Loading...
HomeMy WebLinkAboutB16-0254_P600_signed_1507144320.pdfFLD-01 FLD-01 PF-12 PF-12 FLD-01 FLD-01 PF-12 PF-12 FLD-01 FLD-01 FLD-01 FLD-01 4" SAN 2" SAN 2" SAN 3" SAN 2" V 2" V 2" V 2" V PF-10 PF-11 PF-11 PF-11 PF-8,9 PF-8,9 PF-11 PF-11 PF-11 PF-10 PF-8,9 2" VENT UP TO 2ND FLOOR WCO 3" VTR 3" V 4" SAN 2" V 4" GW 4" SAN 3" SAN 4" SAN 4" SAN 2" SAN 4" SAN 4" SAN FSK-01 FSK-01 FSK-01 FSK-01 FSK-01 2" SAN 2" V 2" V 2" V 2" V 2" V 2" V 2" SAN PF-11 PF-11 PF-11 PF-11 PF-11 PF-11 PF-11 PF-11 PF-10 PF-10 PF-10 PF-8,9 PF-8,9 PF-8,9 PF-8,9 PF-8,9 PF-8,9 PF-8,9 PF-8,9 FSK-01 4" SAN FLD-01 FLD-01 AAV FCO FLD-01 FLD-01 2" SAN 2" V WCO 3" SAN GAS METER 5345 MBH BOILER 2 1810 MBH BOILER 1 1810 MBH GUEST FIREPLACE 30 MBH NEW GAS FIREPLACE REPLACING EXISTING 65 MBH RTU-1 120 MBH RTU-2 200 MBH RTU-3 120 MBH RTU-4 120 MBH GUEST FIREPLACE 30 MBH GUEST FIREPLACE 30 MBH GUEST FIREPLACE 30 MBH GUEST FIREPLACE 30 MBH GUEST FIREPLACE 30 MBH GUEST FIREPLACE 30 MBH GUEST FIREPLACE 30 MBH GUEST FIREPLACE 30 MBH GUEST FIREPLACE 30 MBH GUEST FIREPLACE 30 MBH GUEST FIREPLACE 30 MBH GUEST FIREPLACE 30 MBH GUEST FIREPLACE 30 MBH GUEST FIREPLACE 30 MBH GUEST FIREPLACE 30 MBH GUEST FIREPLACE 30 MBH GUEST FIREPLACE 30 MBH GUEST FIREPLACE 30 MBH NEW GAS FIREPLACE 65 MBH AC-1 200 MBH AC-2 200 MBH 3/4" 3/4" 9' 10' NEW GAS FIRE TABLE 65 MBH 3/4" 72' 11' 15' KITCHEN & MAU-1 1389.6 MBH (SEE RISER CONTINUATION ON DRAWING P403) 1 A 2 3 4 5 6 A B C D E 1 3 4 5 6 2 COPYRIGHT 2016 BASKERVILL. USE OF THIS WORK IN WHOLE OR IN PART IS FORBIDDEN WITHOUT EXPRESSED WRITTEN CONSENT. B C D E DRAWING NO. P.O. BOX 400, RICHMOND, VA 23218-0400 DRAWING TITLE ISSUE PROJECT OWNER ® 9/19/2017 5:06:50 AM RISER DIAGRAMS THE WIDEWATERS GROUP 2.160036.0 DOUBLETREE VAIL, CO CONVERSION GUESTROOMS & PUBLIC SPACES RENOVATION 08/25/16 - CONSTRUCTION DOCUMENTS P600 2211 N FRONTAGE RD, VAIL, COLORADO 81657 NOT TO SCALE 6APOOL AND EMPLOYEE RESTROOM WASTE AND VENT RISER DIAGRAM NOT TO SCALE 4APUBLIC RESTROOM, GUEST LAUNDRY, AND BAR WASTE AND VENT RISER DAGRAM NOT TO SCALE 4CGAS RISER DIAGRAM 1 8/25/2016 FOR CONSTRUCTION SET 10 9/15/17 CCD-06 09/07/2017 201709/0 10/04/17