Loading...
HomeMy WebLinkAboutD17-0012_A-201B.1_1512591353.pdfLEVEL 1 100' - 0" C4 A-201B.1 A-520 B5 A-520 A5 A-520 B5 A-520 A5 WS-STUCCO2A WS-STUCCO2A A-520 B4 A-520 A4 WS-STUCCO1A 19' - 8 5/8"ONCE METAL DUCT IS RE-ROUTED; PROVIDE 18 GA GALVANIZED BRAKE METAL SECURED TO BACK SIDE OF EXISTING LOUVER; FLASH BASE TO PROVIDE POSITIVE DRAINAGE TO EXTERIOR OF BUILDING. ONCE METAL DUCT IS RE-ROUTED; PROVIDE 18 GA GALVANIZED BRAKE METAL SECURED TO BACK SIDE OF EXISTING LOUVER; FLASH BASE TO PROVIDE POSITIVE DRAINAGE TO EXTERIOR OF BUILDING. 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, 1 2 3 4 5 6 A B C D E 1 2 3 4 5 6 A B C D E Sheet Title: Consultant Revision Date No. Sheet Information Project Information Original Issuance Date 9/28/2017 5:29:15 PM15924.00 A-201B.1 2017 EAST WING ADDITION 180 S. Frontage Road West, Vail, CO 81657EXTERIOR ELEVATIONS & SECTIONS - AREA B 09/28/17DP1 VAIL HEALTH 1/2" = 1'-0"C5 INFILL WALL SOUTH ELEVATION 1/2" = 1'-0"C4 WALL SECTION 1/2" = 1'-0"C3 WALL SECTION 1/2" = 1'-0" A1 WEST ELEVATION - AREA C GC TO VIF12/06/17