HomeMy WebLinkAboutB16-0491_M2_1501518284.pdf07/31/17
Inspection Checklist
Requirements: 84.0% were addressed directly in the REScheck software
REScheck Software Version 4.6.3
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Pre-Inspection/Plan Review
Plans Verified
Value
Field Verified
Value
Complies? Comments/Assumptions
103.1,
103.2
[PR1]1
Construction drawings and
documentation demonstrate
energy code compliance for the
building envelope. Thermal
envelope represented on
construction documents.
Complies
Does Not
Not Observable
Not Applicable
103.1,
103.2,
403.7
[PR3]1
Construction drawings and
documentation demonstrate
energy code compliance for
lighting and mechanical systems.
Systems serving multiple
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
Complies
Does Not
Not Observable
Not Applicable
302.1,
403.7
[PR2]2
Heating and cooling equipment is
sized per ACCA Manual S based
on loads calculated per ACCA
Manual J or other methods
approved by the code official.
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Vail Row House #11
Data filename: S:\BGProjects\9762.00 Vail Row Houses # 11 &
12\Engineering\Mechanical\Calculations\REScheck\Vail Row House #11.rck
Page 2 of 9
01/10/17
Report date:
07/31/17
Section
#
& Req.ID
Foundation Inspection
Plans Verified
Value
Field Verified
Value
Complies? Comments/Assumptions
402.1.2
[FO1]1
Slab edge insulation R-value. R-_____
Unheated
Heated
R-_____
Unheated
Heated
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.2
[FO3]1
Slab edge insulation
depth/length.
_____ ft _____ ft Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.1
[FO4]1
Conditioned basement wall
insulation R-value. Where interior
insulation is used, verification
may need to occur during
Insulation Inspection. Not
required in warm-humid locations
in Climate Zone 3.
R-_____
R-_____
R-_____
R-_____
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[FO5]1
Conditioned basement wall
insulation installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.2.9
[FO6]1
Conditioned basement wall
insulation depth of burial or
distance from top of wall.
_____ ft _____ ft Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2.1
[FO11]2
A protective covering is installed
to protect exposed exterior
insulation and extends a
minimum of 6 in. below grade.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.9
[FO12]2
Snow- and ice-melting system
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Vail Row House #11
Data filename: S:\BGProjects\9762.00 Vail Row Houses # 11 &
12\Engineering\Mechanical\Calculations\REScheck\Vail Row House #11.rck
Page 3 of 9
01/10/17
Report date:
07/31/17
Section
#
& Req.ID
Framing / Rough-In Inspection
Plans Verified
Value
Field Verified
Value
Complies? Comments/Assumptions
402.1.1,
402.3.1,
402.3.3,
402.3.6,
402.5
[FR2]1
Glazing U-factor (area-weighted
average).
U-_____ U-_____ Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.3
[FR4]1
U-factors of fenestration products
are determined in accordance
with the NFRC test procedure or
taken from the default table.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.1.1
[FR10]1
Mass wall exterior insulation R-
value. If more than ½ of the
insulation is on the wall interior,
the interior insulation
requirement applies and
verification may need to occur
during Insulation Inspection.
R-_____ R-_____ Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[FR11]1
Mass wall exterior insulation
installed per manufacturer’s
instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.1.1
[FR23]1
Air barrier and thermal barrier
installed per manufacturer’s
instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.3
[FR20]1
Fenestration that is not site built
is listed and labeled as meeting
AAMA /WDMA/CSA 101/I.S.2/A440
or has infiltration rates per NFRC
400 that do not exceed code
limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.5
[FR16]2
IC-rated recessed lighting fixtures
sealed at housing/interior finish
and labeled to indicate ≤2.0 cfm
leakage at 75 Pa.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.2.1
[FR12]1
Supply and return ducts in attics
insulated >= R-8 where duct is
>= 3 inches in diameter and >=
R-6 where < 3 inches. Supply and
return ducts in other portions of
the building insulated >= R-6 for
diameter >= 3 inches and R-4.2
for < 3 inches in diameter.
Complies
Does Not
Not Observable
Not Applicable
Exception: Ducts located
completely inside the
building envelope.
403.3.3.5
[FR15]3
Building cavities are not used as
ducts or plenums.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4
[FR17]2
HVAC piping conveying fluids
above 105 ºF or chilled fluids
below 55 ºF are insulated to ≥R-
3.
R-_____ R-_____ Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4.1
[FR24]1
Protection of insulation on HVAC
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Vail Row House #11
Data filename: S:\BGProjects\9762.00 Vail Row Houses # 11 &
12\Engineering\Mechanical\Calculations\REScheck\Vail Row House #11.rck
Page 4 of 9
01/10/17
Report date:
07/31/17
Section
#
& Req.ID
Framing / Rough-In Inspection
Plans Verified
Value
Field Verified
Value
Complies? Comments/Assumptions
403.5.3
[FR18]2
Hot water pipes are insulated to
≥R-3.
R-_____ R-_____ Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.6
[FR19]2
Automatic or gravity dampers are
installed on all outdoor air
intakes and exhausts.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Vail Row House #11
Data filename: S:\BGProjects\9762.00 Vail Row Houses # 11 &
12\Engineering\Mechanical\Calculations\REScheck\Vail Row House #11.rck
Page 5 of 9
01/10/17
Report date:
07/31/17
Section
#
& Req.ID
Insulation Inspection
Plans Verified
Value
Field Verified
Value
Complies? Comments/Assumptions
303.1
[IN13]2
All installed insulation is labeled
or the installed R-values
provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.1.1,
402.2.5,
402.2.6
[IN3]1
Wall insulation R-value. If this is a
mass wall with at least ½ of the
wall insulation on the wall
exterior, the exterior insulation
requirement applies (FR10).
R-_____
Wood
Mass
Steel
R-_____
Wood
Mass
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[IN4]1
Wall insulation is installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Vail Row House #11
Data filename: S:\BGProjects\9762.00 Vail Row Houses # 11 &
12\Engineering\Mechanical\Calculations\REScheck\Vail Row House #11.rck
Page 6 of 9
01/10/17
Report date:
07/31/17
Section
#
& Req.ID
Final Inspection Provisions
Plans Verified
Value
Field Verified
Value
Complies? Comments/Assumptions
402.1.1,
402.2.1,
402.2.2,
402.2.6
[FI1]1
Ceiling insulation R-value. R-_____
Wood
Steel
R-_____
Wood
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.1.1,
303.2
[FI2]1
Ceiling insulation installed per
manufacturer’s instructions.
Blown insulation marked every
300 ft².
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.2.3
[FI22]2
Vented attics with air permeable
insulation include baffle adjacent
to soffit and eave vents that
extends over insulation.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.2.4
[FI3]1
Attic access hatch and door
insulation ≥R-value of the
adjacent assembly.
R-_____ R-_____ Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.1.2
[FI17]1
Blower door test @ 50 Pa. <=5
ach in Climate Zones 1-2, and
<=3 ach in Climate Zones 3-8.
ACH 50 =_____ ACH 50 =_____ Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.2.3
[FI4]1
Duct tightness test result of <=4
cfm/100 ft2 across the system or
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in
tests, verification may need to
occur during Framing Inspection.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.2
[FI27]1
Ducts are pressure tested to
determine air leakage with
either: Rough-in test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the system including
the manufacturer’s air handler
enclosure if installed at time of
test. Postconstruction test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer’s air
handler enclosure.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.2.1
[FI24]1
Air handler leakage designated
by manufacturer at <=2% of
design air flow.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.1
[FI9]2
Programmable thermostats
installed for control of primary
heating and cooling systems and
initially set by manufacturer to
code specifications.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.2
[FI10]2
Heat pump thermostat installed
on heat pumps.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.5.1
[FI11]2
Circulating service hot water
systems have automatic or
accessible manual controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Vail Row House #11
Data filename: S:\BGProjects\9762.00 Vail Row Houses # 11 &
12\Engineering\Mechanical\Calculations\REScheck\Vail Row House #11.rck
Page 7 of 9
01/10/17
Report date:
07/31/17
Section
#
& Req.ID
Final Inspection Provisions
Plans Verified
Value
Field Verified
Value
Complies? Comments/Assumptions
403.6.1
[FI25]2
All mechanical ventilation system
fans not part of tested and listed
HVAC equipment meet efficacy
and air flow limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.2
[FI26]2
Hot water boilers supplying heat
through one- or two-pipe heating
systems have outdoor setback
control to lower boiler water
temperature based on outdoor
temperature.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.1
[FI28]2
Heated water circulation systems
have a circulation pump. The
system return pipe is a dedicated
return pipe or a cold water supply
pipe. Gravity and thermos-
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.2
[FI29]2
Electric heat trace systems
comply with IEEE 515.1 or UL
515. Controls automatically
adjust the energy input to the
heat tracing to maintain the
desired water temperature in the
piping.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.5.2
[FI30]2
Water distribution systems that
have recirculation pumps that
pump water from a heated water
supply pipe back to the heated
water source through a cold
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 104ºF.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.4
[FI31]2
Drain water heat recovery units
tested in accordance with CSA
B55.1. Potable water-side
pressure loss of drain water heat
recovery units < 3 psi for
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
404.1
[FI6]1
75% of lamps in permanent
fixtures or 75% of permanent
fixtures have high efficacy lamps.
Does not apply to low-voltage
lighting.
Complies
Does Not
Not Observable
Not Applicable
404.1.1
[FI23]3
Fuel gas lighting systems have
no continuous pilot light.
Complies
Does Not
Not Observable
Not Applicable
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Vail Row House #11
Data filename: S:\BGProjects\9762.00 Vail Row Houses # 11 &
12\Engineering\Mechanical\Calculations\REScheck\Vail Row House #11.rck
Page 8 of 9
01/10/17
Report date:
07/31/17
Section
#
& Req.ID
Final Inspection Provisions
Plans Verified
Value
Field Verified
Value
Complies? Comments/Assumptions
401.3
[FI7]2
Compliance certificate posted. Complies
Does Not
Not Observable
Not Applicable
303.3
[FI18]3
Manufacturer manuals for
mechanical and water heating
systems have been provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Vail Row House #11
Data filename: S:\BGProjects\9762.00 Vail Row Houses # 11 &
12\Engineering\Mechanical\Calculations\REScheck\Vail Row House #11.rck
Page 9 of 9
01/10/17
Report date:
07/31/17
2015 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
30.00
Above-Grade Wall
19.00
Below-Grade Wall
15.00
Floor
49.00
Ceiling / Roof
_______
Ductwork (unconditioned spaces):
Glass & Door Rating SHGC
U-Factor
0.32
Window
Door
Heating & Cooling Equipment Efficiency
_______
Heating System:_________________________
_______
Cooling System:_________________________
_______
Water Heater:___________________________
Name: Date:
Comments
07/31/17