Baskervill, Inc.
Project: DoubleTree, Vail, CO Conversion Guestrooms and Public Spaces Renovation
CCD No.: 06
Revision No.: 10
Project No.: 2.160036.0
Date: September 18, 2017
T001 TITLE SHEET
List of drawings changed to reflect CCD-06, Revision 10, 09-15-2017
A010 ROOM SCHEDULE AND MATRIX
Reference Plan 5A, 5B, and 5C -
Revised number of hearing impaired rooms
Hearing Impaired Scope of Work -
Revised number of hearing impaired rooms
A020 PARTITION TYPES, DETAILS, AND STANDARDS
Schedule – Partition Types -
Added partition type B6E
Standards – Partition Type Designation Diagrams -
Added partition designation B
A030 DOOR, FRAME AND HARDWARE TYPES AND SCHEDULES
Schedule Door -
Added door 103A, 103B, 109F, and 151B to schedule
Schedule Window -
Added window W1 and W2
Window Elevations -
Added window W1 and W2
Details -
Added details 5B, 4B, 3B, and 2B
A050 FINISHES
Legend – Finish Schedule -
Added paint color specifications & fitness center floor and wall finish specifications
A111 OVERALL PLAN – 1ST FLOOR
Plan 6A -
Revised ski & boot storage layout
Added vestibule at lounge exit room 143
Added kitchen room 151 and dishwashing room 106
Page 2
J:\The Widewaters Group\2.160036.0 - TWG-DoubleTree Vail, CO Conversion\Record\170901 CCD-006\170918 CCD 06 Narrative.docx
Revised made market layout
A121 REFLECTED CEILING PLAN – 1ST FLOOR PLAN
Plan 6A -
Revised ski & boot storage ceiling layout and dimensions
Added ceiling at lounge exit vestibule room 143
Revised ceiling at ballroom room 104
Added ceiling at kitchen room 151 and dishwashing room 106
A131 1ST FLOOR – FINISH PLAN
Plan 6A -
Revised finishes in fitness center
Added finishes to secondary vestibule
Added finishes to revised ski & boot storage room
A301 EXTERIOR ELEVATIONS – CONSTRUCTION
Improvements – South Elevation 6C -
Added enclosed vestibule at south entrance
A302 EXTERIOR ELEVATIONS – CONSTRUCTION
Improvements – East Elevation Part A 6A -
Revised ski storage elevation
Improvements – East Elevation Part B 3C -
Revised ski storage elevation
A401A ENLARGED FLOOR PLAN – LOBBY/LOUNGE/BAR
Enlarged Floor Plan 6A -
Revised ski & boot storage layout and dimensions
Added lounge exit vestibule room 143
Revised kitchen floor plan room 151, dishwashing room 106 and made market room 105
A401B ENLARGED FURNITURE PLAN – LOBBY/LOUNGE/BAR
Enlarged Furniture Plan 4A -
Added furniture tag EQU-402
A401C ENLARGED REFLECTED CEILING PLAN – LOBBY/LOUNGE/BAR
Enlarged Reflected Ceiling Plan 4A -
Revised ski & boot storage ceiling layout and dimensions to reflect plan changes
Added gyp board ceiling at lounge exit vestibule room 143
A401D INTERIOR ELEVATIONS – LOBBY/LOUNGE/BAR
Elevation - Lobby 3E -
Added t.v. power/cable locations and dimensions
A405 ENLARGED PLANS – BALLROOM
Enlarged Reflected Ceiling Plan - Ballroom -
Revised ceiling layout
Elevation – Ballroom 6D and 6E -
Revised ceiling cove
Page 3
J:\The Widewaters Group\2.160036.0 - TWG-DoubleTree Vail, CO Conversion\Record\170901 CCD-006\170918 CCD 06 Narrative.docx
A406 ENLARGED PLANS – FITNESS, GUEST LAUNDRY AND MADE MARKET
Elevations 3D, 3E, 5E, 6E -
Added finish tags, wall mirror locations, and dimensions
Enlarged Floor Plan 5A-
Revised made market layout
Enlarged Reflected Ceiling Plan 5B-
Revised made market ceiling layout
Elevation 5B– Made Market
Revised casework to reflect plan changes
A451a ENLARGED GUESTROOM PLANS – DKL LOFT (ROOM 436)
Elevation 6B -
Added wall infill at existing door location
A451b ENLARGED GUESTROOM PLANS – DKL LOFT (ROOM 536)
Demolition Plan 2A -
Revised existing door to demo and added demo area for new door location
Construction Plan 4A -
Revised door and stair location in loft space
A504 PORTE COCHERE – ADDITIONAL DETAILS
Porter Cochere Section –
Revised Slope and Ski Storage Addition 6A
Revised ski storage section
Ski Storage Elevation 6E, 5E, and 4E -
Revised elevations
Detail – Roof Section @ Precast 3E -
Added section
Vestibule Elevation 2E, and 1E -
Added elevations
A602 MILLWORK - MADE MARKET
Deleted section 2A
Added plan detail – made market – ordering counter 6E
Section 4A, 5A, and 6A –
Revised casework details
Elevation 5C and 6C –
Revised casework elevations per plan changes
A605 MILLWORK - FRONT DESK
Plan 2A –
Added indication of metal panel
Section 3A, 5A, 6A, and 6B –
Revised countertop material and metal/glass panel connection
Perspective 5B –
Added metal panels to front desk perspective
Elevation 2C and 5C –
Added metal panels to front desk casework
Page 4
J:\The Widewaters Group\2.160036.0 - TWG-DoubleTree Vail, CO Conversion\Record\170901 CCD-006\170918 CCD 06 Narrative.docx
A606 MILLWORK - LOBBY BAR
Plan 3A –
Added indication of metal panel
Section 5A and 5B –
Revised countertop material and metal/glass panel connection
Elevation 3B –
Added metal panels to bar casework
Detail – Cabinet Pull – 6B -
Revised countertop material
A607 MILLWORK - LOBBY BAR
Section 5A and 5B –
Revised countertop material
D111 DEMOLITION PLAN – 1st FLOOR
Demo Plan 6A –
Added demolition of ski & boot storage wall, wall between made market and kitchen,
Added demolition of exterior wall finishes at lounge exit vestibule and decking
D121 DEMOLITION PLAN – 1st FLOOR REFELCTED CEILING PLAN
Demo Plan 6A –
Added demolition of ski & boot storage roof
D201 DEMOLITION PLAN – 1st FLOOR REFELCTED CEILING PLAN
East Elevation – Proposed Demolition 6A –
Added demolition of ski storage roof and structure
East Elevation Porte Cochere – Proposed Demolition 3C –
Added demolition of ski storage roof and structure
G001 BUILDING & CODE SUMMARY
Building Occupancy –
Added ski and boot storage area to count
Plumbing Fixtures –
Added ski and boot storage area to count
Renovated Occupant Load –
Added ski and boot storage area to count
G002 LIFE SAFETY LEGEND & LIFE SAFETY PLAN – 1ST FLOOR
Life Safety Plan – First Floor 6A –
Revised exit paths and exit lighting for ski and boot storage, exit vestibule, and kitchen
S001 GENERAL NOTES
Added sheet
S002 QUALITY ASSURANCE
Added sheet
S101 PLAN VIEWS
Added sheet
Page 5
J:\The Widewaters Group\2.160036.0 - TWG-DoubleTree Vail, CO Conversion\Record\170901 CCD-006\170918 CCD 06 Narrative.docx
S301 FLOOR DETAILS
Added sheet
S601 ROOF DETAILS
Added sheet
S602 ROOF DETAILS
Added sheet
K100 OVERALL FOOD SERVICE EQUIPMENT LAYOUT
Added sheet
K102 ENLARGED KITCHEN FOOD SERVICE EQUIPMENT PLAN
Added sheet
K202 ENLARGED KITCHEN PLUMBING ROUGH IN PLAN
Added sheet
K250 KITCHEN EQUIPMENT SCHEDULE
Added sheet
K302 ENLARGED KITCHEN ELECTRICAL ROUGH IN PLAN
Added sheet
M001 LEGEND, DETAILS & SCHEDULES
Equipment Schedules –
Added EWH-2 to the Electric Wall Heater Schedule
Added S-5 and R-3 to the Air Distribution Device Schedule
Moved the Fan Schedule to Sheet M002
M002 DETAILS & SCHEDULES
Equipment Schedules –
Added Packaged Rooftop Schedule to sheet M002
Moved the Fan Schedule to Sheet M002 from M001
Details –
Added Kitchen Exhaust Duct Detail
M101 1ST FLOOR DEMOLITION
Demolition Plan - First Floor -
Added note and drawing to demolish existing PTAC from 111 Ski and Boot Storage area.
M102 2ND FLOOR DEMOLITION
Demolition Plan – 2nd Floor -
Added note and drawing for demolishing existing makeup air unit and utility set kitchen
exhaust fan.
M201 FIRST FLOOR DUCTWORK PLAN
First Floor Equipment and Ductwork Plan 6A -
Page 6
J:\The Widewaters Group\2.160036.0 - TWG-DoubleTree Vail, CO Conversion\Record\170901 CCD-006\170918 CCD 06 Narrative.docx
Added note for PTAC to heat and cool 111 Ski and Boot Storage area.
Added EWH-2 to heat 143 Vestibule
Added callout symbol for kitchen area
Added transfer duct from public space to kitchen
Relocated EF-7 and EF-8 ductwork
Changed airflow to 109 Retail (this supply air was redirected from 106 Dishwashing,
since that space is no longer supplied by RTU-1)
M202 FIRST FLOOR LOBBY, BATHROOM, AND 2ND FLOOR DUCTWORK PLAN
Second Floor Equipment and Ductwork Plan 2A –
Relocated EF-7 and EF-8
Added EF-9, KEF-1, MAU-1, RTU-A1
Added miscellaneous notes
M203 KITCHEN DUCTWORK PLAN
1st Floor Kitchen Plan 4A –
Added new drawing and notes
Kitchen Exhaust Duct Section 3D-
Added new drawing and notes
Added kitchen air balance chart
M701 CONTROLS
Added sequence of operations for new equipment
Made clarity edits to the sequence of operation for the Variable Air Volume Air Handler
Unit
E001 LEGEND, SPECS, LIGHTING FIXTURE SCHEDULE
Lighting fixture schedule -
Added wall mounted fixture type C6.
E101 FIRST FLOOR DEMOLITION PLAN
First Floor Demolition Plan 6A -
Added notes for the removal of thru-wall mechanical unit, lighting and switching.
E111 FIRST FLOOR LIGHTING PLAN
First Floor Lighting Plan 6A -
Added surface mounted lighting, occupancy / vacancy switching and notes for ski storage
area.
E121 FIRST FLOOR POWER PLAN
First Floor Power Plan 6A -
Added receptacle power for thru-wall mechanical unit and connection point for ice melt
heat tape. Added new 150A panel ‘LLG’ in pool equipment room and notes to provide
new matching AIC breaker in existing switchgear space.
Added card readers and electric strikes at doors 103A and 103B
E131 FIRST FLOOR MECHANICAL PLAN
First Floor Mechanical Plan 6A -
Page 7
J:\The Widewaters Group\2.160036.0 - TWG-DoubleTree Vail, CO Conversion\Record\170901 CCD-006\170918 CCD 06 Narrative.docx
Added note for power to recessed ceiling mount heater in new vestibule. Added power
for new electric heating unit at existing exit / egress door / vestibule.
E141 FIRST FLOOR FIRE ALARM PLAN
First Floor Fire Alarm Plan 6A -
Added pull station and horn / strobe at new vestibule doorway.
E401a ENLARGED FLOOR PLAN – LOBBY/LOUNGE/BAR LIGHTING
Enlarged Floor Plan – Lobby/Lounge/Bar 4A -
Added recessed and exit/ egress lighting to new vestibule
P101 1ST FLOOR - DEMOLITION
1st Floor – Demolition 6A -
Added demolition of existing sanitary and removal and cap of existing roof vent
P111 1ST FLOOR –NEW WORK
1st Floor – New Work 6A -
Added note 22.68; grease interceptor furnished, location, and connections to be
determined by owner
P403 ENLARGED KITCHEN PLANS
1st Floor – New Work 6A -
Revised supply locations per new kitchen layout
S001 GENERAL NOTES
Revised sheet
S002 QUALITY ASSURANCE
Revised sheet
S101 PLAN VIEWS
Revised sheet
S301 FLOOR DETAILS
Added sheet
S601 ROOF DETAILS
Added sheet
S602 ROOF DETAILS
Added sheet