Loading...
HomeMy WebLinkAboutPEC17-0031_A1.08_1506638820.pdfA2.01 1 1 2 3 5 7 8 9 4 A B C D 6 10 -A2.02 1 A2.02 2 112' - 7" 123' - 6" / 1 A1.09 / 1 A1.09 / 1 A1.09 R-3 (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) T/O PARAPET (E) T/O PARAPET (E) T/O PARAPET (E) T/O PARAPET (E) T/O PARAPET (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) T/O PARAPET (N) T/O PARAPET (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE 123' - 6" 123' - 6" 123' - 6"1' - 0 7/8" 61' - 2 3/4" A271 A277 A277 A271 A271 A271 A271 A271 A271 A279 112' - 7" 123' - 6" 123' - 6" 123' - 6"A271 R-1 A271 R-1 R-1 R-3 R-3 R-1 R-1 R-1 A287 A287 A287 A287 A287 A287 A287 A287 A287 A281 A281 3 A3.01 1 A3.01 R-4 A292 125' - 0" (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE 112' - 7" ROOF PLAN GENERAL NOTES: 1. EXISTING ROOFING TO BE REMOVED. ALL EXISTING ROOFING TO BE REMOVED AND REPLACED WITH FULLY ADHERED 60 MIL EPDM ON 1/2" PROTECTION BOARD ON R-40 CONTINIUOUS INSULATION. 2.REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL SCOPE. 3. INCLUDE ALTERNATE #1 FOR REPLACEMENT OF EXISTING SKYLIGHT WITH NEW KALWALL SKYLIGHT. Architecture Engineering Planning Interiors © , DLR Group inc., a Colorado corporation, ALL RIGHTS RESERVED KEY PLAN LEGEND NOTES LEGEND NOTES ARE COMMON TO ALL SOME NOTES MAY NOT APPLY TO THIS SHEET Revisions A B STAMP NORTH 56 Edwards Village Blvd Suite 210 Edwards, CO 816362 970-766-1740 20178/28/2017 8:56:33 AM C:\Users\rachel\Documents\1627.02 RSES Bldg_CENTRAL_rachelXFKHW.rvt 1627.02 Red Sandstone Elementary School Renovation + Parking Garage - Vail Potato Patch Block 2 Lot 8 SCHEMATIC DESIGN SET Area A Roof Plan A1.08 08/28/17 551 N Frontage Rd West Vail, CO 81657 1/8" = 1'-0" A1.08 1 Area A Roof Plan 0 16 24 32 8 SCALE: 1/8" = 1'-0" ROOF PLANS TAG NOTE LEGEND TAG NOTE A271 EXISTING ROOF DRAIN TO REMAIN. CONTRACTOR TO TEST DRAIN IS FULLY FUNCTIONAL AND REPLACE OR REPAIR AS NECESSARY A277 INSTALL NEW ROOF MECHANICAL EQUIPMENT A279 EXISTING MECHANICAL FLUES TO REMAIN A281 NEW 90 MIL REINFORCED EPDM ROOF A287 NEW OVERFLOW DRAIN, PIPE TO DAYLIGHT. REF MEP DWGS A292 INSTALL NEW ROOF ACCESS LADDER R-1 NEW REPLACEMENT 90 MIL REINFORCED EPDM R-3 NEW 90 MIL REINFORCED EPDM R-4 ALTERNATE #1 TO REPLACE SKYLIGHT WITH NEW KALWALL SKYLIGHT SYSTEM PEC APPROVED 9/11/2017 12:00:00 AM