Loading...
HomeMy WebLinkAboutE16-0199 Approved Scope of Work.pdf Scope of Work 'Duke at Vail—EM/Exit Lights 1.. Provide and install th0 follOwing LED Exitand EM COrribo light a. 391 Steps Combo Qty. 1 b. 590/392 Steps Exit Qty. 3 c. Spa Hall Exit Qty. 1 d. Spa Suite Exit Qty. 1 Pawn of VaA e. Pool Hall Exit Qty: 3 Ht.VIEWED FOR CODE f. Boiler' Combo Qty. 1 L.,OMPLIANCE g.. Lockup Pool Combo Qty. 2 h. Lodge Pool Rrn. Combo Q0'- 1 Date: _76> _ Loading Mech Combo Qty. 2 By: j. Geti. Rooin Exit' Qty. 1 k. Chiller Combo Qty. 1 od Ce. Qualifications 1. Budget's based on final customer schedule and room availability ▪ Budgets based on customer-supplied asbestos asstSgment 3. Any locations containing asbestos will need to be re-priced 4. Asbestos abatement is.excluded • Sheetrock:mating will be.required 6 Wiremold to he installed fOr floot-inourited door'holds 7. Power shutdowns will be required during installations 8. Budget based on existing circuits having adequate power and good working condition 9. Work to be performed during normal work hours 10. All work is to be scheduled and performed with the approval of the owner General inclusions 1. Shutdown coordination with Lodge at Vail staff 2. Sales taxes 3. LED.Exit and EM Combo fixtures GeneratEi clusions 1. Doorhold hardware, 2. Fire alarm permit 3. Electrical permit 4. Electrical engineering 5. Programrning 6. Asbestos abatement 7. Patching and painting finished surfaces 8. Code updating of existing building ENCOREetectrie