HomeMy WebLinkAboutB17-0282_P102_1507064765.pdf2" HOT TUB DRAIN
2" WASTE
DOWN IN
WALL
BELOW
4" WASTE DOWN
IN WALL BELOW
2" VENT
UP
WH1
DCW
DHC
DHW
W
DCW
DHC
DHW
W
W
V
DCW
DHW
W W
W
DHW
DHW
DCW
W
4" WASTE DOWN
IN WALL BELOW
4" WASTE DOWN
IN WALL BELOW
4" WASTE FROM
LEVEL ABOVE
SINK
WC
BT
LAV
HW, CW & RECIRC. LINES
FROM BELOW TO ABOVE
CEILING
SINK W/
GD
RANGE
229 CFH
WC
WC
WC LAV
LAV
LAV
BT
WB1
RVB1
GENERAL NOTES:
1. CONTRACTOR TO FIELD VERIFY ALL EXISTING PLUMBING CONDITIONS
PRIOR TO ORDERING AND INSTALLATION OF NEW PLUMBING
EQUIPMENT/SYSTEMS. NOTIFY ENGINEER IN WRITING WITH ANY
DRAWING/DESIGN DISCREPANCIES.
2. FIELD VERIFY LOCATIONS OF ALL SANITARY WASTE, GAS AND WATER
RISERS IN/ON WALLS PRIOR TO INSTALLATION.
WOOD BURNING
FIREPLACE
RVB1
DW
LAV
RVB1
LAV
LAUN.
LAV
BT
RVB1
BBQ
200 CFH
DW
DW
1" GAS LINE BELOW WINDOW
IN WALL FROM BELOW
WB1
WW
1" GAS LINE
FROM BELOW
3"AD1
GAS LINE UP TO
FIREPLACE ABOVE GAS LINE FROM BELOW
(N) 3/4" GAS LINE FROM
BELOW TO QUICK
DISCONNECT IN WALL
UNDER WINDOW, QUICK
DISCONNECT, 100 CFH
(N) 3/4" GAS LINE FROM
BELOW TO QUICK
DISCONNECT IN WALL
UNDER WINDOW, QUICK
DISCONNECT, 100 CFH
(N) 3/4" GAS LINE FROM
BELOW TO QUICK
DISCONNECT IN WALL
UNDER WINDOW, QUICK
DISCONNECT, 100 CFH
2" PLANTER
DRAIN (TYP.)
2" BELOW
3"AD1
3"AD1
3"AD1
3"AD1
3"AD1
3" STORM DOWN,
SEE LEVEL BELOW
FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
3"FROM
GUTTER
ABOVE
G
ST
ST W
DCW
DHC
DHW
W
DCW
3" STORM DOWN,
SEE LEVEL BELOW
3" STORM DOWN,
SEE LEVEL BELOW
3" STORM DOWN,
SEE LEVEL BELOW
3" STORM DOWN,
SEE LEVEL BELOW
3" STORM DOWN,
SEE LEVEL BELOW
GAS LINE
FROM BELOW
FIREPLACE
229 CFH
G
GAS LINE
DOWN
GAS
LINE
UP
SINK
4" WASTE FROM ABOVE,
PROVIDE WCO AT BASE
W/ GD
SINK
W/ GD
P102
SECOND FLOOR
PLUMBING PLAN
1
SCALE: 1/4" = 1'-0"
SECOND FLOOR PLUMBING PLAN
10/03/17