Loading...
HomeMy WebLinkAboutPEC17-0031_G0.02_1506638820.pdfArchitecture Engineering Planning Interiors © , DLR Group inc., a Colorado corporation, ALL RIGHTS RESERVED Revisions ENGINEER'S STAMP NORTH 56 Edwards Village Blvd Suite 210 Edwards, CO 816362 970-766-1740 20176/26/2017 8:05:14 AM C:\Users\rachel\Documents\1627.02 RSES Bldg_CENTRAL_rachelXFKHW.rvt 1627.02 Red Sandstone Elementary School Renovation + Parking Garage - Vail Potato Patch Block 2 Lot 8 SCHEMATIC DESIGN SET Existing Site Photos G0.02 06/22/17 551 N Frontage Rd West Vail, CO 81657 VIEW OF EXISTING BUILDING LOOKING NORTHWEST EXISTING BUILDING FROM ENTRY DRIVE VIEW OF EXISTING BUILDING FROM PEDESTRIAN BRIDGE VIEW FROM EXISTING BUS STOP EXISTING BUILDING LOOKING WEST VIEW OF EXISTING BUILDING LOOKING EAST NORTH SIDE OF EXISTING BUILDING WEST SIDE OF EXISTING BUILDING VIEW OF EXISTING CIRCLE DRIVE PEC APPROVED 9/11/2017 12:00:00 AM