HomeMy WebLinkAboutB17-0453_AD103.2_1513876492.pdfREF.
REF.
REF.
FD
FD
UP
AD200C.2A1
11e93
15e93
16e93
17e93
19e93
18e93
20e93
He93 Ge93 Je93 Ke93
10e93
12e93
14e93
13e93
AD200C.2
A3
DEMOLITION PLAN GENERAL NOTES
PLAN LEGEND
KEY PLAN
PLAN KEYNOTES
EXISTING TO REMAIN
EXISTING TO BE REMOVED
PROPERTY LINE
1. ALL DEMOLITION WORK TO BE COORDINATED WITH PHASING AS SHOWN ON SHEET
AD-010.0. SPECIAL CARE TO BE TAKEN WHERE WORK TAKES PLACE ADJACENT TO
OPERATIONAL PATIENT CARE AREAS.
2. ALL DEMOLITION WORK TO BE COORDINATED WITH THE OWNER.
3. PRIOR TO ANY DEMOLITION WORK, CONSTRACTOR TO VERIFY WITH OWNER ANY
ITEMS OR EQUIPMENT DESIGNATED BY THE OWNER TO BE SAVED.
4. WHENEVER EXISTING UTILITIES MUST BE REMOVED, EXPOSED OPENINGS IN
FLOORS AND WALLS, ARE TO BE PATCHED TO MNATCH ADJOINING CONSTRUCTION.
EXISTING SUPPLY AND WASTE PIPING ARE TO BE CUT AND CAPPED BELOW FINISHED
SURFACES.
5. EXISTING CONDITIONS, INCLUDING BUT NOT LIMITED TO DIMENSIONS, UTILITIES, AND
MATERIALS HAVE BEEN TAKEN FROM EXISTING DRAWINGS AND/ OR FIELD
MEASUREMENTS. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND
CONSTRUCTION PERTIANING TO EXISTING CONDITIONS PRIOR TO THE START OF
DEMOLITION OR CONSTRUCTION.
6. THE CONTRACTOR SHALL MAINTAIN THE EXSITING STRUCTURAL AND
FIREPROOFING INTEGRITY THROUGHOUT THE ENTIRE BUILDING.
OUTLINE OF EXISTING BUILDING ABOVE
NOT IN SCOPE
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP,
1 2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
A
B
C
D
E
Sheet Title:
Consultant
Revision Date
Sheet Information
Project Information
Original Issuance
10/26/2017 3:24:05 PM15924.00
AD103.2
2017 EAST WING ADDITION
180 S. Frontage Road West, Vail, CO 81657OVERALL
DEMOLITION
PLAN - ROOF
10/25/2017DP2 VAIL HEALTH
1/16" = 1'-0"A1 OVERALL ROOF DEMOLITION PLAN - PHASE 1.95
NORTH
C
B
A
12/21/17