Loading...
HomeMy WebLinkAboutB17-0282_M100_1507064763.pdfMM KK JJ II GG EEA EE CC AA A B 3 5 Z YA Y XN X 15 ZA 6A K.5 13.5 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 2 C D E F G H I J K L M 2 E.5 L.5 REMOVE EXISTING ZONE VALVES FROM BOILER MANIFOLD FOR THOSE ZONES SERVING ANY RESIDENCE ZONES. EXISTING ZONE VALVES FROM OTHER MECHANICAL ROOM THAT SERVE THE RETAIL SPACE SHALL BE RE-ROUTED TO THIS MECHANICAL ROOM BOILER MANIFOLD (N)B-1 (E)BOILER (E)BOILER (N)IWH-1 REMOVE ALL EXISTING PIPING, ZONE VALVES. PUMPS, ETC. FROM EXISTING BOILERS. RE-ROUTE EXISTING ZONE VALVES FROM THIS MECHANICAL ROOM THAT SERVE THE RETAIL SPACE TO OTHER MECHANICAL ROOM BOILER MANIFOLD. PROVIDE ALL NEW PIPING, PUMPS, ETC. PER BOILER PIPING SCHEMATIC, SHEET M002 OWNER PROJECT NO.: 21074.00 VAIL, COLORADO 81657 311 BRIDGE STREET LANDSCAPE SHERRY DORWARD P.O. BOX 3766 VAIL, CO 81658 ARCHITECT ARCHITECT 4240 ARCHITECTURE 3507 RINGSBY CT. STUITE 117 DENVER, CO 80216 HILL BUILDING RENOVATION 39°38'24"N 106°22'25"W STRUCTURAL MONROE NEWELL 70 BENCHMARK RD. SUITE 204 AVON, CO 81620 ENGINEER MEP DMCE ENGINEERING 5737 6TH AVE. LAKEWOOD, CO 80214 ENGINEER CIVIL ALPINE ENGINEERING, INC. 34510 HIGHWAY 6 UNIT A-9 EDWARDS, CO 81632 ENGINEER TOWN OF VAIL USE ISS.# DESCRIPTION DATE S BUILDING PERMIT ISSUE 2017-07-07 M100 BASEMENT FLOOR MECHANICAL PLAN 1 SCALE: 1/4" = 1'-0" BASEMENT FLOOR MECHANICAL PLAN N 10/03/17