Loading...
HomeMy WebLinkAboutB17-0453_AD102.2_1513876493.pdfREF. UPDN 11e93 15e93 16e93 17e93 19e93 18e93 20e93 He93 Ge93 Je93 Ke93 10e93 12e93 14e93 13e93 DEMOLITION PLAN GENERAL NOTES PLAN LEGEND KEY PLAN PLAN KEYNOTES EXISTING TO REMAIN EXISTING TO BE REMOVED PROPERTY LINE 1. ALL DEMOLITION WORK TO BE COORDINATED WITH PHASING AS SHOWN ON SHEET AD-010.0. SPECIAL CARE TO BE TAKEN WHERE WORK TAKES PLACE ADJACENT TO OPERATIONAL PATIENT CARE AREAS. 2. ALL DEMOLITION WORK TO BE COORDINATED WITH THE OWNER. 3. PRIOR TO ANY DEMOLITION WORK, CONSTRACTOR TO VERIFY WITH OWNER ANY ITEMS OR EQUIPMENT DESIGNATED BY THE OWNER TO BE SAVED. 4. WHENEVER EXISTING UTILITIES MUST BE REMOVED, EXPOSED OPENINGS IN FLOORS AND WALLS, ARE TO BE PATCHED TO MNATCH ADJOINING CONSTRUCTION. EXISTING SUPPLY AND WASTE PIPING ARE TO BE CUT AND CAPPED BELOW FINISHED SURFACES. 5. EXISTING CONDITIONS, INCLUDING BUT NOT LIMITED TO DIMENSIONS, UTILITIES, AND MATERIALS HAVE BEEN TAKEN FROM EXISTING DRAWINGS AND/ OR FIELD MEASUREMENTS. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONSTRUCTION PERTIANING TO EXISTING CONDITIONS PRIOR TO THE START OF DEMOLITION OR CONSTRUCTION. 6. THE CONTRACTOR SHALL MAINTAIN THE EXSITING STRUCTURAL AND FIREPROOFING INTEGRITY THROUGHOUT THE ENTIRE BUILDING. OUTLINE OF EXISTING BUILDING ABOVE NOT IN SCOPE 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, 1 2 3 4 5 6 A B C D E 1 2 3 4 5 6 A B C D E Sheet Title: Consultant Revision Date Sheet Information Project Information Original Issuance 10/26/2017 3:23:57 PM15924.00 AD102.2 2017 EAST WING ADDITION 180 S. Frontage Road West, Vail, CO 81657OVERALL DEMOLITION PLAN - LEVEL 2 10/25/2017DP2 VAIL HEALTH 1/16" = 1'-0"A1 OVERALL DEMO FLOOR PLAN - LEVEL 2 NORTH C B A 12/21/17