HomeMy WebLinkAboutDRB17-0318_action_form_drb_08-01-2017_5980ce78c6ed7-0_1501615560.pdfACTION FORM
Design Review Board (DRB)
Department of Community Development
75 South Frontage Road West
Vail, CO 81657
Tel: 970-479-2139
www.vailgov.com
Project Name:Eagle River Water Sanitation
Solar Conversion 2017 Application Number:DRB17-0318
Application Type:Exterior Alteration Date Applied:07/21/2017
Project Description:
The Eagle River Water & Sanitation District's (‘District’) Vail Solar Conversion -
Gold Peak/Tank 3 project consists of converting existing 24 volt solar equipment
to 120 volt electric power. The solar conversion is part of the systematic
approach of implementing the design upgrades for the District’s RTU system. The
existing Remote Terminal Unit (RTU) equipment will be connected to the new
electrical services. The upgrades will increase the reliability of the telemetry
system and standardize the equipment throughout the distribution system. In
order to construct the new RTU system at the Gold Peak/Tank 3 site, two 1" new
HDPE buried conduit are required to be installed by 360 Civil, Inc. through the
District’s tank parcel and Vail Corp’s parcel in order to connect to the existing
electrical vault located by the magic carpet lift 29. A new electrical service stand
will be placed next to the existing transformers and pull boxes will be installed for
the new electrical service. Construction for this project is anticipated to start
August 1st or earlier if possible.
CONTACTS
Contact Type:Applicant
Full Name:Eagle River Water & Sanitation District (Becky Peterson)
Address:846 Forest Road Vail, CO 81657 Phone:9704767480
Contact Type:Property Owner
Full Name:EAGLE RIVER WATER & SANITATION DISTRICT
Address:Phone:9704767480
Project Address:590 VAIL VALLEY DR (210108100003) (210108100003)
Job Site Location:
Legal Description:Subdivision:UNPLATTED Lot:No Data Block:No
Data
Parcel Number:210108100003
BOARDS/STAFF ACTION
Motion By:Action:Staff Approved
Second By:
Vote:Date:08/01/2017
Conditions:
- Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail
building personnel prior to construction activities.
- Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant
to the Vail Town Code, Chapter 12-3-3 Appeals.
- Approval of this project shall lapse and become void one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
Planner: Jonathan Spence