HomeMy WebLinkAboutD17-0012_A-201B.1_1512591353.pdfLEVEL 1
100' - 0"
C4
A-201B.1
A-520
B5
A-520
A5
A-520
B5
A-520
A5
WS-STUCCO2A
WS-STUCCO2A
A-520
B4
A-520
A4
WS-STUCCO1A
19' - 8 5/8"ONCE METAL DUCT IS RE-ROUTED;
PROVIDE 18 GA GALVANIZED BRAKE METAL SECURED
TO BACK SIDE OF EXISTING LOUVER; FLASH
BASE TO PROVIDE POSITIVE DRAINAGE
TO EXTERIOR OF BUILDING.
ONCE METAL DUCT IS RE-ROUTED;
PROVIDE 18 GA GALVANIZED BRAKE METAL SECURED
TO BACK SIDE OF EXISTING LOUVER; FLASH
BASE TO PROVIDE POSITIVE DRAINAGE
TO EXTERIOR OF BUILDING.
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP,
1 2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
A
B
C
D
E
Sheet Title:
Consultant
Revision Date
No.
Sheet Information
Project Information
Original Issuance
Date
9/28/2017 5:29:15 PM15924.00
A-201B.1
2017 EAST WING ADDITION
180 S. Frontage Road West, Vail, CO 81657EXTERIOR
ELEVATIONS &
SECTIONS - AREA
B
09/28/17DP1 VAIL HEALTH
1/2" = 1'-0"C5 INFILL WALL SOUTH ELEVATION
1/2" = 1'-0"C4 WALL SECTION
1/2" = 1'-0"C3 WALL SECTION
1/2" = 1'-0" A1 WEST ELEVATION - AREA C GC TO VIF12/06/17