Loading...
HomeMy WebLinkAboutD17-0012_A-520_1512591357.pdfINSULATION TO BE CONTINOUS TO EXISTING INSULATION SYSTEM 1 HOUR FIRE RESISTIVE WALL ASSEMBLY - 1" MIN. THICKNESS 3-PART STUCCO SYSTEM; BASIS OF DESIGN: "DRYVIT CCP-4" WITH EXTERIOR FINISH TO MATCH EXISTING BUILDING - 5/8" EXTERIOR SHEATHING - 2" RIGID POLYISO WITH TAPED SEAMS - 5/8" SHEATHING - 6" GALV C-H STUD, FILLED WITH BATT INSULATION - 1" SHAFT LINER IN C-H STUD; SIZE SPACING AND GAUGE TO PROVIDE L/240 DEFLECTION LIMITS 07 1416 - FLUID APPLIED FLASHING MEMBRANE, PER STUCCO SYSTEM EXISTING EXTERIOR WALL INSULATION TO BE CONTINOUS TO EXISTING INSULATION SYSTEM 1 HOUR FIRE RESISTIVE WALL ASSEMBLY - 1" MIN. THICKNESS 3-PART STUCCO SYSTEM; BASIS OF DESIGN: "DRYVIT CCP-4" WITH EXTERIOR FINISH TO MATCH EXISTING BUILDING - 5/8" EXTERIOR SHEATHING - 2" RIGID POLYISO WITH TAPED SEAMS - 5/8" SHEATHING - 6" GALV C-H STUD, FILLED WITH BATT INSULATION - 1" SHAFT LINER IN C-H STUD; SIZE SPACING AND GAUGE TO PROVIDE L/240 DEFLECTION LIMITS EXISTING WALL ASSEMBLY; PATCH AS NEEDED TYP ACROSS EXISTING EXTERIOR WALL EXISTING CONCRETE STRUCTURE 9 5/8" EDGE OF EXISTING SLAB TO REMAIN (BEYOND) 07 1416 - FLUID APPLIED FLASHING MEMBRANE, PER STUCCO SYSTEM GALV SHEET METAL FLASHING 6" J-TRACK SEALANT EDGE OF EXISTING SLAB TO REMAIN 10 1/4" CEMENT PLASTER SYSTEM; BASIS OF DESIGN: "DRYVIT CCP-4" - 'BACKSTOP NT' AIR / WATER RESISTIVE BARRIER - GALV SELF FURRING LATH - CEMENT PLASTER BASE - REINFORCING MESH IN LEVELING COAT - FINISH OVER PRIMER 06 1600 - WALL SHEATHING WS-STUCCO1A GASKETED FASTENERS, TYP COUNTERFLASHING NEW SEALANT APPLIED TO EXISTING TERMINATION BAR INSULATION TO BE CONTINOUS TO EXISTING INSULATION SYSTEM EXTERIOR 1 HOUR RATED UL LISTED HORIZONTAL ASSEMBLY REPLACE EXISTING EDPM FLASHING AT JOINT 05 4000 - COLD-FORMED METAL FRAMING NOTE: 6" METAL STUD, 18 GA. @ 16" O.C. GRAY REGION INDICATES EXISTING CONDITION SEALANT SELF ADHERED FLASHING CEMENT PLASTER SYSTEM; BASIS OF DESIGN: "DRYVIT CCP-4" - 'BACKSTOP NT' AIR / WATER RESISTIVE BARRIER - GALV SELF FURRING LATH - CEMENT PLASTER BASE - REINFORCING MESH IN LEVELING COAT - FINISH OVER PRIMER AQUAFLASH SYSTEM OVER EXTERIOR SHEATHING CASING BEAD WITH WEEPS GALV FLASHING IN CONTINUOUS SEALANT INTERIOR GRAY REGION INDICATES EXISTING CONDITION GALV METAL COUNTER FLASHING WITH END DAMS SEALANT ON CLOSED CELL BACKER ROD GALV METAL FLASHING TREATED NAILER AND PLASTER STOP SEALANT EXTERIOR SHEATHING GALV METAL COUNTER FLASHING 1" MI N AQUAFLASH SYSTEM OVER SHEATHING; EXTEND OVER TOP OF PARTITION GALV METAL FRAMING; SEE STRUCTURAL CEMENT PLASTER SYSTEM; BASIS OF DESIGN: "DRYVIT CCP-4" - 'BACKSTOP NT' AIR / WATER RESISTIVE BARRIER - GALV SELF FURRING LATH - CEMENT PLASTER BASE - REINFORCING MESH IN LEVELING COAT - FINISH OVER PRIMER AQUAFLASH SYSTEM OVER EXTERIOR SHEATHING SHIM SEALANT AND BACKER ROD GRAY REGION INDICATES EXISTING WALL ASSEMBLY 09 2900 - GYPSUM BOARD, TYPE X SECTION 09 2216 - NON-STRUCTURAL METAL FRAMING NOTE: PROVIDE THIS CONDITION TYPICAL FOR BOTH SIDES OF WALL INFILL MECHANICAL DUCT, RE: MECHANICAL PARAPET BEYOND TOP OF EXISTING ROOF ASSMEBLY MEMBRANE PAD ADHERED TO EXISTING ROOF WITH SPLICE ADHESIVE; SEAL PERIMETER WITH POURABLE SEALER ROOF PIPE SUPPORT METAL ROOF CURB AND FRAMING SECURED TO EXISTING STRUCTURAL DECK CONTINUOUS LAP SEALANT FULLY ADHERED FLASHING MEMBRANE CONTINUOUS BEAD OF LAP SEALANT GC TO VIFPER MFR, BUT NOT LESS THAN 8"FASTER & SEAM FASTENING PLATE BONDING ADHESIVE FULLY ADHERED SHEET METAL COUNTER FLASHING ROOF TOP MECHANICAL EQUIPMENT, RE: MECH EPDM 6" PRESSURE - SENTITIVE CURB WRAP WITH 6" FACTORY- APPLIED TAPE INSULATED METAL CURB, RE: MECH FIRE TREATED WOOD BLOCKING AS REQUIRED. TREATED WOOD TO BE COATED AS TO PREVENT GALVANIC ACTION WITH FASTENERS AND ADJACENT METAL SURFACES MODIFY EXISTING ROOF FOR NEW MECHANICAL CURB INSTALLATION. PATCH AND REPAIR ROOF TO MAINTAIN WARRANTY, FIRE RESISTIVITY, THERMAL PROPERTIES, AND WATER RESISTIVITY EXISTING ROOF ASSEMBLY CONTINUE ROOF MEMBRANE COVER BOARD PER MFR INTERMEDIATE FR WOOD FRAMING; TREATED WOOD TO BE COATED AS TO PREVENT GALVANIC ACTION WITH FASTENERS AND ADJACENT METAL SURFACES CONTINUOUS SEALANT FLASHING SECURE ROOF CURB TO EXISTING METAL DECK. RE: STRUCTURAL.ABOVE ROOF MEMBRANE AT LOWEST ELEVATION 8" MIN. CURB2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, 1 2 3 4 5 6 A B C D E 1 2 3 4 5 6 A B C D E Sheet Title: Consultant Revision Date No. Sheet Information Project Information Original Issuance Date 9/28/2017 5:29:29 PM15924.00 A-520 2017 EAST WING ADDITION 180 S. Frontage Road West, Vail, CO 81657EXTERIOR DETAILS 09/28/17DP1 VAIL HEALTH 3" = 1'-0"B2 PLAN DETAIL 3" = 1'-0"A2 PLAN DETAIL 3" = 1'-0"A4 SECTION DETAIL 3" = 1'-0"B4 SECTION DETAIL 3" = 1'-0" A5 INFILL WALL BASE DETAIL 3" = 1'-0"B5 INFILL WALL HEADER DETAIL 3" = 1'-0" C5 INFILL WALL PLAN DETAIL 6" J-TRACK 1 1/2" = 1'-0"D2 ROOF PENETRATION SECTION DETAIL 1 1/2" = 1'-0"D4 ROOF CURB DETAIL 1 1/2" = 1'-0"D5 EQUIPMENT SUPPORT CURB SET BOLT IN SEALANT GASKET SHEET METAL COVER EPDM CURB FLASHING EXISTING ROOF SYSTEM8"NOTE: REMOVE ANY EXISTING STUCCO SYSTEM OR EXISTING VAPOR RETARDER THAT WILL BE CONCEALED BY THE NEW STUCCO SYSTEM. AVOID ANY DUPLICATE VAPOR RETARDING CONDITIONS BETWEEN THE NEW AND EXISTING ASSEMBLIES. METAL STUDS TO BE MINIMUM 18 GAUGE, 16" ON CENTER 12/06/17