Loading...
HomeMy WebLinkAboutB17-0282_P102_1507064487.pdf2" HOT TUB DRAIN 2" WASTE DOWN IN WALL BELOW 4" WASTE DOWN IN WALL BELOW 2" VENT UP WH1 DCW DHC DHW W DCW DHC DHW W W V DCW DHW W W W DHW DHW DCW W 4" WASTE DOWN IN WALL BELOW 4" WASTE DOWN IN WALL BELOW 4" WASTE FROM LEVEL ABOVE SINK WC BT LAV HW, CW & RECIRC. LINES FROM BELOW TO ABOVE CEILING SINK W/ GD RANGE 229 CFH WC WC WC LAV LAV LAV BT WB1 RVB1 GENERAL NOTES: 1. CONTRACTOR TO FIELD VERIFY ALL EXISTING PLUMBING CONDITIONS PRIOR TO ORDERING AND INSTALLATION OF NEW PLUMBING EQUIPMENT/SYSTEMS. NOTIFY ENGINEER IN WRITING WITH ANY DRAWING/DESIGN DISCREPANCIES. 2. FIELD VERIFY LOCATIONS OF ALL SANITARY WASTE, GAS AND WATER RISERS IN/ON WALLS PRIOR TO INSTALLATION. WOOD BURNING FIREPLACE RVB1 DW LAV RVB1 LAV LAUN. LAV BT RVB1 BBQ 200 CFH DW DW 1" GAS LINE BELOW WINDOW IN WALL FROM BELOW WB1 WW 1" GAS LINE FROM BELOW 3"AD1 GAS LINE UP TO FIREPLACE ABOVE GAS LINE FROM BELOW (N) 3/4" GAS LINE FROM BELOW TO QUICK DISCONNECT IN WALL UNDER WINDOW, QUICK DISCONNECT, 100 CFH (N) 3/4" GAS LINE FROM BELOW TO QUICK DISCONNECT IN WALL UNDER WINDOW, QUICK DISCONNECT, 100 CFH (N) 3/4" GAS LINE FROM BELOW TO QUICK DISCONNECT IN WALL UNDER WINDOW, QUICK DISCONNECT, 100 CFH 2" PLANTER DRAIN (TYP.) 2" BELOW 3"AD1 3"AD1 3"AD1 3"AD1 3"AD1 3" STORM DOWN, SEE LEVEL BELOW FROM GUTTER ABOVE 3"FROM GUTTER ABOVE 3"FROM GUTTER ABOVE 3"FROM GUTTER ABOVE 3"FROM GUTTER ABOVE 3"FROM GUTTER ABOVE 3"FROM GUTTER ABOVE 3"FROM GUTTER ABOVE 3"FROM GUTTER ABOVE 3"FROM GUTTER ABOVE G ST ST W DCW DHC DHW W DCW 3" STORM DOWN, SEE LEVEL BELOW 3" STORM DOWN, SEE LEVEL BELOW 3" STORM DOWN, SEE LEVEL BELOW 3" STORM DOWN, SEE LEVEL BELOW 3" STORM DOWN, SEE LEVEL BELOW GAS LINE FROM BELOW FIREPLACE 229 CFH G GAS LINE DOWN GAS LINE UP SINK 4" WASTE FROM ABOVE, PROVIDE WCO AT BASE W/ GD SINK W/ GD P102 SECOND FLOOR PLUMBING PLAN 1 SCALE: 1/4" = 1'-0" SECOND FLOOR PLUMBING PLAN 10/03/17