Loading...
HomeMy WebLinkAboutB16-0031_B016-0031 (07-06-17) Structural Steel Completion Letter signed_1499793897.pdf Fl - ti K mAR 5020 County Road 154 tiGlenwood Springs,CO 81801 Geotechnical Engineering I Engineering Geology Phone:(970)945-7988 Materials Testing I Environmental Fax:(970)945-8454 Email: hpkglenwood@kumarusa.com Office Locations: Parker,Glenwood Springs,and Silverthorne,Colorado July 6, 2017 Art Reimers c/o Berglund Architects Attn: Keegan Winkeller P.O. Box 2378 Vail, Colorado 81658 keegan@berglundarchitects.com Project No. 16-7-465 Subject: Structural Steel Completion Letter,Reimers Residence, 3090 Booth Creek Drive, Lot 8, Block 3, Vail Village 11th Filing, Vail, Colorado Gentlemen: As requested by Jon Stevenson with Shaeffer-Hyde Construction, we are providing a summary of structural steel inspections performed for the above referenced project. The reports of the services requested and performed for the project are attached. Hepworth-Pawlak Geotechnical (now H-P/Kumar) previously conducted a subsoil study for design of foundations at the site and presented the findings in a report dated June 30, 2015,Job No. 115 240A. The structural steel inspections were performed by West Slope Testing & Inspection, LLC on April 5, and May 10 & 15, 2017 and state "To the best of my (Doug Young) knowledge this completes the special inspections of the structural steel onsite welding & high strength A325 bolting, as outlined in reports#1 &#2 for the project." Based on the attached reports, the referenced construction has achieved the specified conditions. If you have any questions or need further assistance, please call our office. Sincerely, H-Pk KUMAR c/ . Gy�p'r� v"" . / 4, Steven L. Pawlak, P.E : 1 z 2 2'2 1.1 SLP/kac 1 ,-' vA L qW "ra,,?` 9t£•0.ttiC) Attachments: West Slope Testing Inspection Reports#1 and#2 cc: Shaeffer-Hyde Construction—Jon Stevenson (jons@shaefferhyde.com) West Slope Testing& Inspection LLC Report#1 3177 Glendam Dr. Grand Junction, CO 81504 Page 1 of 1 Phone: 970-434-6988 Cell: 970-260-2844 Inspection Report Date: 4-5-17 Client: H-P Kumar (Project #16-7-465) Project: Reimers Residence Address: 3090 Booth Creek Rd. Vail, CO Building Permit No: B16-0031 General Contractor: Shaeffer Hyde Construction Inspection of shop fabrication or field work at job site: Field Report: Visually inspected field welding & high strength A325 bolting at steel beam & column connections, field welded stiffener plates, and tube steel stairway connections. Above inspections were performed as best as possible with wood framing, sheathing, foam roof insulation, and mechanical ducting installed to date. The field welding & high strength A325 bolting inspected above appeared to be in general conformance with the construction documents, and the quality requirements of the AWS D1.1 Structural Welding Code & the AISC/RCSC Specification for A325/A490 bolting except as noted below. 1) 1/4" steel plate washers were installed over holes that were apparently slotted and/or oversized with a torch for bolt alignment at connection plates/angles for • channel steel & W beam connections bridge/stairway area upper floor framing grid line 5 & at approximately 7.4. Verify with structural engineer if plate washers needed welded or if they are acceptable as is. Douglas E.Young Ce i kation 5102224 ctara Weldi g Specia/a eto Inspector/Technician: Douglas r Young tr teel Solon. , is uspector ay-applied Fireproofing , •c al Inspector Douglas E Young CW! 96070131 QC1 EXP.7/1/2017 West Slope Testing& Inspection LLC Report#2 3177 Glendam Dr. Grand Junction, CO 81504 Page 1 of 1 Phone: 970-434-6988 Cell: 970-260-2844 Final Inspection Report Dates:.5-10-17 & 5-15-17 Client: H-P Kumar(Project#16-7-465) Project: Reimers Residence Address: 3090 Booth Creek Rd. Vail, CO Building Permit No: B 16-0031 General Contractor: Shaeffer Hyde Construction Inspection of shop fabrication or field work at job site: Field Report: Visually inspected field welding at steel washer plates at connections noted in the previous report#1 & at column bases for front entryway canopy. Also inspected high strength A325 bolting at steel beam& column connections for front entryway canopy. The field welding& high strength A325 bolting inspected above appeared to be in substantial conformance with the construction documents, and the quality requirements of the AWS D1.1 Structural Welding Code& the AISC/RCSC Specification for high strength bolting. To the best of my knowledge this completes the special inspections of the structural steel onsite welding& high strength A325 bolting, as outlined in reports ' #1 & #2 for the project. Douglas E.Young Certification 102224 etu l Weld g Special i / . . Inspector/Technician: Douglas E Young uctu Steel Boltin. S "ia! nspector ra -a ied Fireproofing S,'4I .1 inspector Douglas E Young 1 CWI 96070131 OCI EXP.711/2017