HomeMy WebLinkAboutB16-0491_DRB COMMENTS_1501518287.pdfDRB COMMENTS #11
M1
Criss Dickhausen
12/20/16 1:46 PMNo TypeNo State
It appears that this document does not show all of the elements to comply with current IECC requirements - please
revise and include all R-values, U-factors, etc.
Repy: Refer to sheet M2 containing REScheck information
S00
Florencio (JR) Mondragon
2/1/17 2:29 PMNo TypeNo State
special inspection listed
Reply: Refer to Sheet S10 for special inspection.
S21
Criss Dickhausen
1/27/17 7:19 PMNo TypeNo State
Provide structural design for guard including attachment and design pressure.
Reply: Per discussion with JR, this is not necessary
S24
Criss Dickhausen
1/27/17 7:17 PMNo TypeNo State
Provide structural design for roof.
Reply: Refer to Sheet S2.3
07/31/17