Loading...
HomeMy WebLinkAboutB17-0049_A503_1494616920.pdfR-11 MIN. 41_ 2" 1" R-11 MIN. 3 PANEL SLIDER POCKET R-22.5 MIN. R-5 MIN. 1/4"/FT. R-40 MIN. R-28 MIN. R-10 WALL FRAMING T.O. PLYWD 8083'- 8-3/8" 8084'- 7-1/4" 8084'- 4-3/8" T.O. PARAPET- FRAME T.O. PARAPET -FIN. STEEL TRELLIS SEE STRUCTURAL 3/4" CONT PLY BLKG C'FLG./PARAPET FLASHING; EXT.STL. MEMB. ROOF FLASHING BELOW METAL FLASH LIQUID APPLIED ROOF MEMB. W/ FABRIC REINFORCING. PROVIDE DOUBLE REINFORCING AT SUBSTRATE JOINTS WOOD BLOCKING SEE ROOF PLAN FOR WD THICKNESS @ PERIMETER STEEL PER STRUCTURAL "Z" SUPPORT; EXT. STL. EXT. STEEL CLIP LAP WALL MEMB. OVER PARAPET 2 LAYERS 3_ 4 " PLY BLOCKING ROOF FRAMING- SEE STRUCTURAL EXT. STEEL COPING ENGINEERED FRAMING AIR GAP SPRAY FOAM INSUL. BLOWN IN BIB INSULATION 1X8 WOOD SIDING VFY SPECIES/ FIN. HOOK STRIP W/ METAL FLASHING METAL FLASHING AT SUPPORT ANGLE METAL FLASHING AT SUPPORT ANGLE PROVIDE RUN FOR ELEC. CONDUIT- LIGHTING IN HSS MAIN DRAIN OVERFLOW R-11 MIN. 41_ 2" R-22.5 MIN. 1" R-5 MIN.4" 41_ 2" R-22.5 MIN. 1" R-5 MIN. 21_ 4" 1/4"/FT. 1/4"/FT. R-40 MIN. R-28 MIN. R-40 MIN. R-28 MIN. R-10 PLY SHEATHING WALL FRAMING T.O. PLYWD 8080'- 3-3/4" 8082'- 0" 8081'- 9-1/8" T.O. PARAPET- FRAME T.O. PARAPET -FIN. 3/4" CONT PLY BLKG C'FLG./PARAPET FLASHING; EXT. STL. MEMB. ROOF FLASHING BELOW METAL FLASH BALLAST FILTER FABRIC LIQUID APPLIED ROOF MEMB. W/ FABRIC REINFORCING. PROVIDE DOUBLE REINFORCING AT SUBSTRATE JOINTS TAPERED ROOF INSUL. WITH 5/8" TYPE X GYP. SHEATHING SIM. TO DENS DECK. 1/8" PER FOOT SLOPE TO DRAIN WOOD BLOCKING SEE ROOF PLAN FOR WD THICKNESS @ PERIMETER PLY. DECK. SEE STRUCTURAL RAISED HEADER PER STRUCTURAL "Z" SUPPORT; EXT. STL. EXT. STEEL CLIP LAP WALL MEMB. OVER PARAPET 2 LAYERS 3_ 4 " PLY BLOCKING ROOF FRAMING- SEE STRUCTURAL BALLAST FILTER FABRIC TAPERED ROOF INSUL. WITH 5/8" TYPE X GYP. SHEATHING SIM. TO DENS DECK. 1/8" PER FOOT SLOPE TO DRAIN PLY. DECK. SEE STRUCTURAL EXT. STEEL COPING ZURN Z125 8-3/8" DIA ROOF DRAIN W/ OVERFLOW DRAIN SPRAY FOAM INSUL. BLOWN IN BIB INSULATION 5/8" GWB STUCCO W/ FRY REGLETT CHANNEL HOOK STRIP W/ METAL FLASHING METAL FLASHING AT HEAD STUCCO JAMB ROLL DOWN SHADE/ MOTORIZED 5/8" GWB JAMB R-11 MIN. 41_ 2" 1" 71_ 8" R-11 MIN. R-22.5 MIN. R-5 MIN. 6" 9" 81_ 4" 6" VFY 1'-03_ 4" 5" 1/4"/FT. R-40 MIN. R-28 MIN. R-10 PLY SHEATHING WALL FRAMING ROOF FRAMING- SEE STRUCTURAL T.O. PLYWD 8083'- 8-3/8" 8084'- 7-1/4" 8084'- 4-3/8" T.O. PARAPET- FRAME T.O. PARAPET -FIN. SPRAY FOAM INSUL. BLOWN IN BIB INSULATION AIR GAP ENGINEERED FRAMING VFY W/ RCP 3/4" CONT PLY BLKG C'FLG./PARAPET FLASHING; EXT. STL. MEMB. ROOF FLASHING BELOW METAL FLASH LIQUID APPLIED ROOF MEMB. W/ FABRIC REINFORCING. PROVIDE DOUBLE REINFORCING AT SUBSTRATE JOINTS WOOD BLOCKING SEE ROOF PLAN FOR WD THICKNESS @ PERIMETER "Z" SUPPORT; EXT. STL. LAP WALL MEMB. OVER PARAPET 2 LAYERS 3_ 4 " PLY BLOCKING EXT. STEEL COPING HOOK STRIP W/ METAL FLASHING BALLAST FILTER FABRIC TAPERED ROOF INSUL. WITH 5/8" TYPE X GYP. SHEATHING SIM. TO DENS DECK. 1/8" PER FOOT SLOPE TO DRAIN PLY. DECK. SEE STRUCTURAL STEEL PER STRUCTURAL 1X8 WOOD SIDING VFY SPECIES/ FIN. METAL FLASHING AT HEAD WOOD TRIM AT JAMB DRYWALL AT JAMB CENTOR BUG SCREEN ROLL DOWN SHADE/ MOTORIZED WEILAND TRIPLE PANEL POCKET DOOR MAIN DRAIN OVERFLOW R-11 MIN. 41_ 2" R-22.5 MIN. 1" R-5 MIN. 4" 41_ 2" R-22.5 MIN. 1" R-5 MIN. 21_ 4" 71_ 8" 91_ 2" 81_ 4" 9" 1/4"/FT. 1/4"/FT. R-40 MIN. R-28 MIN. R-40 MIN. R-28 MIN. R-10 PLY SHEATHING 3/4" CONT PLY BLKG C'FLG./PARAPET FLASHING; EXT. STL. MEMB. ROOF FLASHING BELOW METAL FLASH BALLAST FILTER FABRIC WALL FRAMING LIQUID APPLIED ROOF MEMB. W/ FABRIC REINFORCING. PROVIDE DOUBLE REINFORCING AT SUBSTRATE JOINTS TAPERED ROOF INSUL. WITH 5/8" TYPE X GYP. SHEATHING SIM. TO DENS DECK. 1/8" PER FOOT SLOPE TO DRAIN WOOD BLOCKING SEE ROOF PLAN FOR WD THICKNESS @ PERIMETER PLY. DECK. SEE STRUCTURAL STEEL PER STRUCTURAL "Z" SUPPORT; EXT. STL. EXT. STEEL CLIP LAP WALL MEMB. OVER PARAPET 2 LAYERS 3_ 4 " PLY BLOCKING ROOF FRAMING- SEE STRUCTURAL BALLAST FILTER FABRIC TAPERED ROOF INSUL. WITH 5/8" TYPE X GYP. SHEATHING SIM. TO DENS DECK. 1/8" PER FOOT SLOPE TO DRAIN PLY. DECK. SEE STRUCTURAL EXT. STEEL COPING ZURN Z125 8-3/8" DIA ROOF DRAIN W/ OVERFLOW DRAIN ENGINEERED FRAMING AIR GAP AIR GAP T.O. PLYWD 8083'- 8-3/8" 8084'- 7-1/4" 8084'- 4-3/8" T.O. PARAPET- FRAME T.O. PARAPET -FIN. SPRAY FOAM INSUL. ROLLER AND DRAPERY POCKET BLOWN IN BIB INSULATION 5/8" GWB 1X8 WOOD SIDING VFY SPECIES/ FIN. BOX BEAMS W/ WOOD CLADDING/ 1/4" STEEL PLATE AT BASE BOX BEAMS W/ WOOD CLADDING/ 1/4" STEEL PLATE AT BASE HOOK STRIP W/ METAL FLASHING Scale Date Drawn By Project Number © 2014 Kh Webb Architects 1 1/2" = 1'-0" 3/17/2017 3:42:59 PM A503 ROOF DETAILS LIPNICK FAMILY RESIDENCE 1255 WESTHAVEN CIRCLE, VAIL, COLORADO 81657 Author 03.17.2017 2511 LOT 45 GLEN STREAM No. Description Date 1 1/2" = 1'-0" 1 ROOF DETAIL AT KITCHEN POCKET 1 1/2" = 1'-0" 2 ROOF DETAIL AT OFFICE 1 1/2" = 1'-0" 3 ROOF DETAIL AT KITCHEN-DINING 1 1/2" = 1'-0" 4 ROOF DETAIL AT LIVING / DINING 05/12/17