HomeMy WebLinkAboutB17-0282_M100_1507064763.pdfMM KK JJ II GG EEA EE CC AA A B
3
5
Z
YA
Y
XN
X
15
ZA
6A
K.5
13.5
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
2
C D E
F G H I J K L M
2
E.5 L.5
REMOVE EXISTING ZONE VALVES FROM
BOILER MANIFOLD FOR THOSE ZONES
SERVING ANY RESIDENCE ZONES. EXISTING
ZONE VALVES FROM OTHER MECHANICAL
ROOM THAT SERVE THE RETAIL SPACE
SHALL BE RE-ROUTED TO THIS
MECHANICAL ROOM BOILER MANIFOLD
(N)B-1 (E)BOILER (E)BOILER
(N)IWH-1
REMOVE ALL EXISTING PIPING, ZONE VALVES. PUMPS,
ETC. FROM EXISTING BOILERS. RE-ROUTE EXISTING ZONE
VALVES FROM THIS MECHANICAL ROOM THAT SERVE THE
RETAIL SPACE TO OTHER MECHANICAL ROOM BOILER
MANIFOLD. PROVIDE ALL NEW PIPING, PUMPS, ETC. PER
BOILER PIPING SCHEMATIC, SHEET M002
OWNER
PROJECT NO.: 21074.00
VAIL, COLORADO
81657
311 BRIDGE
STREET
LANDSCAPE SHERRY DORWARD
P.O. BOX 3766
VAIL, CO 81658
ARCHITECT
ARCHITECT 4240 ARCHITECTURE
3507 RINGSBY CT. STUITE 117
DENVER, CO 80216
HILL BUILDING
RENOVATION
39°38'24"N
106°22'25"W
STRUCTURAL MONROE NEWELL
70 BENCHMARK RD. SUITE 204
AVON, CO 81620
ENGINEER
MEP DMCE ENGINEERING
5737 6TH AVE.
LAKEWOOD, CO 80214
ENGINEER
CIVIL ALPINE ENGINEERING, INC.
34510 HIGHWAY 6 UNIT A-9
EDWARDS, CO 81632
ENGINEER
TOWN OF VAIL USE
ISS.# DESCRIPTION DATE
S BUILDING PERMIT ISSUE 2017-07-07
M100
BASEMENT FLOOR
MECHANICAL PLAN
1
SCALE: 1/4" = 1'-0"
BASEMENT FLOOR MECHANICAL PLAN
N
10/03/17