HomeMy WebLinkAboutB16-0401_MEP-1_1483121129.pdfGENERAL 1. IT IS THE INTENTION OF THE SPECIFICATIONS AND DRAWINGS TO PROVIDE FOR COMPLETE AND FULLY OPERATIONAL SYSTEMS TO MEET THE OWNER'S REQUIREMENTS AS DESCRIBED HEREIN AND IN ACCORDANCE WITH ALL APPLICABLE CODES AND AUTHORITIES HAVING JURISDICTION. 2. THESE DRAWINGS AND SPECIFICATIONS ARE NOT A DETAILED SET OF INSTALLATION INSTRUCTIONS BUT RATHER A GUIDELINE TO ESTABLISH QUALITY OF EQUIPMENT AND MATERIALS, LEVEL OF WORKMANSHIP AND PERFORMANCE. DO NOT SCALE DRAWINGS. VERIFY DIMENSIONS WITH SHOP DRAWINGS COORDINATION EFFORT AND IN FIELD PRIOR TO COMMENCEMENT OF WORK. REFER TO ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS. 3. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING AND REVIEWING THE ARCHITECTURAL, STRUCTURAL, CIVIL AND ELECTRICAL DOCUMENTS FOR ANY WORK THAT AFFECTS OR OTHERWISE IMPACTS THE MECHANICAL SCOPE OF WORK. ALL DRAWINGS AND SPECIFICATIONS ARE TO BE READ IN COORDINATION WITH ONE ANOTHER SUCH THAT WORK SHOWN ON ONE SET IS BINDING TO THE OTHER. 4. ALL WORK, MATERIALS AND TRADES SHALL COMPLY WITH THE 2015 INTERNATIONAL BUILDING CODE (IBC) FAMILY, THE 2014 NATIONAL ELECTRIC CODE, ALL LOCAL ORDINANCES AND AMENDMENTS, MOST CURRENT NFPA STANDARDS, AND MANUFACTURER'S INSTALLATION INSTRUCTIONS. THE IBC FAMILY INCLUDES THE BUILDING, MECHANICAL, PLUMBING, FUEL GAS, ENERGY CONSERVATION, AND FIRE CODES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PERFORM WORK IN CONFORMANCE WITH ALL APPLICABLE CODES, ORDINANCES, AND LIFE SAFETY MEASURES AS REQUIRED, BY LOCAL, STATE AND NATIONAL AUTHORITIES. CONTRACTOR SHALL VERIFY WITH ARCHITECT IF MODIFICATION OF WORK IS REQUIRED FOR COMPLIANCE. 5. PRIOR TO SUBMITTING A BID, EACH BIDDER SHALL CAREFULLY EXAMINE THE BIDDING DOCUMENTS. BRING TO THE ATTENTION OF THE ARCHITECT IN WRITING, ANY DISCREPANCIES, AMBIGUITIES, INCONSISTENCIES, OR ERRORS THEREIN THAT ARE DISCOVERED DURING EXAMINATION OF DRAWINGS AND EXISTING EQUIPMENT. FURTHER, ALL BIDDERS SHALL EXAMINE THE SITE, CONDITION AND ALL ASSOCIATED SCOPES OF WORK THAT FALL UNDER THIS CONTRACT AND DETERMINE ALL COSTS FOR THE WORK ARE FULLY COVERED IN THEIR BID SUBMISSION. FAILURE TO REQUEST CLARIFICATION DURING THE BID PERIOD FOR ANY INADEQUACY, OMISSION, OR CONFLICT SHALL NOT RELIEVE CONTRACTOR OF RESPONSIBILITIES. SIGNING OF THE CONTRACT SHALL BE CONSIDERED TO IMPLICITLY DENOTE THAT THE CONTRACTOR HAS A THOROUGH UNDERSTANDING OF THE FULL INTENT AND SCOPE OF THESE CONSTRUCTION CONTRACT DRAWINGS AND SPECIFICATIONS. 6. DURING CONSTRUCTION THE CONTRACTOR SHALL ENSURE THAT ALL MATERIAL AND EQUIPMENT IS NEW (WITH THE EXCEPTION OF USED EQUIPMENT FURNISHED BY OWNER) AND MEETS OR EXCEEDS THE QUALITY AS SET OUT IN THE SPECIFIED EQUIPMENT AND APPLICABLE CODES. THE INSTALLATION OF ALL EQUIPMENT AND MATERIALS SHALL BE OF THE HIGHEST WORKMANSHIP AND QUALITY. ATTENTION TO DETAIL, SAFETY, NEATNESS, ACCESS FOR MAINTENANCE, DURABILITY, ETC. IS EXPECTED AND REQUIRED. 7. ALL EQUIPMENT SHALL BE SET STRAIGHT AND SQUARE WITH THE STRUCTURE. PIPING AND DUCTWORK SHALL BE INSTALLED PARALLEL OR AT RIGHT ANGLES TO ALL WALLS AND STRUCTURAL MEMBERS. HANGER RODS, EQUIPMENT BASES, SUPPORTS AND ISOLATION SHALL BE SET PLUMB AND SQUARE AND IN VERTICAL ALIGNMENT WHERE APPLICABLE. ALL WORK SHALL BE NEAT AND CLEAN UPON COMPLETION. ALL WORK SHALL BE PERFORMED IN A WORKMANLIKE MANNER TO THE SATISFACTION OF THE ARCHITECT, OWNER, AND ENGINEER. 8. THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE BUILDING, STRUCTURE AND THE WORKS OF THE OTHER TRADES INVOLVED. THIS CONTRACTOR SHALL WORK AND COOPERATE WITH THE OTHER TRADES TO ENSURE A QUALITY INSTALLATION, AND MINIMIZE CONFLICTS. 9. THE CONTRACTOR SHALL MAKE NECESSARY REVISIONS, RE-ROUTINGS, ALTERATIONS, CHANGES AND ADDITIONS TO ANY AND ALL WORK AS REQUIRED TO ACCOMMODATE OTHER TRADES SCOPE OF WORKS INCLUDING ARCHITECTURAL, STRUCTURAL AND ELECTRICAL WITHOUT COST TO THE OWNER. 10. UPON COMPLETION OF THE WORK THE CONTRACTOR SHALL FURNISH TO THE OWNER A WRITTEN GUARANTEE STATING THAT THE CONTRACT WARRANTS ALL NEW MATERIAL AND EQUIPMENT AND ALL ASSOCIATED WORK AND COMPONENTS SHALL BE FREE FROM DEFECTS AND/OR FAILURE FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF OWNER ACCEPTANCE AND COMPLETION. ANY AND ALL MATERIALS, EQUIPMENT, WORKMANSHIP AND LABOR FOUND TO BE DEFECTIVE OR THAT FAILS IN ANY WAY IS TO BE REPLACED OR CORRECTED AT NO ADDITIONAL COST TO THE OWNER. CONTRACTOR SHALL WARRANT EXISTING EQUIPMENT FROM TIME OF DELIVERY ON SITE, THROUGH RIGGING AND INSTALLATION, AND ENDING UPON SUCCESSFUL STARTUP AND FUNCTIONAL PERFORMANCE TESTING OF THAT EXISTING EQUIPMENT. OWNER SHALL TAKE OVER WARRANTY OF EXISTING EQUIPMENT UPON CONTRACTOR'S PROOF OF SYSTEM' FUNCTIONAL PERFORMANCE. 11. THE TERM "SUPPLY”, "PROVIDE", "INSTALL", OR “FURNISH” SHALL MEAN TO SUPPLY AND INSTALL ALL NECESSARY LABOR, MATERIALS, TOOLS AND EQUIPMENT AS MAY BE NECESSARY TO INSTALL SAME FOR THE COMPLETE AND FUNCTIONAL OPERATION OF THE MECHANICAL SYSTEMS FOR THIS PROJECT. 12. FURNISH ALL NECESSARY SLEEVES, FLASHINGS, COUNTER-FLASHINGS, INSERTS, ANCHOR BOLTS, EQUIPMENT SUPPORTS, ETC. IN A TIMELY FASHION WHERE REQUIRED TO COMPLETE THE WORK. THIS SHALL INCLUDE ANY AND ALL CAULKING, PATCHING, CUTTING, ETC. AS REQUIRED THROUGH ROOF AND WALL SYSTEMS. 13. DO NOT CUT, CORE, ATTACH TO, OR MODIFY ANY STRUCTURAL OR BUILDING ELEMENTS WITHOUT RECEIVING PRIOR APPROVAL FROM THE ENGINEER OR ARCHITECT INVOLVED. 14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE TRANSPORTATION AND PROTECTION OF ALL EQUIPMENT AND MATERIAL PROVIDED FOR THIS PROJECT UNTIL THE OWNER HAS ACCEPTED THE BUILDING. THIS SHALL INCLUDE STORAGE OF SAME ON SITE AND REMOVAL OF ALL MATERIALS AND REFUSE AS A RESULT. 15. PROVIDE ALL NECESSARY SCAFFOLDING, LADDERS, HOISTS, RIGGING, ETC. AS REQUIRED FOR THE INSTALLATION OF THE WORK WITHIN THIS SCOPE. ALL HOISTING, SUPPORTS, DELIVERY, ETC OF EQUIPMENT AND MATERIAL FOR THIS PROJECT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR. 16. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF THE BUILDING, WORK OF OTHERS, ETC. DURING THE COURSE OF CARRYING OUT THE WORK AS INVOLVED IN THIS CONTRACT. THE CONTRACTOR SHALL MAKE GOOD AND/OR PAY FOR ANY DAMAGES SUSTAINED. THE OWNER RESERVES THE RIGHT TO BACK CHARGE THE CONTRACTOR FOR THE REPAIR AND/OR REPLACEMENT OF ANY DAMAGES. 17. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND PAY FOR ALL NECESSARY FEES OR OTHER COSTS ASSOCIATED WITH CARRYING OUT THE WORK HEREIN. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ANY AND ALL CERTIFICATES AS REQUIRED TO ENSURE THAT THE INSTALLATION IS IN CONFORMANCE WITH, AND HAS BEEN APPROVED BY ALL AUTHORITIES HAVING JURISDICTION. ANY REVISIONS AND/OR CHANGES REQUIRED BY THE AUTHORIZED INSPECTOR SHALL BE DONE WITHOUT CHARGE TO THE OWNER AND SHALL BE DONE SO AS NOT TO AFFECT SCHEDULE OR THE WORK OF OTHERS. ALL PERMITS SHALL BE POSTED IN A CONSPICUOUS PLACE ON SITE. UPON COMPLETION THIS CONTRACTOR SHALL PROVIDE THE OWNER WITH A CERTIFICATE OF FINAL APPROVAL FROM ALL AUTHORITIES INVOLVED IN THE SCOPE OF HIS WORK. 18. IN CARRYING OUT THE WORK, THE CONTRACTOR SHALL UTILIZE TRADESPEOPLE THAT ARE FULLY QUALIFIED, LICENSED, EXPERIENCED AND KNOWLEDGEABLE IN THEIR RESPECTIVE AREAS OF THE CONSTRUCTION INDUSTRY AND SHALL PERFORM WORK IN A RESPONSIBLE MANNER WITH ESTABLISHED CONSTRUCTION PRACTICE. 19. PRIOR TO COMMENCEMENT OF THE WORK, CONTRACTOR SHALL CONCLUSIVELY COORDINATE THE DETAILED INSTALLATION OF THE AND EQUIPMENT WITH ALL CONDUIT, CABLE TRAYS, STRUCTURAL, STRUCTURAL ELEMENTS, AND OTHER WORK OF OTHER TRADES. NO ADDITIONAL COSTS WILL BE CONSIDERED FOR CHANGES AS A RESULT OF INTERFERENCE WITH THE WORK OF OTHERS. THIS INCLUDES ANY ADDITIONAL MATERIAL REQUIRED TO CORRECT MINOR JOB CONFLICTS FOR NORMALLY ACCEPTED PROCEDURES OF ANY AND ALL TRADES. 20. CLEAN ALL EQUIPMENT, MATERIALS, WALLS, CEILINGS, FLOORS, PIPING, DUCTS, ETC. OF A DIRT, OIL, DUST AND PACKAGING MATERIAL AFFECTED DURING THE COURSE OF THIS WORK. DISCONNECT, CLEAN AND RECONNECT WHERE NECESSARY, FOR THE PURPOSE OF LOCATING AND REMOVING OBSTRUCTIONS. 21. REMOVE ALL TOOLS, WASTE MATERIAL, TRASH, AND PACKAGING MATERIALS GENERATED BY THIS WORK FROM THE SITE. UPON COMPLETION ENSURE ALL SURFACES ARE CLEANED OF GREASE, DIRT, ETC. ONCE COMPLETED, THE FACILITY SHALL BE AVAILABLE FOR IMMEDIATE USE. 22. ALL EQUIPMENT AND MATERIAL SPECIFIED AND NOTED ON THE DRAWINGS IS SET AS A MINIMUM STANDARD FOR THE CONTRACTOR TO WORK TO. ALL SUBMITTED TENDERS SHALL BE BASED ON MATERIAL AND EQUIPMENT AS SPECIFIED. EQUIPMENT AND MATERIAL SUPPLIERS OTHER THAN THOSE SPECIFIED ARE TO MAKE A WRITTEN SUBMISSION FOR CONSIDERATION AS AN EQUAL OR ALTERNATE ALONG WITH ANY COST SAVINGS THAT MAY BE REALIZED AS A RESULT OF USING HIS EQUIPMENT. SUBMISSION FOR CONSIDERATION AS AN EQUIVALENT SHALL BE MADE, ALONG WITH TECHNICAL INFORMATION, A MINIMUM OF 5 BUSINESS DAYS BEFORE BID DATE. 23. SHOULD ENGINEER ALLOW CONTRACTOR TO USE EQUIVALENT EQUIPMENT AND MATERIALS FROM AN APPROVED MANUFACTURER OTHER THAN THAT SPECIFICALLY SPECIFIED, IN ACCORDANCE WITH PROCEDURES ABOVE, THE USE OF SAME DOES NOT RELIEVE THE CONTRACTOR FROM CONFIRMING TO OTHER TRADES AFFECTED ALL RELEVANT INFORMATION SUCH AS DIMENSIONS, ELECTRICAL, WEIGHT, ETC. ANY NECESSARY REVISIONS AS A RESULT SHALL BE PAID FOR BY THIS CONTRACTOR. IF THE PROPOSED EQUIPMENT OR NECESSARY MODIFICATIONS ARE NOT TO THE SATISFACTION OF THE ENGINEER THAT THE END RESULT WILL BE THE SAME THE CONTRACTOR SHALL PROVIDE THE SPECIFIED EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER. 24. CONSTRUCTION PHASE SUBMITTALS - CONTRACTOR SHALL SUBMIT ELECTRONIC COPIES OF ALL SHOP DRAWINGS AND PRODUCT DATA FOR EQUIPMENT PROPOSED AND INSTALLATION DETAILS, REROUTINGS, ETC PER THE COORDINATION EFFORT FOR THIS PROJECT TO THE ENGINEER FOR REVIEW PRIOR TO ORDERING MATERIALS OR EQUIPMENT. PRODUCT DATA SHALL STATE CAPACITIES, SIZES, ETC. OF ALL EQUIPMENT AND SHALL BE CERTIFIED. INCLUDE COMPUTER BASED SELECTIONS OF PROJECT SPECIFIC CONDITIONS WHERE APPLICABLE. CLEARLY MARK EACH SHOP DRAWING, CATALOG CUT AND/OR SPECIFICATION SHEET TO INDICATE THOSE PRODUCTS AND FEATURES WHICH ARE INTENDED TO BE FURNISHED. ENGINEER RESERVES THE RIGHT TO REJECT SUBMITTALS THAT ARE INADEQUATELY OR UNCLEARLY MARKED. SPECIFICALLY INDICATE ANY DEVIATIONS FROM THE DESIGN INTENT. ENGINEER RESERVES THE RIGHT TO REQUIRE CORRECTION AT NO EXTRA COST FOR DEVIATIONS NOT SPECIFICALLY INDICATED IN THE SUBMITTAL. REVIEW AND APPROVAL OF SUBMITTALS SHALL NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY TO FURNISH EQUIPMENT AND MATERIALS OF PROPER DIMENSION, SIZE, QUANTITY, QUALITY AND ALL PERFORMANCE CHARACTERISTICS TO EFFICIENTLY PERFORM THE REQUIREMENTS AND INTENT OF THE CONTRACT DOCUMENTS. 25. CLOSEOUT SUBMITTALS - OPERATION AND MAINTENANCE MANUALS: UPON RECEIPT OF REVIEWED SUBMITTALS, CONTRACTOR SHALL IMMEDIATELY COMMENCE COMPILING OPERATIONS AND MAINTENANCE DATA MANUALS (O&M'S). SUBMIT O&M'S FOR REVIEW NO LESS THAN THIRTY (30) CALENDAR DAYS PRIOR TO SUBMITTING NOTICE OF SUBSTANTIAL COMPLETION. O&M'S SHALL CONTAIN AT A MINIMUM: TABLE OF CONTENTS TABBED DIVIDERS INDEX CONSTRUCTION PHASE SUBMITTALS W/ ENGINEER'S REVIEW SYSTEMS DESCRIPTIONS MAINTENANCE TASKS LUBRICATION INFORMATION LIST OF CONTRACTORS EQUIPMENT SUPPLIERS' PARTS LISTS, TROUBLESHOOTING GUIDES, AND MAINTENANCE DATA TESTING/INSPECTION, CERTIFICATES, BALANCING REPORTS IDENTIFICATION DIRECTORY UPON COMPLETION OF REVIEW, SUBMIT TWO (2) COPIES NEATLY BOUND IN 3-RING BINDERS, TABBED, AND LABELED AND (1) ELECTRONIC COPY WITH SIMILAR TABBING AND ORGANIZATION FOR EASE OF NAVIGATION, SIMILAR TO THE HARD COPIES 26. CLOSEOUT SUBMITTALS - AS-BUILTS AND RECORD DRAWINGS: UPON COMPLETION, CONTRACTOR SHALL SUBMIT FOR REVIEW MARKED UP RECORD DRAWINGS INDICATING ALL DIMENSIONS, INVERTS, DISTANCES FROM STRUCTURE, AND ALL DEVIATIONS OF THE AS-BUILT INSTALLATION FROM THE GRAPHICAL REPRESENTATIONS ON THE CONTRACT DOCUMENTS. UPON COMPLETION OF REVIEW, SUBMIT TWO (2) FULL SIZE COPIES, BOUND AND ONE (1) ELECTRONIC COPY. 27. USE OF THE PERMANENT HEATING SYSTEM PRIOR TO COMPLETION OF CONSTRUCTION SHALL NOT BE PERMITTED WITHOUT WRITTEN PERMISSION FROM THE OWNER/ENGINEER. TEMPORARY HEAT SHALL BE PROVIDED BY THE GENERAL CONTRACTOR. ANY EQUIPMENT THAT IS PERMITTED TO BE USED SHALL BE PROFESSIONALLY CLEANED BY SPECIALIST, LUBRICATED AND NEW FILTERS INSTALLED PRIOR TO TURNOVER TO OWNER AT COMPLETION. 28. ELECTRICAL COORDINATION - ALL MOTORS SUPPLIED WITH MECHANICAL EQUIPMENT SHALL BE 1800 RPM MAXIMUM UNLESS OTHERWISE SPECIFIED. VERIFY AVAILABLE VOLTAGE AND PHASE ON SITE AND ACCORDING TO ELECTRICAL DRAWINGS. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR CONFIRMING ANY AND ALL ELECTRICAL INFORMATION AND EQUIPMENT/SYSTEMS COMPATIBILITY PRIOR TO ORDERING ANY EQUIPMENT. THIS CONTRACTOR SHALL BE RESPONSIBLE TO FURNISH ALL NECESSARY STARTERS FOR MECHANICAL EQUIPMENT UNLESS NOTED OTHERWISE. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE TO SET IN PLACE AND WIRE STARTERS PROVIDED BY THIS CONTRACTOR. 29. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE RECEIVING AND INSTALLATION OF ALL OWNER SUPPLIED EQUIPMENT UNLESS NOTED OTHERWISE. THIS SCOPE REQUIRES COORDINATION WITH THE OWNER SUPPLIED EQUIPMENT, AND NOT ALL DETAILS OF THAT EQUIPMENT ARE NECESSARILY INCLUDED IN THESE DRAWINGS. REFER TO ORIGINAL INSTALLATION DRAWINGS, MANUFACTURER'S DRAWINGS, ORIGINAL EQUIPMENT SUBMITTAL DATA SHEETS, AND EQUIPMENT MANUFACTURER'S RESELECTIONS AND REFURBISHMENT GUIDELINES FOR NEW PROJECT ALTITUDE, AND MEET THE REQUIREMENTS DEFINED THEREIN. DUCTWORK, EQUIPMENT AND ACCESSORIES 1. UNLESS NOTED OTHERWISE, DUCTWORK SHALL BE CONSTRUCTED AND SEALED IN CONFORMANCE WITH SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS, LATEST EDITION AND ASHRAE STANDARDS. DUCT CONSTRUCTION PRESSURE CLASS SHALL BE AS FOLLOWS: MEDIUM PRESSURE SUPPLY DUCT, BETWEEN AIR HANDLING UNIT AND SUPPLY TERMINAL BOX INLET: 4 INCH POSITIVE/NEGATIVE. LOW PRESSURE SUPPLY DUCT, DOWNSTREAM OF SUPPLY TERMINAL BOX OUTLET: 2 INCH POSITIVE/NEGATIVE. LOW PRESSURE RETURN AND EXHAUST DUCT: 2 INCH POSITIVE/NEGATIVE. TESTING, STARTUP, ADJUSTING AND BALANCING 1. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TESTING OF ALL EQUIPMENT BOTH NEW AND USED EQUIPMENT FURNISHED BY OWNER, PIPING AND MATERIALS AS NOTED HEREIN AND AS REQUIRED BY LOCAL INSPECTORS AND AUTHORITIES IN ORDER TO ENSURE AND PROVE THAT ALL SYSTEMS AND COMPONENTS ARE INSTALLED AND FUNCTIONING PROPERLY. THE CONTRACTOR SHALL ALLOW IN BID ALL NECESSARY COSTS INCLUDING ADDITIONAL LABOR AND MATERIAL TO DO SO. 2. NOTIFY THE OWNER/ENGINEER PRIOR TO STARTING ANY TESTING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES THAT OCCUR AS A RESULT OF TESTING, AND SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH LIABILITY AND REPAIRS AS NECESSARY. 3. ALL DEFECTS, ETC. SHALL BE REPAIRED OR REPLACED IMMEDIATELY UPON DISCOVERY. LEAKING JOINTS SHALL BE RE-DONE AND COMPLETED IN A TIMELY MANNER. 4. PERFORMANCE TESTS SHALL BE CARRIED OUT UPON COMPLETION OF PRESSURE TESTS AND INSTALLATION. THE CONTRACTOR SHALL MAKE ALL NECESSARY CHANGES AND MODIFICATIONS AS REQUIRED TO DELIVER AN OPERATIONAL SYSTEM. 5. ALL AIR SYSTEMS SHALL BE BALANCED TO WITHIN +/-5% OF VALUES SPECIFIED. AIR BALANCING SHALL BE CARRIED OUT BY AN INDEPENDENT AGENCY SPECIALIZING IN THIS FORM OF WORK AND IN ACCORDANCE WITH GUIDELINES ESTABLISHED BY THE AABC. 6. TO OBTAIN SPECIFIED AIR VOLUMES THIS CONTRACTOR SHALL MAKE ALL NECESSARY BELT AND SHEAVE CHANGES, ADD DAMPERS, VALVES, ETC. AS MAY BE REQUIRED AT NO ADDITIONAL COST TO THE CONTRACT. 7. PREPARE AND SUBMIT ELECTRONIC COPY OF COMPLETED REPORTS FOR ALL AIR HANDLING SYSTEMS AS PER THE NATIONAL GUIDELINES FOR SAME. CONTROLS 1. ALL AUTOMATIC CONTROLS FOR MECHANICAL EQUIPMENT SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR. WHERE AUTOMATIC CONTROLS REQUIRE WIRING OF ANY SYSTEMS OPERATING AT VOLTAGE IN EXCESS OF 30V, MECHANICAL CONTRACTOR SHALL RETAIN A LICENSED AND QUALIFIED ELECTRICAL CONTRACTOR TO PERFORM THE WORK. THE ELECTRICAL SUBCONTRACTOR TO THE MECHANICAL SHALL INSTALL ALL ELECTRICAL LINE VOLTAGE WIRING AND RACEWAY REQUIRED BY THE AUTOMATIC CONTROL SYSTEM. INSTALLATION OF THE ELECTRICAL SUBCONTRACTOR SHALL BE DONE UNDER THE SUPERVISION OF THE MECHANICAL CONTRACTOR. 2. CONTROL WIRING, CONDUIT AND ELECTRICAL DEVICES SHALL COMPLY WITH THE REQUIREMENTS OF THE NEC. ALL CONTROL WIRING SHALL BE COLOR CODED AND TAGGED FOR EASY IDENTIFICATION. ALL LOW-VOLTAGE CONTROL WIRING NOT SUBJECT TO THE NEC SHALL BE INSTALLED IN RACEWAY. 3. IT IS THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO ENSURE THAT ALL CONTROL DEVICES AND CONTROLLED EQUIPMENT ARE INSTALLED CORRECTLY AND FUNCTION PROPERLY, AND THAT ALL MECHANICAL EQUIPMENT OPERATES AS DESIGN AND SPECIFIED, IN CONJUNCTION WITH THE CONTROLS. 4. SUBMIT SHOP DRAWINGS OF WIRING DIAGRAMS AND CONTROL DEVICES FOR ENGINEER'S REVIEW. MAINTAIN AS-BUILT RECORD COPY OF WIRING DIAGRAMS DURING CONSTRUCTION AND INCORPORATE ALL FIELD CHANGES INTO A COMPREHENSIVE CONTROLS WIRING DIAGRAM FOR INCLUSION WITH THE O&M'S AT PROJECT CLOSEOUT. MECHANICAL SYSTEMS SPECIFICATION SUPPLY FANS TAG SF-1 SF-2 SF-3 DESCRIPTION GARAGE SUPPLY FAN GARAGE SUPPLY FAN GARAGE SUPPLY FAN FUNCTION GARAGE VENTILATION SEE SF-1 SEE SF-1 LOCATION ROOF SEE SF-1 SEE SF-1 DRIVE BELT SEE SF-1 SEE SF-1 AIR FLOW (CFM) 5500 SEE SF-1 SEE SF-1 EFFECTIVE PLUME HT @ S.L. (IN WC) 0.50 SEE SF-1 SEE SF-1 @ ALT (IN WC) 0.39 SEE SF-1 SEE SF-1 TYPE AXIAL/ PROPELLER SEE SF-1 SEE SF-1 CLASS SEE SF-1 SEE SF-1 SPEED (RPM) 687 / 1373 SEE SF-1 SEE SF-1 NAMEPLATE HP 2 SEE SF-1 SEE SF-1 BRAKE HP 0.9 SEE SF-1 SEE SF-1 VOLTAGE / PH 208/3 SEE SF-1 SEE SF-1 EM POWER SEE SF-1 SEE SF-1 STARTER SEE SF-1 SEE SF-1 MAX SONES (NC) 41 SEE SF-1 SEE SF-1 WEIGHT (LBS) 575 SEE SF-1 SEE SF-1 BASED ON: COOK MODEL # COOK 24HXSM8B SEE SF-1 SEE SF-1 REMARKS: A, B SEE SF-1 SEE SF-1 ACCESSORIES: C, D SEE SF-1 SEE SF-1 NOTES: GENERAL NOTES, FEATURES AND ACCESSORIES: A. BASIS OF DESIGN (BOD) MAKES & MODELS NOTED ABOVE DEFINE PHYSICAL SIZES, CHARACTERISTICS, MANUFACTURING DETAILS AND OTHER FEATURES NOT NECESSARILY SCHEDULED ABOVE BUT LIKELY COMTEMPLATED DURING THE DESIGN PROCESS. ALTERNATIVE MANUFACTURERS AVAILABLE TO BIDDERS: GREENHECK. BIDDERS SHALL BE RESPONSIBLE TO VERIFY EQUIVALENCY OF ALTERNATIVES TO THE BOD IF USING ALTERNATIVE IN THEIR BID. ENGINEER WILL NOT REVIEW ALTERNATIVES FOR EQUIVALENCY DURING THE BID PHASE. B. PROJECT IS AT ALTITUDE. GARAGE SPACE WILL BE UNCONDITIONED, FAN MOTOR SELECTIONS ARE AT 0F OUTSIDE AIR. C. REGREASABLE CAST PILLOW BLOCK BEARINGS, DUAL DRIVES WITH 2.0 DRIVE SERVICE FACTOR, SPRING VIBRATION ISOLATION. OPEN DRIP PROOF MOTOR WITH NEMA 3R DISCONNECT. D. ACCESSORIES: ROOF CURB, VERIFY IN FIELD EXISTING ROOF SLOPE. MOTORIZED SHUT-OFF DAMPER, ALUMINUM INSECT INSERT, LIFTING LUGS, EXTENDED LUBE LINES, ANTICONDENSATE COAT, SPARE BELT SET, BELT TENSIONER. E. RE: MEP-4 FOR FAN INSTALLATION DETAIL. EXHAUST FANS TAG EF-1 EF-2 EF-3 DESCRIPTION GARAGE EXHAUST FAN SEE EF-1 SEE EF-1 FUNCTION GARAGE VENTILATION SEE EF-1 SEE EF-1 LOCATION ROOF SEE EF-1 SEE EF-1 DRIVE BELT SEE EF-1 SEE EF-1 AIR FLOW (CFM) 5500 SEE EF-1 SEE EF-1 EFFECTIVE PLUME HT @ S.L. (IN WC) 0.50 SEE EF-1 SEE EF-1 @ ALT (IN WC) 0.39 SEE EF-1 SEE EF-1 TYPE AXIAL/ PROPELLER SEE EF-1 SEE EF-1 CLASS SEE EF-1 SEE EF-1 SPEED (RPM) 691 / 1382 SEE EF-1 SEE EF-1 NAMEPLATE HP 2 SEE EF-1 SEE EF-1 BRAKE HP 0.9 SEE EF-1 SEE EF-1 VOLTAGE / PH 208/3 SEE EF-1 SEE EF-1 EM POWER SEE EF-1 SEE EF-1 STARTER SEE EF-1 SEE EF-1 MAX SONES (NC) 30 SEE EF-1 SEE EF-1 WEIGHT (LBS) 538 SEE EF-1 SEE EF-1 BASED ON: COOK MODEL # COOK 24HXEM8B SEE EF-1 SEE EF-1 REMARKS: A, B SEE EF-1 SEE EF-1 ACCESSORIES: C, D SEE EF-1 SEE EF-1 NOTES: SEE EF-1 SEE EF-1 GENERAL NOTES, FEATURES AND ACCESSORIES: A. BASIS OF DESIGN (BOD) MAKES & MODELS NOTED ABOVE DEFINE PHYSICAL SIZES, CHARACTERISTICS, MANUFACTURING DETAILS AND OTHER FEATURES NOT NECESSARILY SCHEDULED ABOVE BUT LIKELY COMTEMPLATED DURING THE DESIGN PROCESS. ALTERNATIVE MANUFACTURERS AVAILABLE TO BIDDERS: GREENHECK. BIDDERS SHALL BE RESPONSIBLE TO VERIFY EQUIVALENCY OF ALTERNATIVES TO THE BOD IF USING ALTERNATIVE IN THEIR BID. ENGINEER WILL NOT REVIEW ALTERNATIVES FOR EQUIVALENCY DURING THE BID PHASE. B. PROJECT IS AT ALTITUDE. GARAGE SPACE WILL BE UNCONDITIONED, FAN MOTOR SELECTIONS ARE AT 0F OUTSIDE AIR. C. REGREASABLE CAST PILLOW BLOCK BEARINGS, DUAL DRIVES WITH 2.0 DRIVE SERVICE FACTOR, SPRING VIBRATION ISOLATION. OPEN DRIP PROOF MOTOR WITH NEMA 3R DISCONNECT. D. ACCESSORIES: ROOF CURB, VERIFY IN FIELD EXISTING ROOF SLOPE. MOTORIZED SHUT-OFF DAMPER, ALUMINUM INSECT INSERT, LIFTING LUGS, EXTENDED LUBE LINES, ANTICONDENSATE COAT, SPARE BELT SET, BELT TENSIONER. E. RE: MEP-4 FOR FAN INSTALLATION DETAIL. MEP SHEET INDEX ISSUE LOG LEGEND ISSUE LOG DISCONTINUED  INCLUDED IN SET ISSUANCE  NOT INCLUDED IN SET ISSUANCE ISSUED WITHOUT CHANGES O SHEET NUMBER SHEET TITLE MEP-1 MEP COVER SHEET  MEP-2 PARKING LEVEL - NEW WORK  MEP-3 ELECTRICAL SCHEDULES AND SCHEMATICS  MEP-4 MECHANICAL DETAILS AND CONTROLS  1. THE EXISTING ROOF ACCESS DOES NOT COMPLY WITH CURRENT CODES. PRIOR TO IMPLEMENTATION OF ANY OF THE MEP WORK REQUIRING ACCESS TO ROOF INCLUDING PRE-TAB EXERCISES, A NEW ROOF ACCESS SYSTEM MUST BE DEVELOPED INCLUDING FIXED LADDERS, CATWALKS, RAILINGS AND SERVICE PLATFORMS TO THE SATISFACTION OF THE AUTHORITY HAVING JURISDICTION (TOWN OF VAIL BUILDING DEPARTMENT). THE MEP SUBCONTRACTORS SHALL NOT BE EXPECTED TO COMMENCE WORK INCLUDED IN THIS CONTRACT WITHOUT APPROPRIATE AND SAFE ACCESS TO THE AREAS AND EQUIPMENT WHERE WORK IS REQUIRED. 2. a. EXISTING FANS PRE-TAB SCOPE - PROCURE THE SERVICES OF A TEST, ADJUST AND BALANCE (TAB) CONTRACTOR TO PERFORM PRE-TEST OF THE SIX (6) TOTAL EXISTING ROOF MOUNTED FANS. MEASURE CFM, MOTOR AMPERAGE FOR EACH WINDING, AND VOLTAGE, RECORD NAMEPLATE MOTOR HORSEPOWER, AND INDICATE WHETHER UNIT IS A SUPPLY FAN OR EXHAUST UNIT FOR EACH. DETERMINE WHETHER THE EXISTING UNITS ARE PROVIDED WITH MOTORIZED SHUT-OFF DAMPER BENEATH EACH FAN AND IF SO, DETERMINE WHETHER DAMPER IS FUNCTIONAL. GENERATE PRE-TAB REPORT AND SUBMIT TO ENGINEER FOR REVIEW. IN THE EVENT ALL EXISTING FANS ARE EXHAUST UNITS AND HAVE THE REQUIRED CAPACITY (16,500 CFM IN TOTAL), OWNER WILL BE PRESENTED WITH CHOICE TO KEEP EXISTING FANS AND INTRODUCE NEW INTAKE AIR LOUVER ON THE EAST WALL. SUCH LOUVER (OR LOUVERS) SHALL HAVE TOTAL FACE AREA OF 65 SF WITH DRAINABLE BLADES, BIRD SCREEN AND MOTORIZED SHUT-OFF DAMPER. b. FAN REPLACEMENT - IN THE EVENT THE EXISTING FANS DO NOT HAVE THE REQUIRED CAPACITY, THE SIX (6) EXISTING FANS SHALL BE REPLACED WITH THREE (3) EXHAUST FANS AND (3) SUPPLY FANS. ALL SIX FANS SHALL BE EQUIPPED WITH TWO SPEED MOTOR AND SUPPLIED WITH 2-SPEED MOTOR STARTER. c. CONTROLS - 2015 IMC REQUIRES BOTH CARBON MONOXIDE (CO) AND NITROGEN DIOXIDE (NO2) SENSORS. COVERAGE STUDIES HAVE BEEN PERFORMED USING MACURCO DEVICES AS BASIS OF DESIGN. A TOTAL OF TEN (10) SENSORS OF EACH TYPE ARE REQUIRED BASED ON THIS EXERCISE. SUCCESSFUL CONTROLS VENDOR SHALL PROVIDE SHOP DRAWING SHOWING PROPOSED GAS DETECTOR COVERAGE IF DIFFERENT FROM BASIS OF DESIGN. 3. PROJECT CONSTITUTES INCREASED LOAD FOR MECHANICAL EQUIPMENT, GARAGE DOOR OPERATOR AND DRY SPRINKLER SYSTEM AIR COMPRESSOR. LIGHTING UPGRADE IS DEEMED TO REPRESENT A LOAD REDUCTION TO THE LIGHTING PANELS. THOUGH OVERALL SYSTEM ADDITIONAL LOAD AT THE EXISTING MAIN DISTRIBUTION CENTER IS DEEMED NEGLIGIBLE, ADDITIONAL LOAD ON PANEL 'HP2' IS NOT NEGLIGIBLE. THE EXISTING LOADS ON THE ELECTRICAL SYSTEM AT THIS POINT ARE NOT KNOWN AND CANNOT BE CONFIDENTLY VERIFIED WITH NEC CALCULATION. 30-DAY METERING IN ACCORDANCE WITH NEC SHALL BE REQUIRED. INSTALL LOAD RECORDING METER IMMEDIATELY UPON AWARD OF CONTRACT. DOWNLOAD DATA AFTER 7 DAYS OF RECORDING AND IMMEDIATELY SUBMIT TO ENGINEER TO REVIEW FOR INITIAL VERIFICATION OF SYSTEM SUITABILITY FOR CURRENTLY DEPICTED DESIGN. 4. THE EXISTING LIGHTING SYSTEM CONSISTS OF A TOTAL OF SEVENTY NINE (79) OPEN CAGED FLUORESCENT UPLIGHTS, THIRTY FIVE (35) OF WHICH ARE ROUGHLY 4FT LONG WHILE THE REMAINING FORTY FOUR (44) FIXTURES ARE APPROXIMATELY 8FT LONG. SCOPE INCLUDES REPLACEMENT OF ALL FIXTURES WITH SEVENTY NINE (79) NEW VAPOR TIGHT LED FIXTURES. TWO (2) NEW 4FT FIXTURES WILL REPLACE EACH OF THE 8FT FIXTURES. INCLUDE J-BOX AND WIRING REQUIRED TO FEED THE TWO NEW FIXTURES FROM THE EXISTING SINGLE FIXTURES PROVISION. THIRTY TWO (32) OF THE NEW FIXTURES SHALL INCLUDE INTEGRAL BATTERY PACK. PROVIDE UN-SWITCHED HOT CONDUCTOR TO ALL FIXTURES WITH BATTER PACK TO ALLOW CHARGING OF BATTERY AS WELL AS TO SIGNAL POWER LOSS. ANY NEW CABLING REQUIRED SHALL BE IN EMT AND PAINTED TO COLOR AS SPECIFIED BY ARCHITECT. SEE LUMINAIRE SCHEDULE FOR ADDITIONAL INFORMATION. GENERAL SCOPE OVERVIEW NOTES: 1. FIRE SPRINKLER SCOPE - THE EXISTING COVERAGE SPACING IS BASED ON LIGHT HAZARD OCCUPANCY AND NOT SUITED FOR RE-USE WITHOUT SIGNIFICANT MODIFICATION TO ACHIEVE COVERAGE, SPACING AND DENSITY REQUIREMENTS OF CHANGE IN USE TO MOTOR VEHICLE PARKING. SCOPE INCLUDES COMPLETE REMOVAL OF EXISTING SYSTEMS AND REPLACEMENT WITH COMPLETELY NEW DRY SYSTEM WITH SPACING/DENSITY COVERAGE FOR ORDINARY HAZARD GROUP I CLASSIFICATION. DRY VALVE ASSEMBLY AND AIR COMPRESSOR SHALL BE LOCATED IN CONDITIONED SPACE. HEAT TRACING OF DRY VALVE ASSEMBLY SHALL NOT BE PERMITTED. SEE DELEGATED DESIGN NOTES FOR FURTHER INFORMATION. 2. FIRE PROTECTION SYSTEM PIPING SHALL BE HYDRAULICALLY CALCULATED, SIZED, AND BID USING SCHEDULE 40 CUT-GROOVED, THREADED, OR WELDED PIPE. REDUCED PIPE SIZES SUCH AS SCHEDULE 30 WITH ANTIMICROBIAL COATING FOR EQUIVALENT CORROSION RESISTANCE RATING SHALL NOT BE PERMITTED IN THE BASE BID. 3. PERFORM NEW SITE FIRE FLOW TEST IF EXISTING DATA AVAILABLE FROM THE AHJ OR THE WATER UTILITY PROVIDER IS OLDER THAN SIX (6) MONTHS. ASSUME THAT THE FLOW TEST DATA IS OLDER THAN SIX MONTHS. INCLUDE COST TO PARTICIPATE IN AND OBSERVE THE FLOW TEST PROCEDURE. FLOW TEST SHALL BE PERFORMED PRIOR TO THE DESIGN AND HYDRAULIC CALCULATIONS. TEST DATA ALONG WITH HYDRAULIC CALCULATIONS SHALL BE INCLUDED IN THE SUBMITTAL OF SPRINKLER SHOP DRAWINGS TO THE FIRE MARSHALL HAVING JURISDICTION. 4. PIPE SCHEDULE DESIGN METHODS ARE NOT PERMITTED. HYDRAULIC CALCULATIONS MUST BE PERFORMED TO ALL APPLICABLE NFPA SPECIFICATIONS AND SUBMITTED TO THE ARCHITECT/ ENGINEER FOR APPROVAL AS PART OF THE SHOP DRAWING PROCEDURE. 5. PROVIDE DRAWINGS AND CALCULATIONS WITH SEAL OF LICENSED FIRE PROTECTION ENGINEER OR NICET III LEVEL TECHNICIAN FOR SUBMITTAL TO FIRE MARSHALL AND TOWN OF VAIL PRIOR TO INSTALLATION. 6. DESIGN PARAMETERS: OCCUPANCY CLASSIFICATIONS - ORDINARY HAZARD, GROUP I. DENSITY: ORDINARY HAZARD - 0.15 GPM / SF COVERAGE: ORDINARY HAZARD - 130 SF / SPRINKLER (15' MAXIMUM ALLOWABLE SPACING; HOWEVER, BASIS OF DESIGN PIPING SHALL BE 10' X 12' MAXIMUM). FIRE PROTECTION DELEGATED DESIGN NOTES: 1. COORDINATE EXACT LOCATION AND ELECTRICAL CONNECTION REQUIREMENTS OF EACH PIECE OF MECHANICAL EQUIPMENT WITH MECHANICAL CONTRACTOR PRIOR TO ROUGH-IN. 2. SEAL PENETRATIONS OF FIRE RATED ASSEMBLIES WITH U/L APPROVED MATERIALS AND METHODS TO MAINTAIN FIRE RATING. 3. PROVIDE DEDICATED NEUTRAL CONDUCTORS FOR ALL BRANCH CIRCUITS. 4. ROUTE ALL LOW-VOLTAGE CABLING NOT IN CONDUIT VIA ARLINGTON LOOPS OR J-HOOKS SUSPENDED FROM STRUCTURE. CABLING SHALL NOT RUN UNSUPPORTED FOR LENGTHS GREATER THAN 5'-0". PROVIDE SEPARATE PATHWAYS FOR COMMUNICATIONS, ACCESS CONTROL AND FIRE ALARM CABLING. 5. ALL INFRASTRUCTURE SUPPORTING VOICE/DATA STRUCTURED CABLING SYSTEM SHALL MEET BICSI STANDARDS. 6. FIRE ALARM DEVICES ARE INDICATED AS A DESIGN BUILD INTENT AND PERFORMANCE SPECIFICATION FOR DESIGN/BUILD CONTRACTOR. 7. ALL NEW FIRE ALARM DEVICES SHALL BE CONNECTED TO THE EXISTING FIRE ALARM SYSTEM. 8. ACCESS CONTROL DOOR AND ACTUATED DOOR HARDWARE SHALL BE SPECIFIED BY OTHERS. COORDINATE ALL ACCESS CONTROL DEVICES WITH ARCHITECTURAL DOOR SCHEDULES AND SPECIFICATIONS. 9. ALL NEW CIRCUITS SHALL BE ROUTED IN EMT PATHWAY. GENERAL POWER SCOPE NOTES: (303) 900-8782 PO Box 3699, Evergreen, CO 80437 STBENGR.COM INFO@STBENGR.COM 1295 WESTHAVEN DRIVE VAIL, CO 81657 12/30/16