DEMOLITION PLAN GENERAL NOTES
PLAN LEGEND
KEY PLAN
PLAN KEYNOTES
EXISTING TO REMAIN
EXISTING TO BE REMOVED
PROPERTY LINE
1. ALL DEMOLITION OCCURING IN "AREA B" SHALL EXTEND FROM TOP OF ROOF TO
BOTTOM OF FOUNDATION IN ITS ENTIRETY. SPECIAL CARE TO BE TAKEN WHERE WORK
TAKES PLACE ADJACENT TO OPERATIONAL AREAS.
2. ALL DEMOLITION WORK TO BE COORDINATED WITH THE OWNER PRIOR TO START.
3. PRIOR TO ANY DEMOLITION WORK, CONSTRACTOR TO VERIFY WITH OWNER ANY
ITEMS OR EQUIPMENT DESIGNATED BY THE OWNER TO BE SAVED.
4. WHENEVER EXISTING UTILITIES MUST BE REMOVED, EXPOSED OPENINGS IN
FLOORS AND WALLS, ARE TO BE PATCHED TO MATCH ADJOINING CONSTRUCTION.
EXISTING SUPPLY AND WASTE PIPING ARE TO BE CUT AND CAPPED BELOW FINISHED
SURFACES.
5. EXISTING CONDITIONS, INCLUDING BUT NOT LIMITED TO DIMENSIONS, UTILITIES, AND
MATERIALS HAVE BEEN TAKEN FROM EXISTING DRAWINGS AND/ OR FIELD
MEASUREMENTS. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND
CONSTRUCTION PERTIANING TO EXISTING CONDITIONS PRIOR TO THE START OF
DEMOLITION OR CONSTRUCTION.
6. THE CONTRACTOR SHALL MAINTAIN THE EXSITING STRUCTURAL AND
FIREPROOFING INTEGRITY THROUGHOUT THE ENTIRE BUILDING.
OUTLINE OF EXISTING BUILDING ABOVE
NOT IN SCOPE
DEMOLITION CUT LINE
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP,
1 2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
A
B
C
D
E
Sheet Title:
Consultant
Revision Date
No.
Sheet Information
Project Information
Original Issuance
Date
9/28/2017 5:30:11 PM15924.00
AD402B.1
2017 EAST WING ADDITION
180 S. Frontage Road West, Vail, CO 81657ENLARGED
DEMOLITION
PLAN - LEVEL 2 -
AREA B
09/28/17DP1 VAIL HEALTH
3/16" = 1'-0"A1 ENLARGED DEMOLITION FLOOR PLAN - LEVEL 2 - AREA F
DD02 EXISTING TO REMAIN
DD04 PREPARE EXISTING CONDITIONS FOR NEW CONSTRUCTION
C
B
A
NORTH
12/06/17