HomeMy WebLinkAboutB17-0203_B17-0203.001 Transmittal Form_1502124000.pdf •
Department of Community Development
75 South Frontage Road
Vail, CO 81657
TOWN OFn Tel: 970.479.2139
www.vailgov.com
TRANSMITTAL FORM
Use this form when submitting additional information, changes&inspection reports for building permits.
This form is also used for requesting a revision to building permits. A two hour minimum building review
fee of$110 will be charged upon reissuance of the permit.
Submit this form only to: cdev_submittal@vailgov.com. Deliver paper plans to Community Develop-
ment or upload your revised/corrected plans to the appropriate project in ProjectDox,when requested.
ApplicationlPermit#(s)information applies to: B17-0203
(*) Revisions (i ) Response to Correction Letter attached copy of correction letter
(T) Deferred Submittal O Other
Project Street Address:
520 East Lionshed Cir 302 Description of Transmittal/List of Changes, Items Attached,
Indicate changed plan pages:
(Number) (Street) (Suite#)
Building/Complex Name: Vail Lionshead Centre Revised structural floor at new loft level
Replace steel bar joist, metal pan and concrete decking
Applicant Information with 9 1/4" light gauge steel joist and
(architect,contractor,owner/owner's rep) 7/8" Cemdeck structural panel
Contact Name: David Burns r7('17 (�l�� c (N o. Reason for change is to lighten the load on the exist structure.
Address: PO Box 2195
City Eagle State: CO Zip: 81631 (use additional sheet if necessary)
Contact Name:
970-328-9280 Building Permits:
Contact Phone: Revised ADDITIONAL Valuations(Labor&Materials)
avld lesarChiteCts.COm (DO NOT include original valuation)
david@giesarchitects.com
E-Mail: @g
Building: $
I hereby acknowledge that I have read this application,filled out
in full the information required,completed an accurate plot plan, Plumbing: $
and state that all the information as required is correct. I agree to
comply with the information and plot plan, to comply with all Town Electrical: $
ordinances and state laws, and to build this structure according
to the town's zoning and subdivision codes, design review ap- Mechanical: $
proved, International ilding and Residential Codes and other
ordinances fyieT, Total: $0.00
Owner/Owner's Representative Signature (Required)
Date Received:
21-Apr-2017