HomeMy WebLinkAboutB17-0282_P101_1507064810.pdfDHC
DCW
DHW
DHC
DCW
DHW
HW, CW & RECIRC. LINES
DOWN IN OR ON WALL
TO LEVEL BELOW
HW, CW & RECIRC. LINES
UP TO LEVEL ABOVE
4" WASTE FROM ABOVE,
PROVIDE WCO AT BASE
4" WASTE FROM ABOVE,
PROVIDE WCO AT BASE
4" WASTE FROM ABOVE,
PROVIDE WCO AT BASE
2" WASTE FROM ABOVE
DOWN TO 3" WASTE
BELOW FLOOR,
PROVIDE WCO AT BASE
GENERAL NOTES:
1. CONTRACTOR TO FIELD VERIFY ALL EXISTING PLUMBING CONDITIONS
PRIOR TO ORDERING AND INSTALLATION OF NEW PLUMBING
EQUIPMENT/SYSTEMS. NOTIFY ENGINEER IN WRITING WITH ANY
DRAWING/DESIGN DISCREPANCIES.
2. FIELD VERIFY LOCATIONS OF ALL SANITARY WASTE, GAS AND WATER
RISERS IN/ON WALLS PRIOR TO INSTALLATION.
3. FIELD VERIFY DOWNSPOUT LOCATIONS OF ALL NEW 3" STORM FROM
GUTTERS, AREA DRAINS AND PLANTER DRAINS WITH OWNER/ARCHTIECT
PRIOR TO INSTALLATION OF THE ADDED STORM SYSTEM.
WORK NOTES:
TIE NEW 3" SANITARY WASTE INTO CLOSEST EXISTING SANITARY WASTE LINE
OF SAME SIZE. FIELD VERIFY LOCATION OF EXISTING SANITARY WASTE MAINS
PRIOR TO INSTALLATION. NOTIFY ENGINEER IN WRITING WITH ANY DRAWING
DESIGN VS. IN-FIELD CONDITIONS PRIOR TO INSTALLATION.
TIE NEW 4" SANITARY WASTE INTO CLOSEST EXISTING SANITARY WASTE LINE
OF SAME SIZE FROM REMOVED EXISTING RESTROOMS IN THIS AREA. FIELD
VERIFY LOCATION OF EXISTING SANITARY WASTE MAINS PRIOR TO
INSTALLATION. NOTIFY ENGINEER IN WRITING WITH ANY DRAWING DESIGN VS.
IN-FIELD CONDITIONS PRIOR TO INSTALLATION.
1
2
2
2 2
1
3"
(E) 4" FIRE ENTRY LINE FOR
(E) FIRE SUPPRESSION SYSTEM
TO REMAIN IN PLACE AS IS
M
(N) 2" GAS LINE DOWN BELOW TO GRADE
LEVEL & INTO BASEMENT TO FOLLOW
REMOVED GAS LINE PATH
1/2" COLD
WATER
RVB1
2"FS1
(E) GAS METER, 150 FEET LONGEST RUN,
2000 CFH TOTAL GAS LOAD, 14" W.C. GAS
PRESSURE, (N) 2" GAS MAIN LINE
(N) GAS LINES UP
GAS LINE UP
GAS LINE UP
GPRV2
1187 CFH
80 FEET
1-1/4" GAS LINE DOWN
TO BASEMENT
3" FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
3" FROM
GUTTER
ABOVE
3" STORM
DOWN
3" STORM
DOWN
3" STORM
DOWN
3" STORM
DOWN
3" STORM
DOWN
3" STORM
DOWN
DCW
W G
G G G
G GAS LINE
UP
GPRV3
35 CFH
50 FEET GAS PIPE UP
GAS LINE UP
1
1
1
MM KK JJ II GG EEA EE CC AA A B
3
5
Z
YA
Y
XN
X
15
ZA
6A
K.5
13.5
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
2
C D E F G H I J K L M
2
E.5 L.5
OWNER
PROJECT NO.: 21074.00
VAIL, COLORADO
81657
311 BRIDGE
STREET
LANDSCAPE SHERRY DORWARD
P.O. BOX 3766
VAIL, CO 81658
ARCHITECT
ARCHITECT 4240 ARCHITECTURE
3507 RINGSBY CT. STUITE 117
DENVER, CO 80216
HILL BUILDING
RENOVATION
39°38'24"N
106°22'25"W
STRUCTURAL MONROE NEWELL
70 BENCHMARK RD. SUITE 204
AVON, CO 81620
ENGINEER
MEP DMCE ENGINEERING
5737 6TH AVE.
LAKEWOOD, CO 80214
ENGINEER
CIVIL ALPINE ENGINEERING, INC.
34510 HIGHWAY 6 UNIT A-9
EDWARDS, CO 81632
ENGINEER
TOWN OF VAIL USE
ISS.# DESCRIPTION DATE
S BUILDING PERMIT ISSUE 2017-07-07
01 BUILDING DEPT COMM. 2017-08-16
1
02 PERMIT REVISIONS 2017-08-25
2
P101
FIRST FLOOR
PLUMBING PLAN
1
SCALE: 1/4" = 1'-0"
FIRST FLOOR PLUMBING PLAN
10/03/17