Loading...
HomeMy WebLinkAboutB16-0491_DRB COMMENTS_1501518287.pdfDRB COMMENTS #11 M1 Criss Dickhausen 12/20/16 1:46 PMNo TypeNo State It appears that this document does not show all of the elements to comply with current IECC requirements - please revise and include all R-values, U-factors, etc. Repy: Refer to sheet M2 containing REScheck information S00 Florencio (JR) Mondragon 2/1/17 2:29 PMNo TypeNo State special inspection listed Reply: Refer to Sheet S10 for special inspection. S21 Criss Dickhausen 1/27/17 7:19 PMNo TypeNo State Provide structural design for guard including attachment and design pressure. Reply: Per discussion with JR, this is not necessary S24 Criss Dickhausen 1/27/17 7:17 PMNo TypeNo State Provide structural design for roof. Reply: Refer to Sheet S2.3 07/31/17