Loading...
HomeMy WebLinkAboutPEC17-0031_A2.01_1506638820.pdfMain Floor 100' - 0" Second Floor 111' - 1" 1 2 3 5 7 8 9 11 12 4 13 14 Roof Plan 122' - 0" 6 10 / 1 A2.02 / 2 A2.02 (+8251.09') (+8240.10') (+8262.10') Main Floor 100' - 0" Second Floor 111' - 1" A B C D Roof Plan 122' - 0" (+8251.09') (+8240.10') (+8262.10') 3 A3.01 Main Floor 100' - 0" Second Floor 111' - 1" A B C D Roof Plan 122' - 0" (+8251.09') (+8240.10') (+8262.10') 3 A3.01 Main Floor 100' - 0" Second Floor 111' - 1" 1 2 3 5 7 8 9 11 12 4 13 14 Roof Plan 122' - 0" 212 6 10 / 1 A2.02 / 2 A2.02 X-1 X-1 X-1 EX-3 X-1 EX-3 (+8251.09') (+8240.10') (+8262.10') 1 A3.01 2 A3.01 EXTERIOR ELEVATION GENERAL NOTES: 1. EXTERIOR FINISHES INDICATED ON ELEVATIONS SEE "EXTERIOR MATERIAL LEGEND" FOR MATERIALS. 2. RFERENCE ROOF PLAN FOR LOCATIONS OF ROOF COMPONENETS NOT INDICATED ON EXTERIOR ELEVATIONS. 3. REFER TO MEP AND STRUCTURAL DRAWINGS FOR ANY ADDITIONAL WORK. 4. ASSUME ALL PAINTED SURFACES WILL BE REPAINTED. THIS INCLUDES BUT IS NOT LIMITED TO: DOORS, DOOR FRAMES, WINDOW FRAMES, AND HEADERS, CEILINGS, HANDRAILS, EXPOSED MECHANICAL, CMU ACCENTS, SOFFITS, STRUCTURAL BEAMS, AND ETC. 5. PROVIDE ALLOWANCE TO SEAL AND CAULK VARIOUS WALL PENERTRATIONS ANS HOLES AROUND EXTERIOR PERIMETER OF BUIDLING, SIMILAR AREAS SUCH AS HOSE BIBS, PIPES, ETC. 6. PROVIDE ALLOWANCE TO REVIEW ALL EXPOSED ELECTRICAL CONDUIT TO DETERMINE FEASIBILITY TO REMOVE OR RELOCATE. INCLUDE IN ALLOWANCE LABOR AND MATERIALS TO REMOVE OR RELOCATE. 7. SEE CIVIL PLANS FOR NOTE TO RESEAL ALL HORIZONTAL CONCRETE AND ASPHALT JOINTS AT BUILDING. 8. WHEN A PORTION OF A WALL IS PAINTED ASSUME THE ENTIRE WALL IS PAINTED TO INSIDE OR OUTSIDE CORNERS. 9. DO NOT SCALE DRAWINGS. 10. ALL ANGLES SHOWN ON THE FLOOR PLANS ARE 90 DEGREES UNLESS NOTED OTHERWISE. X-1 NEW STUCCO WITH INTEGRAL COLOR FINISH COAT SW 7506 LOGGIA, SAND FINISH X-8 NEW ALUMINUM WINDOW MOUNTED SOLAR SHADES, POWEDER COATED BLACK, PERFECTION HORIZONTAL X-9 NEW ARCHITECTURAL WOOD SOFFIT AND FASCIA, OLYMPIC STAINED CHOCOLATE X-2 NEW STUCCO WITH INTEGRAL COLOR FINISH COAT SW 7508 TAVERN TAUPE, SAND FINISH X-3 NEW BOARD FORMED CONCRETE VENEER PANEL, 2 STONE INDUSTRIAL,COLOR TO MATCH EXISTING BOARD FORMED CONCRETE X-4 NEW DRY STACK LIMESTONE, #24 W HUDSON SHELL BUFF CHOPPED FINISH X-5 NEW NICHIHA FIBER CEMENT BOARD PANEL IN STYLE VINTAGE WOOD, CEDAR. INSTALLED HORIZONTALLY X-7 NEW GLULAM LAMINATED TIMBER, OLYMPIC STAIN CHOCLATE EXTERIOR MATERIAL LEGEND: EX-3 EXISTING BOARD FORMED CONCRETE R-2 NEW STANDING SEAM METAL ROOF, BERRIDGE DARK BRONZE KYNAR 500 Architecture Engineering Planning Interiors © , DLR Group inc., a Colorado corporation, ALL RIGHTS RESERVED LEGEND NOTES LEGEND NOTES ARE COMMON TO ALL SOME NOTES MAY NOT APPLY TO THIS SHEET Revisions STAMP 56 Edwards Village Blvd Suite 210 Edwards, CO 816362 970-766-1740 20178/28/2017 8:57:01 AM C:\Users\rachel\Documents\1627.02 RSES Bldg_CENTRAL_rachelXFKHW.rvt 1627.02 Red Sandstone Elementary School Renovation + Parking Garage - Vail Potato Patch Block 2 Lot 8 SCHEMATIC DESIGN SET Exterior Elevations A2.01 08/28/17 551 N Frontage Rd West Vail, CO 81657 1/16" = 1'-0" A2.01 1 South Elevation 1/16" = 1'-0" A2.01 3 West Elevation 1/16" = 1'-0" A2.01 2 East Elevation 1/16" = 1'-0" A2.01 4 North Elevation 0 32 48 64 16 SCALE: 1/16" = 1'-0" EXTERIOR ELEVATIONS TAG NOTE LEGEND TAG NOTE EX-3 EXISTING BOARD FORMED CONCRETE X-1 NEW STUCCO WITH INTERGRAL COLOR FINISH COAT, COLOR SIMILAR TO AS SHOWN PEC APPROVED 9/11/2017 12:00:00 AM