Loading...
HomeMy WebLinkAboutB17-0124_Narrative_1492623785.pdf90 BENCHMARK ROAD SUITE 207 PO BOX 5300 AVON, CO 81620 970/949-5200 FAX 949-5205 March 3, 2017 To: Johnathan Spence / Chief of Planning Community Development Department Town of Vail From: Chris Juergens /VMDA Re: Attachment to Application for Design Review of Deck & Stair Replacement of Buildings 1-14 This DRB Application requests campus-wide approval for exterior Decks and Stairs at buildings 1-14 which will be completed this year. The colors and materials proposed, match the previously approved buildings. The materials include: decks, stairs, guardrails, handrails and siding where damaged. The colors proposed are to match the existing colors. Building One (1) has been submitted as it is a complete replacement of the Decks and Stairs. The remainder of the Buildings 2-14 have a variety of components that need to be addressed all of which are within the scope of Building One (1). A Building Matrix is attached to this application for reference to the work being done by Building. We can submit all of the buildings at your request which will be approximately 60 sheets. Thank you for these considerations as requested. We respectfully request your approval of the Proposed Materials & Colors as described above for the Sandstone 70 Decks and Stairs. END VAIL RACQUET CLUB DRB APPLICATION ATTACHMENT.