HomeMy WebLinkAboutB17-0032 Special Inspection report.pdfFINAL REPORT OF SPECIAL INSPECTIONS Pr~ect: Lionsquare Lodge Tract A Project Location: 6 6 0 Lionshead Rd. Owner Lionsquare Lodge Permit Numb Address 660 Lionshead Road City: Vail Zip: _8_1_6_5_8 __ _ Special Inspections Agency -Desi§R Pr=offissier-iat ln-Ghafge;: GROUND Engineering Consul tan ts, Inc. Address: PO Box 4 6 4 City: Gypsum Fax: (970) 524-0721 State: _c_o ____ Zip: 816 3 7 Phone: ( 9 7 O) s 2 4 -O 7 2 O E-mail: chris. hutto@groundeng.com carl.henderson@groundeng.com To the best of my information, knowledge, and belief, the special inspections and/or testing required for this project, have been completed in accordance with the contract documents. Interim reports submitted prior to this Final Report of Special Inspections form a basis for, and are to be considered an integral part of this final report. Any discrepancies that were noted in all interim reports have been corrected. *Micropiles Only -See Report 17-6529.micropile.17024-25.CL.16.ALL* Prepared by: Carl Henderson, P.E. 5-11-2017 Date Preparer's Seal and Signature Required -12- llRDUND ENGINEERING Client: Jeff Armistead 10th Mountain Builders, LLC PO Box 955 Minturn, CO 81645 Lionsquare Lodge Tract A -Micropiles Micropile Log Excavation Date: April 25, 2017 Installation Contractor: Venter Companies Installation Equipment: Furukawa HCR9-GS drill rig GROUND Pile Number 16 Plan Pile Number: N/A Structure I Pile Location: 7/W EXCAVATION INFORMATION Diameter. 4 in. Start Time 3:05 pm Finish Time: 3:15 pm Job Number: 17-6529 GROUND Pile Number: Plan Pile Number: Structure I Pile Location EXCAVATION INFORMATION Diameter: in. Start Time: Finish Time: Measurements Spec1f1cations Measurements Specifications Existing Ground Elevation: 8100.3 Total Depth of Excavation: 11 Overburden Depth: N/A Top of Bedrock Elevation: N/A Depth in Bedrock: NIA Bottom of Pile Elevation 8089.3 Top of Pile Elevation 8101.13 Total Pile Lengtti: 11.83 Type I Diameter of Casing: N/A Casing Elevation. Top: N/A Casing Elewition. Bottom: N/A Deviation from Center: 0 Plumbness of Excavation: Ok Cleanliness of Excavation: N/A Description of Soil: Cobble Groundwater Conditions: Unknown Location of Obstructions: N/A ft. ft. ft. ft. ft. ft. ft ft. ft. ft. N/A N/A N/A N/A N/A N/A N/A ft.( min.) ft.( min.) ft. ft. tt.(min.) max. max. Existing Ground Elevation: Total Depth of Excavation Overburden Depth Top of Bedrock Elevation· Depth in Bedrock Bottom of Pile Elevation: Top of Pile Elevation Total Pile Length: Type I Diameter of Casing· Casing Elevation, Top: Casing Elevation. Bottom· Deviation from Center Plumbness of Excavation Cleanliness of Excavation: Description of Soil: Groundwater Conditions: Location of Obstructions: ft. ft. ft. ft. ft. ft. ft ft. ft. ft. ft.(min.) ft.(min.) ft. ft ft.( min.) max. max. REINFORCING STEEL INFORMATION REINFORCING STEEL INFORMATION Vertical Reinforcement: Total Length: Splice Lengths Clearance Method: N/A Placed 15 ft 15 ft 10 ft GROUT INFORMATION Date of Placement: Start Time: End Time: Water Deptt1 at Time of Placement: Theoretical Grout Volume. Estimated Volume Placed: Placement Method: Grout while drilling Comments: Field Technician Chris Leeper Specifications N/A N/A N/A 4/25/17 3:05 pm 3:15 pm N/A 1 N/A Ill. cu. cu. ft ft. Placed Vertical Reinforcement: Total Length. Splice Lengths: Clearance Method. GROUT INFORMATION Date of Placement: Start Time End Time: Water Depth at Time of Placement. Theoretical Grout Volume: Estimated Volume Placed: Placement Method: Comments. www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum Specifications in. cu. ft. cu. ft. llRDUND ENGINEERING Client: Jeff Armistead 10th Mountain Builders, LLC PO Box 955 Minturn, CO 81645 Lionsquare Lodge Tract A -Micropiles Micropile Log Excavation Date: April 25, 2017 Installation Contractor: Venter Companies Installation Equipment: Furukawa HCR9-GS drill rig GROUND Pile Number 14 Plan Pile Number NIA Structure I Pile Location: 6/W EXCAVATION INFORMATION Diameter. 4 in. Start Time 2:13 pm Firnsh Time: 2:29 pm Measurements Existing Ground Elevation: 8097.1 ft. Total Depth of Excavation: 12 ft. Overburden Depth: NIA ft. Top of Bedrock Elevation: NIA ft. Depth in Bedrock: NIA ft. Bottom of Pile Elevation: 8085.1 ft. Top of Pile Elevation: 8097.93 ft. Total Pile Length: 12.83 ft. Type I Diameter of Casing: NIA Casing Elevation. Top: NIA ft. Casing Elevation, Bottorn: NIA ft. Deviation from Center: 0 Plumbness of Excavation: Ok Cleanliness of Excavation: NIA Description of Soil: Cobble Groundwater Conditions: Unknown Location of Obstructions: NIA Specifications NIA NIA NIA N/A N/A NIA N/A f\(min) ft.( min.) ft ft. ft.(m1n.) max. niax. REINFORCING STEEL INFORMATION Vertical Reinforcement: Total Length Splice Lengths. Clearance Method NIA Placed 15 ft 15 ft 10 ft GROUT INFORMATION Date of Placement: Start Time: End Time: Water Depth at Time of Placement: Theoretical Grout Volume Estimated Volume Placed Placement Method: Grout while drilling Comments: Field Technician Chris Leeper Specifications NIA NIA NIA 4/25/17 2:13 pm 2:29 pm NIA Hl. 1.1 cu. NIA cu. ft. ft. Job Number: 17-6529 GROUND Pile f\Jumber: 15 Structure I Pile Location: 8/W Plan Pile Number: NIA EXCAVATION INFORMATION Diameter 4 111. Start Time 2:45 pm Finist1 Time: 2:56 pm Measurements Existing Ground Elevation: 8100.3 ft. Total Depth of Excavation 11.7 ft. Overburden Depth NIA ft. Top of Bedrock Elevation· NIA ft. Depth in Bedrock· NIA ft. Bottom of Pile Elevation: 8088.6 ft. Top ot Pile Elevation 8101.13 ft. Total Pile Length: 12.53 ft. Type I Diameter of Casing NIA Casing Elevation. Top: NIA ft Casing Elevation, Bottorn N/A ft. Deviation from Center: 0 Plumbness of Excavation: Ok Cleanliness of Excavation: NIA Description of Soil: Cobble c;roundwater Conditions· Unknown Location of Obstructions: NIA Spec1ficat1ons NIA N/A NIA N/A NIA N/A NIA ft.(min.) f!.(min.) ft. ft. ft.( min.) max max. REINFORCING STEEL INFORMATION Vertical Remforcement. Total Length: Splice Lengths: Clearance Method: NIA Placed 15 ft 15 ft 10 ft GROUT INFORMATION Date of Placement: Start Time: End Time: Water Depth at Time of Placement: Theoretical Grout Volume: Estimated Volume Placed: Placement Method: Grout while drilling Comments· Specifications N/A NIA NIA 4/25117 2:45 pm 2:56 pm N/A 1.1 NIA in. cu. cu. ft ft. www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum llRDUND ENGINEERING Client: Jeff Armistead 10th Mountain Builders, LLC PO Box 955 Minturn, CO 81645 Lionsquare Lodge Tract A· Micropiles Micropile Log Excavation Date: April 25, 2017 Installation Contractor: Venter Companies Installation Equipment: Furukawa HCR9-GS drill rig GROUND Pile Number: 12 Plan Pile Number NIA Structure I Pile Location: 81E EXCAVATION INFORMATION Diameter: 4 in. Start Time: 12:43 pm Finish Time: 1:15 pm Measurements Existing Ground Elevation: 8100.3 ft Total Depth of Excavation: 12.7 ft. Overburden Depth: NIA IL Top of Bedrock Elevation: NIA ft. Depth in Bedrock: N/A ft. Bottom of Pile Elevation: 8088 ft. Top of Pile Elevation: 8101.13 ft. Total Pile Length: 13.53 ft. Type I Diameter of Casing: N/A Casing Elevation. Top: NIA ft. C<ising Elevation, Bottom· NIA ft. Deviation from Center: 0 Plumbness of Excavation: Ok Cleanliness of Excavation: NIA Description of Soil: Cobble Groundwater Conditions: Unknown Location of Obstructions: NIA Specifications NIA NIA NIA NIA NIA NIA NIA ft.(min.) ft.(min) ft. ft. ft.(min.) max. max. REINFORCING STEEL INFORMATION Vertical Reinforcement: Total Length. Splice Lengths Clearance Method. N/A Placed 15 ft 15 ft 10 ft GROUT INFORMATION Date of Placement: Start Time: End Time: Water Depth at Time of Placement: Theoretical Grout Volume: Estimated Volume Placed: Placement Method: Grout while drilling Comments: Field Technician: Chris Leeper Specifications NIA NIA NIA 4/25/17 12.43 pm 1:15 pm NIA 1.2 NIA in. cu. cu. ft. ft. Job Number: 17-6529 GROUND Pile Number: 13 Structure I Pile Location: 71E Plan Pile Number: NIA EXCAVATION INFORMATION Diameter: 4 in. Start Time: 1 :33 pm Finish Time: 1 :57 pm Measurements Existing Ground Elevation: 8100.3 ft. Total Depth of Excavation 11.5 ft. Overburden Depth: N/A ft. Top of Bedrock Elevation· N/A ft. Depth in Bedrock N/A ft. Bottom of Pile Elevation: 8088.8 ft. Top of F'ile Elevation: 8101.13 ft. Total F'ile Length: 12.33 fl. Type ! Diameter of Casing: NIA Casing Elevation. Top: NIA ft. Casing Elevation. Bottom NIA ft. Deviation from Center· 0 Plumbness of Excavation: Ok Cleanliness of Excavation: NIA Description of Soil: Cobble Groundwater Conditions: Unknown Location of Obstructions: NIA Specifications NIA NIA NIA NIA NIA NIA NIA ft.(m1n.) ft.(min.) ft ft. ft.(min.) max. max. REINFORCING STEEL INFORMATION Vertical Reinforcement: Total Length: Srlice Lenqths: Clearance Method: NIA Placed 15 ft 15 ft 10 ft GROUT INFORMATION Daf(~ of Placement: Start Time: End Time: Water Depth at Time of Placement: Theoretical Grout Volume: Estimated Volume Placed Placement Method: Grout while drilling Comments: Specifications NIA NIA NIA 4/25/17 1:33 pm 1:57 pm NIA in. 1. 1 cu. NIA cu. ft. ft. www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum BRDUllD ENGINEERING Client: Jeff Armistead 10th Mountain Builders, LLC PO Box 955 Minturn, CO 81645 Lionsquare Lodge Tract A -Micropiles Micropile Log Excavation Date: April 25, 2017 Installation Contractor: Venter Companies Installation Equipment: Furukawa HCR9-GS drill rig GROUND Pile Number: 10 Plan Pile Number: N/A Structure I Pile Location: 5/W EXCAVATION INFORMATION Diameter. 4 in. Start Time: 11:17 am Finish Time: 11:54 am Measurements Existing Ground Elevation: 8096.8 ft. Total Depth of Excavation: 11.2 ft. Overburden Depth: N/A ft. Top of Bedrock Elevation: N/A ft. Depth 1n Bedrock: N/A ft. Bottom of Pile Elevation: 8085.6 ft Top of Pile Elevation: 8093.63 ft. Total Pile Length: 12.03 ft. Type I Diameter of Casing: N/A Casing Elevation. Top: N/A ft. Casing Elevation, Bottom: N/A ft Deviation from Center: 0 Plumbness of Excavation: Ok Cleanliness of Excavation: N/A Description of Soil: Cobble Groundwater Conditions: Unknown Location of Obstructions: N/A Specifications N/A N/A N/A N/A N/A N/A N/A ft.( min.) ft.(min.) ft ft. ft.( min.) max. max. REINFORCING STEEL INFORMATION Vertical Reinforcement: Placed 15 ft 15 ft 10 ft Total Length: Splice Lengths: Clearance Method: N/A GROUT INFORMATION Date of Placement: Start Time: End Time: Water Depth at Time of Placement: Theoretic;:il Grout Volume Estimated Volume Placed: Placement Method: Grout while drilling Comments Field Technician Chris Leeper Specifications N/A N/A N/A 4/25/17 11:17am 11 :54 am N/A in. 1 cu. N/A cu. ft. ft. Job Number: 17-6529 GROUND Pile Number: 11 Structure I Pile Location: 6/E Plan Pile Number: N/A EXCAVATION INFORMATION Diameter: 4 in. Start Time: 12:10 pm Finish Time: 12:34 pm Measurements Existing Ground Elevation: 8097.1 ft. Total Depth of Excavation 11.5 ft. Overburden Depth N/A ft. Top of Bedrock Elevation: N/A fl. Depth in Bedrock: N/A ft. Bottom of Pile Elevation 8085.6 ft. Top of Pile Elevation 8097.83 ft. Total Pile Length 12:33 ft. Type I Diameter of Casing N/A Casing Elevation, Top: N/A ft. Casing Elevation. Bottom: N/A ft. Deviation from Center: Plumbness of Excavation: 0 Ok Cleanliness of Excavation: N/A Description of Soil Cobble Groundwater Conditions: Unknown Location of Obstructions: N/A Specifications N/A NIA N/A N/A N/A N/A N/A ft( min.) ft(min.) ft. ft. ft.(min.) max. max. REINFORCING STEEL INFORMATION Vertical Reinforcement: Placed 15 ft 15 ft 10 ft Total Length: Splic0 Lengths: Clearance Method: N/A GROUT INFORMATION Dat0 of Placement: Start Time;: End Time: Water Depth at Time of Placement: Theoretical Grout Volume: Estimated Volume Placed: Placement Method: Grout while drilling Comments: Specifications N/A N/A N/A 4/25/17 12:10 pm 12:34 pm NIA in. NaN cu. N/A cu. ft ft. www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum BRDUND ENGINEERING Client: Jeff Armistead 10th Mountain Builders, LLC PO Box 955 Minturn, CO 81645 Lionsquare Lodge Tract A -Micropiles Excavation Date: April 25, 2017 Installation Contractor: Venter Companies Installation Equipment: Furukawa HCR9-GS drill rig GROUND Pile Number: 8 Plan Pile Number N/A Structure I Pile Location: 4/W EXCAVATION INFORMATION Micropile Log Job Number: 17-6529 GROUND Pile Number: 9 Structure I Pile Location: 51E Plan Pile Number: NIA EXCAVATION INFORMATION Diameter 4 in. Start Time: 10:12 am Finish Time: 10:30 am Diameter: 4 in. Start Time: 10:44 am Finish Time: 11 :06 am Measurements Existing Ground Elevation: 8093.6 ft. Total Depth of Excavation: 13.75 ft. Overburden Depth: N/A ft. Top of Bedrock Elevation· N/A ft. Depth in Bedrock: NIA ft. Bottom of Pile Elevation: 8079.85 ft. Top of Pile Elevation: 8094.43 ft. Total Pile Length: 14.58 ft. Type I Diameter of Casing: NIA Casing Elevation, Top: NIA ft. Casing Elevation, Bottom· N/A ft. Deviation from Center· 0 Plumbness of Excavation: Ok Cleanliness of Excavation: NIA Description of Soil: Cobble Groundwater Conditions: Unknown Location of Obstructions: NIA Spec1ficat1ons NIA N/A N/A NIA NIA NIA NIA ft.(min.) ft.( min.) ft. ft. tt.(m1n.) max. max. Measurements Existing Ground Elevation. 8096.8 ft. Total Depth of Excavation· 11 ft. Overburden Depth: NIA ft. Top of Bedrock Elevation NIA ft. Depth in Bedrock: NIA ft. Bottom of Pile Elevation: 8085.8 ft. Top of Pile Elevation· 8097.63 ft. Total Pile Length: 11.83 ft. Type I Diameter of Casing NIA Casing Elevation. Top: NIA ft. Casing Elevation, Bottom: NIA ft. Deviation from Center: 0 Plumbness of Excavation: Ok Cleanliness of Excavation: NIA Description of Soil: Cobble Groundwater Conditions: Unknown Location of Obstructions· NIA Specifications NIA NIA NIA NIA NIA NIA NIA ft.(rnin.) ft.(min.) ft. It. ft.( min.) max. max. REINFORCING STEEL INFORMATION REINFORCING STEEL INFORMATION Vertical Reinforcement: Placed 15 ft 15 ft 10 ft Specifications NIA Total Length Splice Lengths: Clearance Method: N/A GROUT INFORMATION NIA NIA Date of Placement: 4125117 Start Time: 10:12 am End Time: 10:30 am Water Depth at Time of Placement NIA Theoretical Grout Volume Estimated Volume Placed: 1.3 NIA Placement Method Grout while drilling Comments: Field Technician: Chris Leeper in. cu. cu. ft. ft. Vertical Re;nforcement: Placed 15 ft 15 ft 10 ft Total Length: Splice Lengths: Clearance Method: NIA GROUT INFORMATION Date of Placement: Start Time: End Time: Water Depth at Time of Placement: Theore1ical Grou1 Volume: Estimated Volume Placed: Placement Method: Grout while drilling Comments: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum Specifications NIA NIA NIA 4125117 10:44 am 11:06 am NIA NIA in. cu. cu. ft. ft. BRDUND ENGINEERING Client: Jeff Armistead 10th Mountain Builders, LLC PO Box 955 Minturn, CO 81645 Lionsquare Lodge Tract A -Micropiles Micropile Log Excavation Date: April 25, 2017 Installation Contractor: Venter Companies Installation Equipment: Furukawa HCR9-GS drill rig GROUND Pile Number: 6 Plan Pile Number NIA Structure I Pile Location: 3/E EXCAVATION INFORMATION Diameter 4 in. Start Time: 8:50 am Finish Time: 9:11 am Measurements Existing Ground Elevation 8093.3 ft. Total Depth of Excavation: 13.8 ft. Overburden Depth: N/A ft. Top of Bedrock Elevation: NIA ft. Depth in Bedrock: NIA ft. Bottom of Pile Elevation: 8079.5 ft. Top of Pile Elevation: 8094.13 ft. Total Pile Length: 14.63 ft. Type I Diameter of Casing: NIA Casing Elevation, Top: NIA ft. Casing Elevation, Bottom: NIA ft. Deviation from Center: 0 Plumbness of Excavation: Ok Cleanliness of Excavation: NIA Description of Soil: Cobble Groundwater Conditions: Unknown Location of Obstructions: NIA Spec1ficat1ons NIA NIA NIA NIA NIA NIA N/A ft.( min.) ft(min.) ft. ft. ft.(min.) max. max. REINFORCING STEEL INFORMATION Ve1iical Reinforcement: Placed 15 ft 15 ft 10 ft Total Length. Splice Lengths Clearance Method: N/A GROUT INFORMATION Date of Placement: Start Time: End Time: Water Depth at Time of Placement: Theoretical Grout Volume: Estimated Volume Placed: Placement Method: Grout while drilling Comments Field Technician Chris Leeper Specifications N/A NIA NIA 4125117 8:50 am 9:11 am N/A in. 1.3 cu. NIA CU. ft ft. Job Number: 17-6529 GROUND Pile Number: 7 Structure I Pile Location: 41E Plan Pile Number: NIA EXCAVATION INFORMATION Diameter 4 in. Start Time: 9:35 am Finish Time: 9:51 am Measurements Existing Ground Elevation: 8093.6 ft. Total Depth of Excavation 13.5 ft. Overburden Depth· NIA ft. Top of Bedrock Elevation: NIA fl. Depth in Bedrock NIA ft. Bottom of Pile Elev8tion: 8080.1 ft. Top of Pile Elevation: 8094.43 ft. Total Pile Length: 14.33 ft. Type / Diameter of Casing-NIA Casing Elevation. Top N/A ft. Casing Elevation. Bottom· NIA ft. Deviation from Center 0 Plumbness of Excavation: Ok Cleanliness of Excavation: NIA Description of Soil· Cobble Groundwater Conditions: Unknown Location of Obstructions NIA Specifications N/A NIA N/A NIA NIA NIA NIA fL(min.) ft.(min.) ft ft. ft.( min.) max. max. REINFORCING STEEL INFORMATION Placed Vertical Reinforcement: 15 ft 15 ft 10 ft Total Length: Splice Lengths: Clearance Method: N/A GROUT INFORMATION Date of Pl;icement: Start Time End Time: Water Depth at Time of Placement: Theoretical Grout Volume. Estimated Volume Placed: Placement Method: Grout while drilling Comments: Specifications NIA NIA NIA 4/25/17 9:35 am 9:51 am NIA in. 1.3 cu. NIA cu. ft. ft. www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum llRDUllD ENGINEERING Client: Jeff Armistead 1oth Mountain Builders, LLC PO Box 955 Minturn, CO 81645 Lionsquare Lodge Tract A -Micropiles Micropile Cover Report Date: April 25, 2017 Job Nu1r;ber. 17-6529 General Contractor: 10th Mountain Builders As scheduled, a representative visited the project site to perform special inspections on micropiles at locations requested. Ou!standin9 Oiscrcp<i1ic1cs Reported lh1s Date'? • Fie id Representative Chris Leeper www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum BRDUND ENGINEERING Client: Jeff Armistead 10th Mountain Builders, LLC PO Box 955 Minturn, CO 81645 Lionsquare Lodge Tract A -Micropiles Micropile Log Excavation Date: April 24, 2017 Installation Contractor: Venter Companies Installation Equipment: Furukawa HCR9-GS drill rig GROUND Pile Number: 5 Plan Pile Number: N/A Structure I Pile Location: 3/W EXCAVATION INFORMATION Diameter. 4 in. Start Time: 5:03 pm Finish Time: 5:20 pm Job Number: 17-6529 GROUND Pile Number: Plan Pile Number: Structure I Pile Location: EXCAVATION INFORMATION Diameter in. Start Time: Finish Time: Measurements Specifications Measurements Specifications Existing Ground Elevation: 8093.3 Total Depth of Excavation: 13.9 Overburden Depth· N/A Top of Bedrock Elevation: N/A Depth 1n Bedrock: N/A Bottom of Pile Elevation: 8079.4 Top of Pile Elevation· 8094.1 Total Pile Length: 14.7 Type I Diameter of Casing: N/A Casing Elevation. Top: N/A Casinq Elevation. Bottom: N/A Deviation from Center: 0 Plumbness of Excavation: Yes Cleanliness of Excavation: N/A Description of Soil: Cobble Groundwater Conditions Unknown Location of Obstructions: N/A ft. ft. ft. ft. ft. ft. ft. ft. ft. ft. N/A N/A N/A N/A N/A N/A N/A ft.(min.) ft.(min.) ft. ft. ft.(min.) max. max. Existing Ground Elevation: Total Depth of Excavation: Overburden Depth: Top of Bedrock Elevation: Depth in Bedrock: Bottom of Pile Elevation: Top of Pile Elevation: Total Pile Length: Type I Diameter of Casing: Casing Elevation, Top Casing Elevation. Bottom: Deviation from Center· Plumbness of Excavation: Cleanliness of Excavation· Description of Soil: Groundwater Conditions· Location of Obstructions: ft. ft. ft. ft. ft. ft. fl. ft. ft. ft. ft.(min.) ft.(min.) ft. ft. ft.(rnin.) max. max. REINFORCING STEEL INFORMATION REINFORCING STEEL INFORMATION Placed Vertical Reinforcement: 15 ft 15 ft 10 ft Total Length: Splice Lengths. Clearance Method: N/A GROUT INFORMATION Date of Placement: Start Time: End Time: Water Depth at Time of Placement: Theoretical Grout Volume: Estimated Volume Placed: Placement Method: Grout while drilling Comments Field Technician: Chris Leeper Specifications N/A N/A N/A 4/24/17 5:03 pm 5:20 pm N/A in. 1.3 CU. N/A cu. ft. ft. Vertical Reinforcement: Total Length Splice Lengths: Clearance Method: Placed GROUT INFORMATION Date of Placement: Start Time: End Time: Water Depth at Time of Placement: Theoretical Grout Volume: Estimated Volume Placed Placement Method: Comments: www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum Specifications in. cu. ft. cu. ft. BRDUllD ENGINEERING Client: Jeff Armistead 10th Mountain Builders, LLC PO Box955 Minturn, CO 81645 Lionsquare Lodge Tract A • Micropiles Micropile Log Excavation Date: April 24, 2017 Installation Contractor: Venter Companies Installation Equipment: Furukawa HCR9-GS drill rig GROUND Pile Number: 3 Plan Pile Number NIA Structure I Pile Location: 2/W EXCAVATION INFORMATION Diameter 4 in. Start Time: 4:05 pm Finish Time 4:19 pm Measurements Existing Ground Elevation: 8090 ft. Total Depth of Excavation: 13.8 ft. Overburden Dept11: NIA ft. Top of Bedrock Elevation: NIA ft. Depth in Bedrock: NIA ft. Bottom of Pile Elevation· 8076.2 ft. Top of Pile Elevation· 8090.83 ft. Total Pile Length: 14.63 ft. Type I Diameter of Casing: N/A Casing Elevation, Top: NIA ft. Casing Elevation, Bottom· NIA ft. Deviation from Center: 0 Plumbness of Excavation: Yes Cleanliness of Excavation: NIA Description of Soil Cobble Groundwater Conditions: Unknown Location of Obstructions: NIA Specifications NIA NIA N/A N/A NIA N/A N/A ft(min.) ft.( min.) ft. ft. ft.(min.) max. max. REINFORCING STEEL INFORMATION Vertical Reinforcement: Total Length: Splice Lengths: Clearance Method. NIA Placed 15 ft 15 ft 10 ft GROUT INFORMATION Date of Placement: Start Time: End Time: Water Depth at Time of Placement: Theoretical Grout Volume: Estimated Volume Placed: Placement Method: Grout while drilling Comments· Field Technician Chris Leeper Specifications NIA N/A NIA 4/24117 4:05 pm 4:19 pm NIA in. 1.3 cu. NIA CU, ft. tt. Job Number: 17-6529 GROUND Pile Number: 4 Structure I Pile Location: 21E Plan Pile Number: N/A EXCAVATION INFORMATION Diameter: 4 in. Start Time: 4:38 pm Finish Time: 4:52 pm Measurements Existing Ground Elevation: 8090 ft. Total Depth of Excavation 13.5 ft. Overburden Depth: N/A ft. Top of Bedrock Elevation: NIA ft. Depth in Bedrock: NIA ft. Bottom of Pile Elevation: 8076.5 ft. Top of Pile Elevation: 8090.83 ft. Total Pile Length· 14.33 ft. Type I Diameter of Casing: N/A Casing Elevation. Top: N/A ft. Cnsing Elevation. Bottom: NIA ft. Deviation from Center: 0 Plumbness of Excavation: Yes Cleanliness of Excavation: N/A Description of Soil Cobble Groundwater Conditions: Unknown Location of Obstructions· NIA Specifications NIA N/A N/A NIA N/A N/A N/A ft.( min.) ft.( min.) ft. ft. ft.( min.) max. max. REINFORCING STEEL INFORMATION Placed Vertical Reinforcement: 15 ft 15 ft 10 ft Total Length: Splice Lengths. Clearance Method: NIA GROUT INFORMATION Date of Placement: Start Time. End Time Willer Depth at Time of Placement. Theoretical Grout Volume: Estimated Volume Placed: Placement Method Grout while drilling Comments: Specifirntions NIA NIA NIA 4124117 4:38 pm 4:52 pm NIA In, 1.3 cu NIA cu. ft. ft. www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum llRDUND ENGINEERING Client: Jeff Armistead 1oth Mountain Builders, LLC PO Box 955 Minturn, CO 81645 Lionsquare Lodge Tract A -Micropiles Micropile Log Excavation Date: April 24, 2017 Installation Contractor: Venter Companies Installation Equipment: Furukawa HCR9-GS drill rig GROUND Pile Number: 1 Plan Pile Number: NIA Structure I Pile Location: 11E EXCAVATION INFORMATION Di<:lmeter: 4 in. Start Time: 2:40 pm Finish Time: 3:14 pm Measurements Existing Ground Elevation: 8090 ft. Total Depth of Excavation: 13.75 ft. Overburden Depth: NIA ft Top of Bedrock Elevation: NIA ft. Depth in Bedrock: NIA ft. Bottom of Pile Elevation: 8076.25 ft. Top of Pile Elevation: 8090.83 ft. Total Pile Length: 15 fl. Type I Diameter of Casing: NIA Casing Elevation, Top: NIA ft. Casing Elevation, Bottom: NIA ft. Deviation from Center· 0 Plumbness of Excavation· Yes Cleanliness of Excavation: NIA Description of Soil: Cobble Groundwater Conditions: Unknown Location of Obstructions: NIA Spec1f1cat1ons NIA NIA NIA NIA NIA NIA NIA ft.(min.) ft.(min.) ft. ft. fl.( min.) max. max. REINFORCING STEEL INFORMATION Vertical Reinforcement: Total Length. Splice Lengths: Clearance Method: N/A Placed 15 ft 15 ft 10 ft GROUT INFORMATION Date of Placement: Start Time: End Time: Water Depth at Time of Placement: Theoretical Grout Volume: Estimated Volume Placed· Placement Method: Grout while drilling Specifications N/A NIA N/A 4/24117 2:40 pm 3:14 pm N/A in. 1.3 cu. NIA cu. fl ft. Comments Pile locations are from bottom of steps and which side of steps. Example (1/W) =1st pile from bottom/ west side. Freid Technician: Chris Leeper Job Number: 17-6529 GROUND Pile Number: 2 Structure i Pile Location: 1/W Plan Pile Number: NIA EXCAVATION INFORMATION Diameter: 4 in. Start Time: 3:21 pm Finish Time 3:42 pm Measunoments Specifications Existing Ground Elevation: Total Depth of Excavation Overburden Depth: Top of Bedrock Elevation: Depth in Bedrock: Bottom of Pile Elevation: Top of Pile Elevation Total Pile Length: Type I Diameter of Casing Casing Elevation. Top: Casing Elevation. Bottom: Deviation from Center· Plumbness of Excavation: Cleanliness of Excavation: Description of Soil· Groundwater Conditions· Location of Obstructions: 8090 14.17 NIA NIA NIA 8075.83 8090.83 15 NIA NIA NIA 0 Yes NIA Cobble Unknown NIA ft. ft. ft. ft. ft. ft. ft. ft. ft. ft. NIA ft(min.) NIA NIA NIA NIA NIA NIA ft.( min.) ft. ft. ft.(rnin.) max. n1ax. REINFORCING STEEL INFORMATION Vertical Reinforcement: Total Length: Splice Lengths: Clearance Method: NIA Placed 15 ft 15 ft 10 ft Specifications NIA NIA NIA GROUT INFORMATION Date of Placement 4/24/17 Start Time 3:21 pm End Time: 3:42 pm Water Depth at Tune of Placement: NIA in. Theoretical Grout Volume: 1.3 cu. ft. Estimated Volume PlacRd NIA cu. ft. Placement Method: Grout while drilling Comments· www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum BRDUND ENGINEERING Client: Jeff Armistead 10th Mountain Builders, LLC PO Box955 Minturn, CO 81645 Lionsquare Lodge Tract A -Micropiles Micropile Cover Report Date April 24, 2017 job Nun1r_1er 17-6529 Gener;·11 Contractor: 10th Mountain Builders As scheduled, a representative visited the project site to perform special inspections on micropiles at locations requested. Cornn1ents or Photos Outstanding Discrepancies Reported tl11s Date~' • No. of Field F~eprnsentz1l1vc:: Chris Leeper www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum llRDUND ENGINEER I NG Client: Jeff Armistead 10th Mountain Builders, LLC PO Box 955 Minturn, CO 81645 Lionsquare Lodge Tract A -Micropiles Micropile Cover Report Date: April 25, 2017 Job Number: 17-6529 General Contractor: 10th Mountain Builders Rep. Notified: Jeff As scheduled, a representative visited the project site to perform special inspections on micropiles at locations requested. Comments or Photos: Yes No Outstanding Discrepancies Reported this Date? ,-.. \ No. of Pages Attached: 6 Field Representative: Chris Leeper www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum llRDUND ENGINEERING Client: Jeff Armistead 10th Mountain Builders, LLC PO Box955 Minturn, CO 81645 Lionsquare Lodge Tract A -Micropiles Micropile Cover Report Date: April 24, 2011 Job Number: 17-6529 General Contractor: 1 Oth Mountain Builders Rep. Notified: Jeff As scheduled, a representative visited the project site to perform special inspections on micropiles at locations requested. Comments or Photos: Yes ...... Outstanding Discrepancies Reported this Date? ~ No. of Pages Attached: 3 Field Representative: Chris Leeper www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum