Loading...
HomeMy WebLinkAboutPEC17-0031_A1.06_1506638820.pdfDN UP UP 11 12 A B C D 13 14 A2.02 3 10 VAIL REC SPACE 229 TEACHER WORKSPACE 228 LEARNING COMMONS 230 1042 SF Occupancy E MAKER'S STORAGE 212 MAKER'S SPACE 214 4th GRADE CLASSROOM 215 TEACHER WORKSPACE 216 SMALL GROUP ROOM 232 MULTI-COPY STORAGE 233 Learning Commons Stacks 253 OPEN TO BELOW BUILT-IN CUBBIES MECHANICAL SPACE ROOF BELOW ROOF BELOW ROOF BELOW OPEN TO BELOW OPEN TO BELOW 3' - 3" BUILT-IN STORAGE SHELVES 111' - 1" 111' - 1"/ 1 A1.05 / 1 A1.05 111' - 1" 111' - 1" 3 A3.01 2 A3.01 A229 A214 A203 A203 A232 3D PRINTER AREA ROOF BELOW ROOF BELOW A239 FLOOR PLAN GENERAL NOTES: 1. PATCH EXISTING CONSTRUCTION SCHEDULED TO REMAIN. REPAIRED SURFACES TO BE FLUSH WITH ADJACENT FINISH SURFACES. TO SAME QUALITY AS NEW CONSTRUCTION PRIOR TO INSTALLING NEW FINISHES. REFER TO THE FINISH MANUFACTURER'S GUIDELINES FOR INSTALLATION. 2. PATCH EXISTING FIRE-RATED WALLS, FLOOR CEILINGS, ETC. SO AS TO MAINTAIN THE FIRE-RADIATING. ADD FIRE-SMOKE DAMPERS WHERE NEW DUCTS CROSS. ADD FIRE STOP AT ALL 3. PATCH WALLS AT REMOVED RECEPTACLE OPENINGS SO AS TO RECEIVE SUBSEQUENT WORK. 4. PATCH AND LEVEL FLOOR SUBSTRATES TO RECEIVE NEW WORK AS SCHEDULED. 5. COORDINATE ALL FLOOR CORE DRILLING WITH EXISTING. 6. DO NOT SCALE DRAWINGS. 7. IN ROOMS WITH FLOOR DRAINS, SLOPE CONCRETE SURFACE WITHIN 18" RADIUS AT 1/4" PER FOOT TOWARD FLOOR DRAIN, UNLESS OTHERWISE INDICATED. 8. ALL SPOT ELEVATIONS SHOWN ON THE FLOOR PLANS OUTSIDE THE BUILDING RELATE TO USGS ELEVATIONS. ALL SPOT ELEVATIONS INSIDE THE BUILDING REFER TO BUILDING REFERENCE ELEVATIONS. NOTIFY ARCHITECT IMMEDIATELY SHOULD CONDITIONS BE FOUND CONTRADICTORY TO THESE DRAWINGS. 0' - 0" - 8742' 9. ALL ANGLES SHOWN ON THE FLOOR PLANS ARE 90 DEGREES UNLESS OTHERWISE NOTED. 10. ALL DIMENSIONS ARE TO GRID LINE, FACE OF CONCRETE OR MASONRY, OR FACE OF GYPSUM BOARD, UNLESS OTHERWISE NOTED. 11. ALL FLOOR PLAN DIMENSIONS TO MASONRY ARE NOMINAL DIMENSIONS, UNLESS NOTED AS ACTUAL. 12. "TB" NEW CORK TACKBOARDS OR "MB" NEW MARKERBOARDS W/ LENGTH. SQUARE FOOTAGE SUMMARY: EXISTING SQUARE FOOTAGE NEW SQUARE FOOTAGE MAIN LEVEL - 28,389 SF MAIN LEVEL - 31,373 SF SECOND LEVEL - 27,141 SF SECOND LEVEL - 29,987 SF TOTAL SF - 55,530 SF TOTAL SF - 61,360 SF TOTAL DIFFERENCE = 5,830 SF 1. ADDITION AT ENTRY OF SCHOOL ADDING A NEW SECURE VESTIBULE WITH DISCTRICT STANDARD SECURITY FEATURES AND CAMERAS, WITH PUSH BUTTON ACCESS AT BOTH ADMIN WOR STATIONS. ENTRY WINDOWS AND DOORS TO HAVE BULLET PROOF SECURITY GLAZING. SURRONDING WALL ASSEMBLIES TO EXTEND TO METAL DECK ABOVE FOR SAFETY. 2. NEW COMMONS (CAFETERIA) AND LERNING COMMONS (LIBRARY) ADDITION CREATED AT THE FRONT OF THE SCHOOL. ALL NEW INTERIOR AND EXTERIOR FINISHES. FINISH FLOOR TO BE LVT. EXISTING BOOK STACKS TO BE REUSED. 3. NEW ADDITION EXTENDING THE MAIN LEVEL SOUTH BUILDING FACE TO BE FLUSH WITH THE EXISTING SECOND LEVEL SOUTH BUILDING FACE. ADDITION ADDS SQUARE FOOTAGE TO CLASSROOMS. 4. ADDITION AT SECOND LEVEL OVER EXISTING MECHANICAL ROOM. NEW EXTERIOR WALL WILL BEAR ON THE EXISTING STRUCTURAL, CONCRETE WALL OF THE MAIN LEVEL MECHANICAL ROOM. REFER TO STRUCTURAL NARRATIVE FOR MORE INFORMATION. 5. ALL RENOVATED SPACES WILL INCLUDE NEW FINISH FLOOR (VCT AND ABRASIVE ACTION IN CLASSROOMS; NEW VCT IN COMMON SPACES). ALL PAINTABLE SURFACES WILL BE REPAINTED. 6. ALL CLASSROOMS AND CORRIDORS WILL HAVE NEW ACT CEILING GRID AND CEILING TILES. 7. NEW PLUMBING FIXTURE AND FIXTURE LAYOUT CREATING ACCESSIBLE RESTROOMS. 8. NEW UPPER CABINET AND LOWER CABINET CASEWORK INSTALLED IN ALL CLASSROOMS. 9. RENOVATION AT EXISTING KITCHEN, REVISING THE EXISTING VENT HOOD LOCATION. INSTALL A NEW WALK-IN COOLER AND WALK-IN FREEZER. ALL NEW KITCHEN EQUIPMENT AND SERVING LINE EQUIPMENT. REFER TO KITCHEN DRAWINGS FOR MORE INFORMATION. 10. NEW CLASSROOM AND STAGE. RENOVATIONS TO EXISTING STAGE EQUIPMENT WITH THE ADDITION OF NEW CLASSROOM EQUIPMENT. REFER TO THEATHER DRAWINGS FOR MORE INFORMATION. 11. SECOND LEVEL CORRIDOR RENOVATIONS INCLUDE REVISING THE EXISTING FLOOR OPENINGS TO MAIN LEVEL. REFER TO STRUCTURAL NARRATIVE FOR MORE INFORMATION. 12. NEW MECHANICAL SYSTEMS THROUGHOUT ALL RENOVATED AND ADDITION SPACES. REFER TO MECHANICAL NARRATIVE AND DRAWINGS FOR MORE INFORMATION ON SYSTEM OPTIONS. GENERAL SCOPE OF WORK: Architecture Engineering Planning Interiors © , DLR Group inc., a Colorado corporation, ALL RIGHTS RESERVED KEY PLAN LEGEND NOTES LEGEND NOTES ARE COMMON TO ALL SOME NOTES MAY NOT APPLY TO THIS SHEET Revisions A B STAMP NORTH 56 Edwards Village Blvd Suite 210 Edwards, CO 816362 970-766-1740 20178/25/2017 5:14:20 AM C:\Users\rachel\Documents\1627.02 RSES Bldg_CENTRAL_rachelXFKHW.rvt 1627.02 Red Sandstone Elementary School Renovation and Parking Garage - Vail Potato Patch Block 2 Lot 8 SCHEMATIC DESIGN SET Second Level Area B Floor Plan A1.06 08/28/17 551 N Frontage Rd West Vail, CO 81657 1/8" = 1'-0" A1.06 1 Second Level Area B Floor Plan 0 16 24 32 8 SCALE: 1/8" = 1'-0" FLOOR PLANS TAG NOTE LEGEND TAG NOTE A203 INSTALL NEW DOOR, DOOR FRAME, AND DOOR HARDWARE A214 INSTALL NEW PARTITION WALL WITH ONE DOOR PANEL WITHIN WALL SYSTEM A229 INSTALL SLIDING GLA170724 CMGC5- RFI 061 - GC Door F103A_TAB ResponseSS DOORS, SEE NARRATIVE A232 INSTALL NEW OVERHEAD DOOR WITH GLAZING A239 INSTALL NEW FLOOR SLAB PEC APPROVED 9/11/2017 12:00:00 AM