL CLEAN OUT
WH WATER HEATER
WP WEATHERPROOF
W/ WITH
XFR TRANSFER
EXHAUST FANS
TAG EF-1 EF-2 EF-3
DESCRIPTION
GARAGE EXHAUST FAN SEE EF-1 GARAGE EXHAUST FAN
FUNCTION
GARAGE VENTILATION SEE EF-1
MINIMUM CONTINUOUS
GARAGE VENTILATION
LOCATION WALL, NW CORNER WALL, NE CORNER
CEILING SUSPENDED,
NW CORNER
DRIVE BELT SEE EF-1 DIRECT
AIR FLOW (CFM) 8000 SEE EF-1 1200
EFFECTIVE PLUME HT
ESP
@ S.L. (IN WC) 0.75 SEE EF-1 0.5
@ ALT (IN WC) 0.59 SEE EF-1 0.39
WHEEL TYPE AXIAL/ PROPELLER SEE EF-1 CENTRIFUGAL
CLASS
SPEED (RPM) 1110 SEE EF-1 1536
ELECTRIC
NAMEPLATE HP 3 SEE EF-1 1/2
BRAKE HP 2.06 SEE EF-1 216 W
VOLTAGE / PH 208/3 SEE EF-1 115/1
EM POWER SEE EF-1
STARTER SEE EF-1
MAX SONES (NC) 30 SEE EF-1 10.2
WEIGHT (LBS) 497 SEE EF-1 112
BASED ON:
COOK
MODEL #
COOK 36EP614B SEE EF-1 COOK 120SQN17DEC
REMARKS: A, B SEE EF-1 A, B
ACCESSORIES: C SEE EF-1 D
NOTES: E SEE EF-1 E
GENERAL NOTES, FEATURES AND ACCESSORIES:
A. BASIS OF DESIGN (BOD) MAKES & MODELS NOTED ABOVE DEFINE PHYSICAL SIZES, CHARACTERISTICS, MANUFACTURING DETAILS
AND OTHER FEATURES NOT NECESSARILY SCHEDULED ABOVE BUT LIKELY COMTEMPLATED DURING THE DESIGN PROCESS.
ALTERNATIVE MANUFACTURERS AVAILABLE TO BIDDERS: GREENHECK. BIDDERS SHALL BE RESPONSIBLE TO VERIFY EQUIVALENCY
OF ALTERNATIVES TO THE BOD IF USING ALTERNATIVE IN THEIR BID. ENGINEER WILL NOT REVIEW ALTERNATIVES FOR
EQUIVALENCY DURING THE BID PHASE.
B. PROJECT IS AT ALTITUDE. GARAGE SPACE WILL BE UNCONDITIONED, FAN MOTOR SELECTIONS ARE AT 0F INLET TEMP.
C. ACCESSORIES: PREMIUM EFFICIENCY 2-SPEED MOTOR, MOTORIZED SHUT-OFF DAMPER (115V), NEMA1 DISCONNECT, SHUTTER
GUARD WITH INSECT SCREEN, SPARE BELT SET, BELT TENSIONER.
D. ACCESSORIES: MOTOR MOUNTED SPEED CONTROL, NEMA1 DISCONNECT, MOTORIZED SHUT-OFF DAMPER (115V), INLET GUARD,
FILTER BOX WITH ALUMINUM FILTER.
E. RE: MEP-4 FOR FAN INSTALLATION DETAIL.
(303)
900-8782 PO Box
3699,
Evergreen, CO 80437
STBENGR.COM
INFO@STBENGR.COM
1295
WESTHAVEN
DRIVE
VAIL, CO 81657
10/17/16
09/12/17
PARKING LEVEL - NEW WORK
SCALE: 1/8" = 1'-0"
0 10' 20'
GENERAL NOTES:
1. REPLACE EXISTING LAMPS WITH (N) LED LAMPS AS SHOWN. INCLUDE
IN COST THE REMOVAL OF EXISTING LIGHTING FIXTURES AND LAMPS.
DISPOSE OF EXISTING FLUORESCENT LIGHTING EQUIPMENT PER
LOCAL REGULATIONS AS REQUIRED.
2. (E) WET TYPE FIRE SPRINKLER SYSTEM TO BE REPLACED WITH (N)
DRY TYPE FIRE SPRINKLER SYSTEM, AS NECESSITATED BY THE
PLANNED UNCONDITIONED PARKING GARAGE.
FLAG NOTES:
CO SENSOR, INSTALLED 5' AFF.
NO2 SENSOR, INSTALLED 5' AFF.
ADDRESSABLE DETECTION AND VENTILATION CONTROL PANEL, SEE
CONTROLS DRAWINGS.
INSTALL (N) EXHAUST FANS INCLUDING MOTOR OPERATED
DAMPER. RE: EXHAUST FAN SCHEDULE
INSTALL (N) EXHAUST FAN SUSPENDED FROM CEILING. FAN SHALL
OPERATE CONTINUOUSLY TO PROVIDE MINIMUM VENTILATION
REQUIREMENT. RE: EXHAUST FAN SCHEDULE.
(D) ALL EXISTING LIGHTING FIXTURES AND INSTALL NEW TYPE S1
LIGHTING FIXTURES, TYP 12.
REUSE EXISTING CIRCUITING AND CONTROLS TO FEED NEW FIXTURES.
IN ADDITION TO EXISTING BUILDING LIGHTING CONTROLS, NEW
FIXTURES SHALL HAVE INTEGRAL MOTION SENSOR TO ALLOW NEW
SYSTEM TO DIM TO 10% WHEN GARAGE IS UNOCCUPIED.
PROVIDE MAINTENANCE RECEPTACLES AS REQUIRED.
(E) GAS FIRED RADIANT HEAT PANELS TO REMAIN. TYP 12.
(N) L1 ELECTRICAL PANEL, FED FROM (E) MDC ELECTRICAL PANEL
LOCATED IN MAIN ELECTRICAL ROOM APPROXIMATELY 120 FT. DISTANT.
VISIT SITE PRIOR TO BID TO VERIFY DISTANCE.
(N) L1A ELECTRICAL PANEL, FED FROM (N) L1 ELECTRICAL PANEL.
(N) 75 KVA TRANSFORMER.
NEW DISCONNECT.
PROVIDE RACEWAY FROM (N) L1 TO JUNCTION BOX, TYP. 2, FOR
GARAGE DOOR OPERATOR (SIZE/ VOLTAGE REMAINS TO BE
DETERMINED). INCLUDE (1) 3/4" C & (1) 1" C IN BASE BID.
RELOCATE HOSE BIB TO NEW LOCATION SHOWN. REPLACE PLASTIC
TUBING WITH SOLDERED COPPER PIPE.
CONNECT (N) WALL MOUNT FIXTURE TO UNSWITCHED HOT LEG
SERVING EGRESS FIXTURES. FINAL HEIGHT TO BE DETERMINED.
ANTICIPATE 30' MOUNTING HEIGHT FOR PRICING PURPOSES. TYP OF 2.
(N) ODA INTAKE LOUVER, BASED ON RUSKIN ELF-6375DX.
(N) EXH LOUVER, BASED ON RUSKING ELF-6375DX.
PROVIDE GFCI WEATHERPROOF RECEPTACLE WITH LOCKABLE COVER.
VERIFY EXACT LOCATION WITH GC.
1
2
3
NO2
CO
NO2
CO
NO2 CO NO2 CO
NO2 CO
NO2 CO NO2 CO
NO2 CO
NO2
CO
NO2
CO
EF
3
12
10
1
4
8
2
10
15
9
5
9
6
7
13
11
12
13
14
15
16
17
L L
L L
L
H
H H
H
H
SUBSCRIPT DESIGNATES THRESHOLD
SETTING FOR SENSOR PAIR (HIGH VS. LOW).
SEE SEQUENCE OF OPERATION.
W3
W3
J J
14
17
EF
1
6
16
16
ODA
65 SF
M
EF
2
18 EXH
4 SF
11
4
4
5
3
18
18
S1 S1 S1 S1 S1 S1
S1 S1 S1 S1 S1 S1
13
EXH
25 SF
EXH
25 SF
M
M
7
WP
WP
WP
8
8
8
L1-15
18
19
19
19
19
19
GFI/ WP
GFI/ WP
GFI/ WP
GFI/ WP
(303)
900-8782 PO Box
3699,
Evergreen, CO 80437
STBENGR.COM
INFO@STBENGR.COM
1295
WESTHAVEN
DRIVE
VAIL, CO 81657
10/17/16
EF01
EF03
EF02
09/12/17