Loading...
HomeMy WebLinkAboutB16-0254_E101_signed_1507144346.pdfSD F F F F FFF F SD F J F F SB SB SB SB F J F D D Dv D Dv D v DDv DD D D D DDDDDD J F F F K KKJ KTTT epo F F K F F F J MENS ROOM WOMENS ROOM MAINTENANCE CURRENT FITNESS AREA N.I.C. N.I.C. TIMBER FRAME ENTRY STRUCTURE AND ROOF TO BE REMOVED 26.1 26.10 26.11 TYPICAL 26.12 26.12 26.2 26.2 26.13 26.3 26.14 26.3 26.14 26.12 26.2 26.3 26.14 EXISTING TO REMAIN PANEL 26.3 26.14 26.12 26.3 26.12 26.14 RECEPTION DESK TO BE REMOVED 26.3 26.3 26.12 26.12 26.15 26.15 26.3 26.3 26.15 26.16 BENCH SEATING TO BE REMOVED 26.3 26.17 26.3 26.14 26.12 26.3 26.14 26.3 26.14 26.12 RECEPTION DESK TO BE REMOVED 26.3 26.14 26.12 26.5 26.5 26.18 26.12 THERAPY / SPA 26.5 26.12 26.18 26.5 26.18 26.5 26.18 26.12 26.5 26.5 26.12 26.12 26.15 26.3 26.19 26.19 26.20 26.20 HOT TUB TO BE REMOVED 26.3 26.2 26.21 26.22 26.3 26.14 26.12 SOFFIT TO BE REMOVED 26.5 26.15 26.2 26.12 26.15 26.5 TYPICAL 26.24 26.23 COVE MOUNTED SPOT LIGHTING TYPICAL CENTRAL DATA AND PHONE DEMARC EQUIPMENT TO BE RELOCATED BY OTHERS 26.3 26.5 26.5 26.5 26.27 26.28 1 A 2 3 4 5 6 A B C D E 1 3 4 5 6 2 COPYRIGHT 2016 BASKERVILL. USE OF THIS WORK IN WHOLE OR IN PART IS FORBIDDEN WITHOUT EXPRESSED WRITTEN CONSENT. B C D E DRAWING NO. P.O. BOX 400, RICHMOND, VA 23218-0400 DRAWING TITLE ISSUE PROJECT OWNER ® 9/19/2017 4:38:19 AM DEMOLITION PLAN - 1st FLOOR THE WIDEWATERS GROUP 2.160036.0 DOUBLETREE VAIL, CO CONVERSION GUESTROOMS & PUBLIC SPACES RENOVATION 08/25/16 - CONSTRUCTION DOCUMENTS E101 2211 N FRONTAGE RD, VAIL, COLORADO 81657 SCALE: 1/8" = 1'-0" DRAWING REF: E401a 6APOWER DEMOLITION PLAN - 1st FLOOR KEYNOTES 26.18 DISCONNECT AND REMOVE RECEPTACLES AND WIRE BACK TO REUSABLE LOCATION. CIRCUIT TO BE REUSED FOR NEW WORK IN THIS SAME AREA. 26.19 DISCONNECT AND REMOVE 200A SAUNA STEAM GENERATOR AND ALL ASSOCIATED EQUIPMENT BACK TO SOURCE. CIRCUIT TO BE REUSED FOR NEW 42P 120/208 PANEL 'LLD'. CONTRACTOR TO VERIFY CIRCUIT TO REMAIN SIZE. 26.20 DISCONNECT AND REMOVE HOT TUB PUMPS, ALL ASSOCIATED EQUIPMENT AND CONTROLS. EQUIPMENT AND CIRCUITS TO BE EXTENDED AND REUSED FOR NEW HOT TUB RELOCATION. 26.21 DISCONNECT AND REMOVE HVAC DISCONNECTS FOR RELOCATION AS NEEDED. 26.22 DISCONNECT AND REMOVE ABANDONED MISCELLANEOUS ELECTRICAL DEVICES / CONDUIT/EQUIPMENT AND WIRE BACK TO SOURCE. 26.23 DISCONNECT AND REMOVE AHU FOR REPLACEMENT WITH NEW UNIT. CONTRACTOR TO VERIFY BREAKER AND WIRE SIZES AND REPLACE AS REQUIRED. 26.24 DISCONNECT AND REMOVE INDOOR AIR HANDLERS, OUTDOOR CONDENSING UNITS, DISCONNECTS AND WIRE BACK TO SOURCE. CIRCUITS TO BE REUSED FOR NEW VAV BOXES. TYPICAL OF (3) UNITS. 26.27 DISCONNECT AND REMOVE CIRCUIT TO MAKE UP AIR UNIT ON ROOF BACK TO SOURCE. 26.28 DISCONNECT AND REMOVE CIRCUIT FROM ROOF TOP UTILITY FAN BACK TO REUSABLE LOCATION. 26.1 DISCONNECT AND REMOVE LIGHTING, CONDUIT AND WIRE BACK TO REUSABLE LOCATION. LIGHTING CIRCUIT TO BE REUSED FOR NEW UNDER CANOPY LIGHTING. 26.2 DISCONNECT AND REMOVE LIGHTING. CIRCUIT TO BE REUSED FOR NEW LIGHTING IN SAME AREA. LIGHTING CIRCUITS TO BE ROUTED THRU NEW LIGHTING CONTROLS / PANEL. 26.3 DISCONNECT AND REMOVE ALL LIGHTING, SWITCHING AND WIRE BACK TO SOURCE. LIGHTING CIRCUITS TO BE ROUTED THRU NEW LIGHTING CONTROLS / PANEL. 26.5 DISCONNECT AND REMOVE LIGHTING AND SWITCHING. REMOVE WIRE BACK TO REUSABLE LOCATION. CIRCUIT TO BE REUSED FOR NEW LIGHTING WORK IN THIS SAME AREA. 26.10 DISCONNECT AND REMOVE RECEPTACLE, CONDUIT AND WIRE BACK TO REUSABLE LOCATION. 26.11 DISCONNECT AND REMOVE INFRARED HEATER AND WIRE BACK TO REUSABLE LOCATION. HEATER AND CIRCUIT TO BE REUSED FOR NEW VALET LOCATION. 26.12 DISCONNECT AND REMOVE FIRE ALARM DEVICES AND WIRE BACK TO REUSABLE LOCATION. DEVICES TO BE REUSED FOR NEW WORK. 26.13 DISCONNECT AND REMOVE 100A MCB PANELBOARD. REMOVE FEEDER BACK TO REUSABLE LOCATION. PANEL TO BE RELOCATED AT NEW KITCHEN WALL FOR NEWLY CONFIGURED BAR AREA. SEE POWER DRAWING E121 FOR NEW PANEL LOCATION AND DESIGNATION. 26.14 DISCONNECT AND REMOVE ALL RECEPTACLES, DATA OUTLETS AND WIRE BACK TO SOURCE. 26.15 DISCONNECT AND REMOVE RECEPTACLES AND WIRE BACK TO SOURCE. 26.16 DISCONNECT AND REMOVE RECESSED FLOOR BOXES, CONDUIT AND WIRE BACK TO POINT OF REUSE FOR NEW RECESSED FLOOR BOXES. 26.17 DISCONNECT FIRE PLACE FOR DEMOLITION / REMOVAL. CIRCUIT TO BE REUSED FOR NEW FIRE PLACE LOCATION. SEE E121 FOR ADDITION INFORMATION. GENERAL PLAN NOTES 1. REMOVE ALL SPEAKERS, SWITCHING AND ALL ASSOCIATED SOUND SYSTEM EQUIPMENT FROM THERAPY / SPA AND RETURN TO OWNER FOR REUSE IN NEW THERAPY / SPA LOCATION. 1 8/25/2016 FOR CONSTRUCTION SET 10 9/15/17 CCD-06 09/07/2017 201709/0 10/04/17