Loading...
HomeMy WebLinkAboutPEC17-0031_A1.01_1506638820.pdfUP UP DN UP DN UP DN DN UP A2.013 1 2 3 5 7 8 9 11 12 4 A B C D 13 14 CONFERENCE 107 STORAGE 110 MECHANICAL 111 SECURE VESTIBULE 112 STORAGE 113 1ST GRADE CLASSROOM 133 832 SF Occupancy E 1ST GRADE CLASSROOM 134 832 SF Occupancy E SMALL GROUP SPACE 135 ADMINISTRATION RECEPTION 136 KINDERGARTEN CLASSROOM 139 915 SF Occupancy E JANITOR 141 CHANGING ROOM 146 SPECIAL EDUCATION CLASSROOM 147 GYM 150 STAGE/ MUSIC 151 PRINCIPAL'S OFFICE 160 KINDERGARTEN CLASSROOM 169 917 SF Occupancy E STORAGE 170 BOY'S RR 171 PRE-K CLASSROOM 174 852 SF Occupancy E PRE-K CLASSROOM 175 851 SF Occupancy E TEACHER WORK SPACE 178 TEACHER WK RM 181 TEACHER WK RM 182 108 SF Occupancy E STORAGE 191 6 A2.02 3 ELEV 10 W/D WATER ENTRY 262 STAGE STORAGE 263 GIRL'S RR 271 U/C REFR HEALTH 255 GYM OFFICE 264 TABLE STORAGE 276 COMMONS 277 SERVING LINE 273 24' - 0" 216' - 0" 31' - 0" 12' - 0" 31' - 0" 1 1 1 4 11 11 12 15 16 IT ROOM 278 IDF ROOM 279 24 26 20 24 13 3 19 17 STORAGE 114 TEACHER WORK AND BREAK ROOM 121 COUNSELING OFFICE 120 A2.02 2 A2.03 3 A2.02 4 A2.03 1 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 31' - 0" 64' - 0" / 1 A1.02 / 1 A1.03 SHELVES AREA OF ADDITION AREA OF ADDITION AREA OF ADDITION 3 A3.01 1 A3.01 2 A3.01 / 1 A1.02 / 1 A1.03 CONFERENCE ROOM 2 125 LAUNDRY ROOM 138 SHELVES LOADING DOCK FLOOR PLAN GENERAL NOTES: 1. PATCH EXISTING CONSTRUCTION SCHEDULED TO REMAIN. REPAIRED SURFACES TO BE FLUSH WITH ADJACENT FINISH SURFACES. TO SAME QUALITY AS NEW CONSTRUCTION PRIOR TO INSTALLING NEW FINISHES. REFER TO THE FINISH MANUFACTURER'S GUIDELINES FOR INSTALLATION. 2. PATCH EXISTING FIRE-RATED WALLS, FLOOR CEILINGS, ETC. SO AS TO MAINTAIN THE FIRE-RADIATING. ADD FIRE-SMOKE DAMPERS WHERE NEW DUCTS CROSS. ADD FIRE STOP AT ALL 3. PATCH WALLS AT REMOVED RECEPTACLE OPENINGS SO AS TO RECEIVE SUBSEQUENT WORK. 4. PATCH AND LEVEL FLOOR SUBSTRATES TO RECEIVE NEW WORK AS SCHEDULED. 5. COORDINATE ALL FLOOR CORE DRILLING WITH EXISTING. 6. DO NOT SCALE DRAWINGS. 7. IN ROOMS WITH FLOOR DRAINS, SLOPE CONCRETE SURFACE WITHIN 18" RADIUS AT 1/4" PER FOOT TOWARD FLOOR DRAIN, UNLESS OTHERWISE INDICATED. 8. ALL SPOT ELEVATIONS SHOWN ON THE FLOOR PLANS OUTSIDE THE BUILDING RELATE TO USGS ELEVATIONS. ALL SPOT ELEVATIONS INSIDE THE BUILDING REFER TO BUILDING REFERENCE ELEVATIONS. NOTIFY ARCHITECT IMMEDIATELY SHOULD CONDITIONS BE FOUND CONTRADICTORY TO THESE DRAWINGS. 0' - 0" - 8742' 9. ALL ANGLES SHOWN ON THE FLOOR PLANS ARE 90 DEGREES UNLESS OTHERWISE NOTED. 10. ALL DIMENSIONS ARE TO GRID LINE, FACE OF CONCRETE OR MASONRY, OR FACE OF GYPSUM BOARD, UNLESS OTHERWISE NOTED. 11. ALL FLOOR PLAN DIMENSIONS TO MASONRY ARE NOMINAL DIMENSIONS, UNLESS NOTED AS ACTUAL. 12. "TB" NEW CORK TACKBOARDS OR "MB" NEW MARKERBOARDS W/ LENGTH. SQUARE FOOTAGE SUMMARY: EXISTING SQUARE FOOTAGE NEW SQUARE FOOTAGE MAIN LEVEL - 28,389 SF MAIN LEVEL - 31,373 SF SECOND LEVEL - 27,141 SF SECOND LEVEL - 29,987 SF TOTAL SF - 55,530 SF TOTAL SF - 61,360 SF TOTAL DIFFERENCE = 5,830 SF 1. ADDITION AT ENTRY OF SCHOOL ADDING A NEW SECURE VESTIBULE WITH DISCTRICT STANDARD SECURITY FEATURES AND CAMERAS, WITH PUSH BUTTON ACCESS AT BOTH ADMIN WOR STATIONS. ENTRY WINDOWS AND DOORS TO HAVE BULLET PROOF SECURITY GLAZING. SURRONDING WALL ASSEMBLIES TO EXTEND TO METAL DECK ABOVE FOR SAFETY. 2. NEW COMMONS (CAFETERIA) AND LERNING COMMONS (LIBRARY) ADDITION CREATED AT THE FRONT OF THE SCHOOL. ALL NEW INTERIOR AND EXTERIOR FINISHES. FINISH FLOOR TO BE LVT. EXISTING BOOK STACKS TO BE REUSED. 3. NEW ADDITION EXTENDING THE MAIN LEVEL SOUTH BUILDING FACE TO BE FLUSH WITH THE EXISTING SECOND LEVEL SOUTH BUILDING FACE. ADDITION ADDS SQUARE FOOTAGE TO CLASSROOMS. 4. ADDITION AT SECOND LEVEL OVER EXISTING MECHANICAL ROOM. NEW EXTERIOR WALL WILL BEAR ON THE EXISTING STRUCTURAL, CONCRETE WALL OF THE MAIN LEVEL MECHANICAL ROOM. REFER TO STRUCTURAL NARRATIVE FOR MORE INFORMATION. 5. ALL RENOVATED SPACES WILL INCLUDE NEW FINISH FLOOR (VCT AND ABRASIVE ACTION IN CLASSROOMS; NEW VCT IN COMMON SPACES). ALL PAINTABLE SURFACES WILL BE REPAINTED. 6. ALL CLASSROOMS AND CORRIDORS WILL HAVE NEW ACT CEILING GRID AND CEILING TILES. 7. NEW PLUMBING FIXTURE AND FIXTURE LAYOUT CREATING ACCESSIBLE RESTROOMS. 8. NEW UPPER CABINET AND LOWER CABINET CASEWORK INSTALLED IN ALL CLASSROOMS. 9. RENOVATION AT EXISTING KITCHEN, REVISING THE EXISTING VENT HOOD LOCATION. INSTALL A NEW WALK-IN COOLER AND WALK-IN FREEZER. ALL NEW KITCHEN EQUIPMENT AND SERVING LINE EQUIPMENT. REFER TO KITCHEN DRAWINGS FOR MORE INFORMATION. 10. NEW CLASSROOM AND STAGE. RENOVATIONS TO EXISTING STAGE EQUIPMENT WITH THE ADDITION OF NEW CLASSROOM EQUIPMENT. REFER TO THEATHER DRAWINGS FOR MORE INFORMATION. 11. SECOND LEVEL CORRIDOR RENOVATIONS INCLUDE REVISING THE EXISTING FLOOR OPENINGS TO MAIN LEVEL. REFER TO STRUCTURAL NARRATIVE FOR MORE INFORMATION. 12. NEW MECHANICAL SYSTEMS THROUGHOUT ALL RENOVATED AND ADDITION SPACES. REFER TO MECHANICAL NARRATIVE AND DRAWINGS FOR MORE INFORMATION ON SYSTEM OPTIONS. GENERAL SCOPE OF WORK: Architecture Engineering Planning Interiors © , DLR Group inc., a Colorado corporation, ALL RIGHTS RESERVED LEGEND NOTES LEGEND NOTES ARE COMMON TO ALL SOME NOTES MAY NOT APPLY TO THIS SHEET Revisions STAMP NORTH 56 Edwards Village Blvd Suite 210 Edwards, CO 816362 970-766-1740 20178/25/2017 5:13:39 AM C:\Users\rachel\Documents\1627.02 RSES Bldg_CENTRAL_rachelXFKHW.rvt 1627.02 Red Sandstone Elementary School Renovation and Parking Garage - Vail Potato Patch Block 2 Lot 8 SCHEMATIC DESIGN SET Main Level Overall Floor Plan A1.01 08/28/17 551 N Frontage Rd West Vail, CO 81657 1/16" = 1'-0" A1.01 1 Main Level Overall Floor Plan 0 32 48 64 16 SCALE: 1/16" = 1'-0" FLOOR PLANS TAG NOTE LEGEND TAG NOTE PEC APPROVED 9/11/2017 12:00:00 AM