HomeMy WebLinkAboutB16-0254_P101_signed_1507144351.pdf22.122.1
22.2
22.3
22.3
22.422.422.4
22.522.5
3" G (EXIST)
2" G (EXIST)
22.6
22.7
22.7
22.7
22.7
8" SAN (EXIST)
4" GW (EXIST)
4" SAN (EXIST)
22.8
22.28
22.37
1 A 2 3 4 5 6 A B C D E
1
3 4 5 6 2
COPYRIGHT 2016 BASKERVILL. USE OF THIS WORK IN WHOLE OR IN
PART IS FORBIDDEN WITHOUT EXPRESSED WRITTEN CONSENT.
B C D E
DRAWING NO.
P.O. BOX 400, RICHMOND, VA 23218-0400
DRAWING TITLE
ISSUE
PROJECT
OWNER
®
9/19/2017
5:06:28 AM
1st FLOOR -
DEMOLITION
THE WIDEWATERS
GROUP
2.160036.0
DOUBLETREE VAIL,
CO CONVERSION
GUESTROOMS &
PUBLIC SPACES
RENOVATION
08/25/16 -
CONSTRUCTION
DOCUMENTS
P101
2211 N FRONTAGE
RD, VAIL, COLORADO
81657
SCALE: 1/8" = 1'-0" DRAWING REF: E401a
6A1st FLOOR - DEMOLITION
22.1 REMOVE WALL-HUNG LAVATORY AND PIPING TO WORK POINT
22.2 REMOVE WATER CLOSET AND PIPING TO WORK POINT
22.3 REMOVE ALL PLUMBING FIXTURES AN ASSOCIATED CW, HW, WASTE, & VENT
PIPING IN EXISTING PUBLIC RESTROOM
22.4 REMOVE EXISTING FLOOR RECEPTORS AND PIPING TO WORK POINTS
22.5 REMOVE GAS PIPING AS SHOWN. PIPING TO BE RE-ROUTED TO ACCOMMODATE
NEW CEILING LAYOUT AND FIREPLACE.
22.6 REMOVE GAS PIPING ROUTED BELOW SLAB TO GAS FIREPLACE
22.7 REMOVE FLOOR DRAIN AND PIPING TO WORK POINT
22.8 EXISTING GAS PIPING TO FIREPLACES ON GUESTROOM FLOORS
22.28 REMOVE PIPING TO HOT TUB BACK TO MECHANICAL ROOM. EXISTING HOT TUB
EQUIPMENT TO BE REUSED FOR NEW OUTDOOR HOT TUB. VERIFY LOCATION OF
PIPING TO BE REMOVED.
22.37 REMOVE AND CAP EXISTING VENT THROUGH ROOF. NEW VENT THROUGH ROOF
TO BE PROVIDED TO ACCOMMODATE NEW MECHANICAL EQUIPMENT ON LOW
ROOF ABOVE.
DEMOLITION KEYNOTES
1 8/25/2016 FOR CONSTRUCTION SET
9 7/21/17 CCD-05
10 9/15/17 CCD-06
09/07/2017
201709/0
10/04/17