HomeMy WebLinkAboutB17-0027_A-100_1496780460.pdf02 OF 22
ISSUE DATE
UNIT 9203
FOUR SEASONS
RESORT & RESIDENCES
VAIL, CO
VK
CHK BY:
SCALE:
SHEET:
JOB #:
DRW BY:
TITLE:
DATE:
COMMENT
AS NOTED
VK
UNIT 9203
REMODEL
SEAL & SIGNATURE:
CLIENT:
Tim & Nancy Buese
Unit 9203
FOUR SEASONS VAIL
1 Vail Road
VAIL, CO 81657
ARCHITECT:
Creative Design Associates
434 BROADWAY, 5TH FLOOR
NEW YORK, NY 10013
t. 212-748-8900
WESTERN US
4700 E BROMLEY LN, SUITE 105
BRIGHTON, CO 80601
t. 646-747-2171
c. 917-756-0057
dsorenson@ralcompanies.com
INTERIOR DESIGN:
Duet Design Group, LLC
901 ACOMA SUITE 200
DENVER, CO 80204
t. 303-783-9327
miranda@duetdesigngroup.com
MECH/PLUMBING ENGINEER:
Rader Engineering
PO BOX 8610
AVON, CO 80620
t. 970-845-7910
BryanH@raderengineering.com
ELECTRICAL ENGINEER:
C3S Incorporated
3212 WEST 45TH AVENUE
DENVER, CO 80211
t. 303-480-5144
theresa@c3sengineeringinc.com
LIGHTING DESIGN:
186 Lighting Design Group, Inc.
1200 BANNOCK STREET
DENVER, CO 80204
t. 303-534-5350
gmackell@186group.com
KITCHEN DESIGN:
exquisite kitchen design
601 SOUTH BROADWAY SUITE F
DENVER, CO 80209
303-282-0382
mikalo@myekdesign.com
16-27
FOR PERMIT
5/5/2017
2/22/17
1
FOR CONSTRUCTION
5/5/17
PROJECT ADDRESS:
UNIT 9203
1 VAIL ROAD
VAIL, CO 81657
UNIT 9203
A-201
1
SCALE: 1" = 20'-0"
1 NINTH FLOOR OVERALL PLAN
GENERAL NOTES:
1. ALL WORK SHALL BE DONE IN STRICT CONFORMANCE WITH APPLICABLE LOCAL
AND NATIONAL CODES
2. CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING AND PAYING FOR ALL
NECESSARY PERMITS, FEES, AND INSPECTIONS
3. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE SAFETY
AND PROPERTY SECURITY DURING CONSTRUCTION
4. IF CONDITIONS ARE ENCOUNTERED OTHER THAN THOSE SHOWN ON THE
DRAWINGS OR OTHER THAN WOULD BE REASONABLY ANTICIPATED, NO DESIGN
ALTERATIONS SHALL BE COMMENCED WITHOUT APPROVAL OF ARCHITECT OR
OWNER
5. ALL WORK SHALL BE FULLY CONNECTED, WIRED, AND READY FOR OPERATION
6. ALL WORK SHALL BE PLUMB, LEVEL, MECHANICALLY SECURE, ELECTRICALLY
SAFE, AND PRESENT A NEAT AND FINISHED APPEARANCE
7. AT CLOSE-OUT OF PROJECT ALL WORK SHALL BE TOTALLY CLEANED INCLUDING,
BUT NOT LIMITED TO: ALL SURFACES OF GLASS, CARPETS VACUUMED, MIRRORS
CLEANED, MILLWORK DUSTED AND WIPED, CAULKING BEADS TRIMMED, PAINT
AND STAIN CUTS STRAIGHTENED
8. SUBSTITUTIONS OF PRODUCTS OTHER THAN THOSE SPECIFIED MAY BE MADE IF
APPROVED BY ARCHITECT OR OWNER
9. ALL PRODUCTS SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S
INSTALLATION RECOMMENDATIONS
10. DO NOT SCALE DRAWINGS
FIRE SPRINKLER NOTE:
FIRE SPRINKLER CHANGES SHALL BE DESIGNED BY THE FIRE SPRINKLER
CONTRACTOR (ALL STATE FIRE PROTECTION) AND SUBMITTED BY DEFERRED
SUBMITTAL IN ACCORDANCE WITH ALL TOWN OF VAIL FIRE DEPARTMENT AND
BUILDING DEPARTMENT REQUIREMENTS .
FIRE ALARM NOTE:
FIRE ALARM DEVICES WILL BE REINSTALLED IN THE SAME GENERAL LOCATION AS
THEY EXIST TODAY. AS NOTED ON THE DRAWINGS, SMOKE DETECTORS WILL BE
CHANGED OUT WITH HEAT DETECTORS DURING CONSTRUCTION. CONTRACTOR
SHALL UTILIZE THE BUILDING OPERATOR'S PREFERRED FIRE ALARM CONTRACTOR TO
MAKE THE REQUIRED CHANGES TO THE FIRE ALARM PANEL PRIOR TO CONSTRUCTION
STARTING AND AT COMPLETION OF CONSTRUCTION.
SHEET INDEX:
GENERAL:
G-000 COVER SHEET
ARCHITECTURAL:
A-100 NOTES/CODE ANALYSIS/LOCATION PLAN
A-200 DEMO FLOOR PLAN
A-201 FLOOR PLAN
A-300 DEMO REFLECTED CEILING PLAN
A-301 REFLECTED CEILING PLAN
A-400 DEMO POWER & COMMUNICATIONS PLAN
A-401 POWER & COMMUNICATIONS PLAN
A-500 DOOR SCHEDULE & DETAILS
MECHANICAL:
M-000 MECHANICAL COVER SHEET
M-100 MECHANICAL SCHEDULES
M-209D MECHANICAL PLAN (DEMO)
M-209 MECHANICAL PLAN (PROPOSED)
P-209D PIPING PLAN (DEMO)
P-209 PIPING PLAN (PROPOSED)
M-300 MECHANICAL SCHEMATICS
M-400 MECHANICAL SPECIFICATIONS &
SEQUENCE OF OPERATIONS
ELECTRICAL:
E-100 ELECTRICAL DEMO, ONE LINE & PANELS
E-200 POWER PLAN
E-300 LIGHTING PLAN
LIGHTING:
L-000 LEGENDS & NOTES
L-100 LIGHTING PLAN
CODE ANALYSIS:
ORIGINAL BUILDING WAS CONSTRUCTED UNDER THE 2003 IBC
CURRENT APPLICABLE BUILDING CODE IS THE 2015 IBC
BUILDING CONSTRUCTION CLASSIFICATION: 1B FIRE RESISTIVE
FIRE PROTECTION / LIFE SAFETY FEATURES:
1. AUTOMATIC SPRINKLER SYSTEM
2. STANDPIPE SYSTEM
3. FIRE DETECTION AND ALARM SYSTEM
4. EMERGENCY COMMUNICATION AND ALARM SYSTEM
5. EMERGENCY POWER SYSTEM
PROJECT AREA:
TOTAL PROJECT AREA INCLUDES APPROX. 2,880 S.F.
OTHERWISE KNOWN AS CONDO 10 OR UNIT 9203
THE UNIT IS CLASSIFIED R-2
THE UNIT OVERALL AREA IS NOT CHANGED
THE EGRESS REQUIREMENTS OF THE UNIT ARE NOT CHANGED
A-100
SHEET INDEX, NOTES,
CODE ANALYSIS &
LOCATION PLAN
06/06/17