Loading...
HomeMy WebLinkAboutB16-0254_170918 CCD 06 Narrative_1505852700.pdf Baskervill, Inc. Project: DoubleTree, Vail, CO Conversion Guestrooms and Public Spaces Renovation CCD No.: 06 Revision No.: 10 Project No.: 2.160036.0 Date: September 18, 2017 T001 TITLE SHEET List of drawings changed to reflect CCD-06, Revision 10, 09-15-2017 A010 ROOM SCHEDULE AND MATRIX Reference Plan 5A, 5B, and 5C - Revised number of hearing impaired rooms Hearing Impaired Scope of Work - Revised number of hearing impaired rooms A020 PARTITION TYPES, DETAILS, AND STANDARDS Schedule – Partition Types - Added partition type B6E Standards – Partition Type Designation Diagrams - Added partition designation B A030 DOOR, FRAME AND HARDWARE TYPES AND SCHEDULES Schedule Door - Added door 103A, 103B, 109F, and 151B to schedule Schedule Window - Added window W1 and W2 Window Elevations - Added window W1 and W2 Details - Added details 5B, 4B, 3B, and 2B A050 FINISHES Legend – Finish Schedule - Added paint color specifications & fitness center floor and wall finish specifications A111 OVERALL PLAN – 1ST FLOOR Plan 6A - Revised ski & boot storage layout Added vestibule at lounge exit room 143 Added kitchen room 151 and dishwashing room 106 Page 2 J:\The Widewaters Group\2.160036.0 - TWG-DoubleTree Vail, CO Conversion\Record\170901 CCD-006\170918 CCD 06 Narrative.docx Revised made market layout A121 REFLECTED CEILING PLAN – 1ST FLOOR PLAN Plan 6A - Revised ski & boot storage ceiling layout and dimensions Added ceiling at lounge exit vestibule room 143 Revised ceiling at ballroom room 104 Added ceiling at kitchen room 151 and dishwashing room 106 A131 1ST FLOOR – FINISH PLAN Plan 6A - Revised finishes in fitness center Added finishes to secondary vestibule Added finishes to revised ski & boot storage room A301 EXTERIOR ELEVATIONS – CONSTRUCTION Improvements – South Elevation 6C - Added enclosed vestibule at south entrance A302 EXTERIOR ELEVATIONS – CONSTRUCTION Improvements – East Elevation Part A 6A - Revised ski storage elevation Improvements – East Elevation Part B 3C - Revised ski storage elevation A401A ENLARGED FLOOR PLAN – LOBBY/LOUNGE/BAR Enlarged Floor Plan 6A - Revised ski & boot storage layout and dimensions Added lounge exit vestibule room 143 Revised kitchen floor plan room 151, dishwashing room 106 and made market room 105 A401B ENLARGED FURNITURE PLAN – LOBBY/LOUNGE/BAR Enlarged Furniture Plan 4A - Added furniture tag EQU-402 A401C ENLARGED REFLECTED CEILING PLAN – LOBBY/LOUNGE/BAR Enlarged Reflected Ceiling Plan 4A - Revised ski & boot storage ceiling layout and dimensions to reflect plan changes Added gyp board ceiling at lounge exit vestibule room 143 A401D INTERIOR ELEVATIONS – LOBBY/LOUNGE/BAR Elevation - Lobby 3E - Added t.v. power/cable locations and dimensions A405 ENLARGED PLANS – BALLROOM Enlarged Reflected Ceiling Plan - Ballroom - Revised ceiling layout Elevation – Ballroom 6D and 6E - Revised ceiling cove Page 3 J:\The Widewaters Group\2.160036.0 - TWG-DoubleTree Vail, CO Conversion\Record\170901 CCD-006\170918 CCD 06 Narrative.docx A406 ENLARGED PLANS – FITNESS, GUEST LAUNDRY AND MADE MARKET Elevations 3D, 3E, 5E, 6E - Added finish tags, wall mirror locations, and dimensions Enlarged Floor Plan 5A- Revised made market layout Enlarged Reflected Ceiling Plan 5B- Revised made market ceiling layout Elevation 5B– Made Market Revised casework to reflect plan changes A451a ENLARGED GUESTROOM PLANS – DKL LOFT (ROOM 436) Elevation 6B - Added wall infill at existing door location A451b ENLARGED GUESTROOM PLANS – DKL LOFT (ROOM 536) Demolition Plan 2A - Revised existing door to demo and added demo area for new door location Construction Plan 4A - Revised door and stair location in loft space A504 PORTE COCHERE – ADDITIONAL DETAILS Porter Cochere Section – Revised Slope and Ski Storage Addition 6A Revised ski storage section Ski Storage Elevation 6E, 5E, and 4E - Revised elevations Detail – Roof Section @ Precast 3E - Added section Vestibule Elevation 2E, and 1E - Added elevations A602 MILLWORK - MADE MARKET Deleted section 2A Added plan detail – made market – ordering counter 6E Section 4A, 5A, and 6A – Revised casework details Elevation 5C and 6C – Revised casework elevations per plan changes A605 MILLWORK - FRONT DESK Plan 2A – Added indication of metal panel Section 3A, 5A, 6A, and 6B – Revised countertop material and metal/glass panel connection Perspective 5B – Added metal panels to front desk perspective Elevation 2C and 5C – Added metal panels to front desk casework Page 4 J:\The Widewaters Group\2.160036.0 - TWG-DoubleTree Vail, CO Conversion\Record\170901 CCD-006\170918 CCD 06 Narrative.docx A606 MILLWORK - LOBBY BAR Plan 3A – Added indication of metal panel Section 5A and 5B – Revised countertop material and metal/glass panel connection Elevation 3B – Added metal panels to bar casework Detail – Cabinet Pull – 6B - Revised countertop material A607 MILLWORK - LOBBY BAR Section 5A and 5B – Revised countertop material D111 DEMOLITION PLAN – 1st FLOOR Demo Plan 6A – Added demolition of ski & boot storage wall, wall between made market and kitchen, Added demolition of exterior wall finishes at lounge exit vestibule and decking D121 DEMOLITION PLAN – 1st FLOOR REFELCTED CEILING PLAN Demo Plan 6A – Added demolition of ski & boot storage roof D201 DEMOLITION PLAN – 1st FLOOR REFELCTED CEILING PLAN East Elevation – Proposed Demolition 6A – Added demolition of ski storage roof and structure East Elevation Porte Cochere – Proposed Demolition 3C – Added demolition of ski storage roof and structure G001 BUILDING & CODE SUMMARY Building Occupancy – Added ski and boot storage area to count Plumbing Fixtures – Added ski and boot storage area to count Renovated Occupant Load – Added ski and boot storage area to count G002 LIFE SAFETY LEGEND & LIFE SAFETY PLAN – 1ST FLOOR Life Safety Plan – First Floor 6A – Revised exit paths and exit lighting for ski and boot storage, exit vestibule, and kitchen S001 GENERAL NOTES Added sheet S002 QUALITY ASSURANCE Added sheet S101 PLAN VIEWS Added sheet Page 5 J:\The Widewaters Group\2.160036.0 - TWG-DoubleTree Vail, CO Conversion\Record\170901 CCD-006\170918 CCD 06 Narrative.docx S301 FLOOR DETAILS Added sheet S601 ROOF DETAILS Added sheet S602 ROOF DETAILS Added sheet K100 OVERALL FOOD SERVICE EQUIPMENT LAYOUT Added sheet K102 ENLARGED KITCHEN FOOD SERVICE EQUIPMENT PLAN Added sheet K202 ENLARGED KITCHEN PLUMBING ROUGH IN PLAN Added sheet K250 KITCHEN EQUIPMENT SCHEDULE Added sheet K302 ENLARGED KITCHEN ELECTRICAL ROUGH IN PLAN Added sheet M001 LEGEND, DETAILS & SCHEDULES Equipment Schedules – Added EWH-2 to the Electric Wall Heater Schedule Added S-5 and R-3 to the Air Distribution Device Schedule Moved the Fan Schedule to Sheet M002 M002 DETAILS & SCHEDULES Equipment Schedules – Added Packaged Rooftop Schedule to sheet M002 Moved the Fan Schedule to Sheet M002 from M001 Details – Added Kitchen Exhaust Duct Detail M101 1ST FLOOR DEMOLITION Demolition Plan - First Floor - Added note and drawing to demolish existing PTAC from 111 Ski and Boot Storage area. M102 2ND FLOOR DEMOLITION Demolition Plan – 2nd Floor - Added note and drawing for demolishing existing makeup air unit and utility set kitchen exhaust fan. M201 FIRST FLOOR DUCTWORK PLAN First Floor Equipment and Ductwork Plan 6A - Page 6 J:\The Widewaters Group\2.160036.0 - TWG-DoubleTree Vail, CO Conversion\Record\170901 CCD-006\170918 CCD 06 Narrative.docx Added note for PTAC to heat and cool 111 Ski and Boot Storage area. Added EWH-2 to heat 143 Vestibule Added callout symbol for kitchen area Added transfer duct from public space to kitchen Relocated EF-7 and EF-8 ductwork Changed airflow to 109 Retail (this supply air was redirected from 106 Dishwashing, since that space is no longer supplied by RTU-1) M202 FIRST FLOOR LOBBY, BATHROOM, AND 2ND FLOOR DUCTWORK PLAN Second Floor Equipment and Ductwork Plan 2A – Relocated EF-7 and EF-8 Added EF-9, KEF-1, MAU-1, RTU-A1 Added miscellaneous notes M203 KITCHEN DUCTWORK PLAN 1st Floor Kitchen Plan 4A – Added new drawing and notes Kitchen Exhaust Duct Section 3D- Added new drawing and notes Added kitchen air balance chart M701 CONTROLS Added sequence of operations for new equipment Made clarity edits to the sequence of operation for the Variable Air Volume Air Handler Unit E001 LEGEND, SPECS, LIGHTING FIXTURE SCHEDULE Lighting fixture schedule - Added wall mounted fixture type C6. E101 FIRST FLOOR DEMOLITION PLAN First Floor Demolition Plan 6A - Added notes for the removal of thru-wall mechanical unit, lighting and switching. E111 FIRST FLOOR LIGHTING PLAN First Floor Lighting Plan 6A - Added surface mounted lighting, occupancy / vacancy switching and notes for ski storage area. E121 FIRST FLOOR POWER PLAN First Floor Power Plan 6A - Added receptacle power for thru-wall mechanical unit and connection point for ice melt heat tape. Added new 150A panel ‘LLG’ in pool equipment room and notes to provide new matching AIC breaker in existing switchgear space. Added card readers and electric strikes at doors 103A and 103B E131 FIRST FLOOR MECHANICAL PLAN First Floor Mechanical Plan 6A - Page 7 J:\The Widewaters Group\2.160036.0 - TWG-DoubleTree Vail, CO Conversion\Record\170901 CCD-006\170918 CCD 06 Narrative.docx Added note for power to recessed ceiling mount heater in new vestibule. Added power for new electric heating unit at existing exit / egress door / vestibule. E141 FIRST FLOOR FIRE ALARM PLAN First Floor Fire Alarm Plan 6A - Added pull station and horn / strobe at new vestibule doorway. E401a ENLARGED FLOOR PLAN – LOBBY/LOUNGE/BAR LIGHTING Enlarged Floor Plan – Lobby/Lounge/Bar 4A - Added recessed and exit/ egress lighting to new vestibule P101 1ST FLOOR - DEMOLITION 1st Floor – Demolition 6A - Added demolition of existing sanitary and removal and cap of existing roof vent P111 1ST FLOOR –NEW WORK 1st Floor – New Work 6A - Added note 22.68; grease interceptor furnished, location, and connections to be determined by owner P403 ENLARGED KITCHEN PLANS 1st Floor – New Work 6A - Revised supply locations per new kitchen layout S001 GENERAL NOTES Revised sheet S002 QUALITY ASSURANCE Revised sheet S101 PLAN VIEWS Revised sheet S301 FLOOR DETAILS Added sheet S601 ROOF DETAILS Added sheet S602 ROOF DETAILS Added sheet