Loading...
HomeMy WebLinkAboutB17-0282_P101_1507064556.pdfDHC DCW DHW DHC DCW DHW HW, CW & RECIRC. LINES DOWN IN OR ON WALL TO LEVEL BELOW HW, CW & RECIRC. LINES UP TO LEVEL ABOVE 4" WASTE FROM ABOVE, PROVIDE WCO AT BASE 4" WASTE FROM ABOVE, PROVIDE WCO AT BASE 4" WASTE FROM ABOVE, PROVIDE WCO AT BASE 2" WASTE FROM ABOVE DOWN TO 3" WASTE BELOW FLOOR, PROVIDE WCO AT BASE GENERAL NOTES: 1. CONTRACTOR TO FIELD VERIFY ALL EXISTING PLUMBING CONDITIONS PRIOR TO ORDERING AND INSTALLATION OF NEW PLUMBING EQUIPMENT/SYSTEMS. NOTIFY ENGINEER IN WRITING WITH ANY DRAWING/DESIGN DISCREPANCIES. 2. FIELD VERIFY LOCATIONS OF ALL SANITARY WASTE, GAS AND WATER RISERS IN/ON WALLS PRIOR TO INSTALLATION. 3. FIELD VERIFY DOWNSPOUT LOCATIONS OF ALL NEW 3" STORM FROM GUTTERS, AREA DRAINS AND PLANTER DRAINS WITH OWNER/ARCHTIECT PRIOR TO INSTALLATION OF THE ADDED STORM SYSTEM. WORK NOTES: TIE NEW 3" SANITARY WASTE INTO CLOSEST EXISTING SANITARY WASTE LINE OF SAME SIZE. FIELD VERIFY LOCATION OF EXISTING SANITARY WASTE MAINS PRIOR TO INSTALLATION. NOTIFY ENGINEER IN WRITING WITH ANY DRAWING DESIGN VS. IN-FIELD CONDITIONS PRIOR TO INSTALLATION. TIE NEW 4" SANITARY WASTE INTO CLOSEST EXISTING SANITARY WASTE LINE OF SAME SIZE FROM REMOVED EXISTING RESTROOMS IN THIS AREA. FIELD VERIFY LOCATION OF EXISTING SANITARY WASTE MAINS PRIOR TO INSTALLATION. NOTIFY ENGINEER IN WRITING WITH ANY DRAWING DESIGN VS. IN-FIELD CONDITIONS PRIOR TO INSTALLATION. 1 2 2 2 2 1 3" (E) 4" FIRE ENTRY LINE FOR (E) FIRE SUPPRESSION SYSTEM TO REMAIN IN PLACE AS IS M (N) 2" GAS LINE DOWN BELOW TO GRADE LEVEL & INTO BASEMENT TO FOLLOW REMOVED GAS LINE PATH 1/2" COLD WATER RVB1 2"FS1 (E) GAS METER, 150 FEET LONGEST RUN, 2000 CFH TOTAL GAS LOAD, 14" W.C. GAS PRESSURE, (N) 2" GAS MAIN LINE (N) GAS LINES UP GAS LINE UP GAS LINE UP GPRV2 1187 CFH 80 FEET 1-1/4" GAS LINE DOWN TO BASEMENT 3" FROM GUTTER ABOVE 3"FROM GUTTER ABOVE 3"FROM GUTTER ABOVE 3"FROM GUTTER ABOVE 3"FROM GUTTER ABOVE 3"FROM GUTTER ABOVE 3"FROM GUTTER ABOVE 3"FROM GUTTER ABOVE 3"FROM GUTTER ABOVE 3"FROM GUTTER ABOVE 3"FROM GUTTER ABOVE 3"FROM GUTTER ABOVE 3"FROM GUTTER ABOVE 3" FROM GUTTER ABOVE 3" STORM DOWN 3" STORM DOWN 3" STORM DOWN 3" STORM DOWN 3" STORM DOWN 3" STORM DOWN DCW W G G G G G GAS LINE UP GPRV3 35 CFH 50 FEET GAS PIPE UP GAS LINE UP 1 1 1 MM KK JJ II GG EEA EE CC AA A B 3 5 Z YA Y XN X 15 ZA 6A K.5 13.5 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 2 C D E F G H I J K L M 2 E.5 L.5 OWNER PROJECT NO.: 21074.00 VAIL, COLORADO 81657 311 BRIDGE STREET LANDSCAPE SHERRY DORWARD P.O. BOX 3766 VAIL, CO 81658 ARCHITECT ARCHITECT 4240 ARCHITECTURE 3507 RINGSBY CT. STUITE 117 DENVER, CO 80216 HILL BUILDING RENOVATION 39°38'24"N 106°22'25"W STRUCTURAL MONROE NEWELL 70 BENCHMARK RD. SUITE 204 AVON, CO 81620 ENGINEER MEP DMCE ENGINEERING 5737 6TH AVE. LAKEWOOD, CO 80214 ENGINEER CIVIL ALPINE ENGINEERING, INC. 34510 HIGHWAY 6 UNIT A-9 EDWARDS, CO 81632 ENGINEER TOWN OF VAIL USE ISS.# DESCRIPTION DATE S BUILDING PERMIT ISSUE 2017-07-07 01 BUILDING DEPT COMM. 2017-08-16 1 02 PERMIT REVISIONS 2017-08-25 2 P101 FIRST FLOOR PLUMBING PLAN 1 SCALE: 1/4" = 1'-0" FIRST FLOOR PLUMBING PLAN 10/03/17