Loading...
HomeMy WebLinkAboutB17-0453_AD200C.2_1513876494.pdf55' - 10" 59' - 10" HATCH REGION INDICATES EXTENT OF DEMOLITIOND4 AD200C.2 SIM D4 AD200C.2 SIM D3 AD200C.2 SIM D4 AD200C.2 SIM ONCE METAL DUCT IS RE-ROUTED; PROVIDE 18 GA GALVANIZED BRAKE METAL SECURED TO BACK SIDE OF EXISTING LOUVER; FLASH BASE TO PROVIDE POSITIVE DRAINAGE TO EXTERIOR OF BUILDING. ONCE METAL DUCT IS RE-ROUTED; PROVIDE 18 GA GALVANIZED BRAKE METAL SECURED TO BACK SIDE OF EXISTING LOUVER; FLASH BASE TO PROVIDE POSITIVE DRAINAGE TO EXTERIOR OF BUILDING.DEMO THIS SIDEOF LINEDEMOLITION DETAIL. EXISTING CONDITION SHOWN IN GRAY FILL TO REMAIN MAINTAIN EXISTING ROOFING ASSEMBLY AND FRAMING 6" EXISTING BRICK BEYOND ALIGNDEMO THIS SIDEOF LINESEE STRUCTURAL FOR ADDITIONAL INFORMATION ABOUT SELECTIVE STRUCTURAL DEMOLITION IN DASHED REGION. EXISTING CONDITION SHOWN IN GRAY FILL TO REMAIN EXISTING CEILING TO REMAIN DEMOLITION DETAIL. DEMO THIS SIDEOF LINEDEMOLITION DETAIL. EXISTING CONDITION SHOWN IN GRAY FILL TO REMAIN MAINTAIN EXISTING ROOFING ASSEMBLY AND FRAMING 6" DEMOLITION PLAN GENERAL NOTES PLAN LEGEND KEY PLAN PLAN KEYNOTES EXISTING TO REMAIN EXISTING TO BE REMOVED PROPERTY LINE 1. ALL DEMOLITION OCCURING IN "AREA B" SHALL EXTEND FROM TOP OF ROOF TO BOTTOM OF FOUNDATION IN ITS ENTIRETY. SPECIAL CARE TO BE TAKEN WHERE WORK TAKES PLACE ADJACENT TO OPERATIONAL AREAS. 2. ALL DEMOLITION WORK TO BE COORDINATED WITH THE OWNER PRIOR TO START. 3. PRIOR TO ANY DEMOLITION WORK, CONSTRACTOR TO VERIFY WITH OWNER ANY ITEMS OR EQUIPMENT DESIGNATED BY THE OWNER TO BE SAVED. 4. WHENEVER EXISTING UTILITIES MUST BE REMOVED, EXPOSED OPENINGS IN FLOORS AND WALLS, ARE TO BE PATCHED TO MATCH ADJOINING CONSTRUCTION. EXISTING SUPPLY AND WASTE PIPING ARE TO BE CUT AND CAPPED BELOW FINISHED SURFACES. 5. EXISTING CONDITIONS, INCLUDING BUT NOT LIMITED TO DIMENSIONS, UTILITIES, AND MATERIALS HAVE BEEN TAKEN FROM EXISTING DRAWINGS AND/ OR FIELD MEASUREMENTS. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONSTRUCTION PERTIANING TO EXISTING CONDITIONS PRIOR TO THE START OF DEMOLITION OR CONSTRUCTION. 6. THE CONTRACTOR SHALL MAINTAIN THE EXSITING STRUCTURAL AND FIREPROOFING INTEGRITY THROUGHOUT THE ENTIRE BUILDING. OUTLINE OF EXISTING BUILDING ABOVE NOT IN SCOPE DEMOLITION CUT LINE 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, 1 2 3 4 5 6 A B C D E 1 2 3 4 5 6 A B C D E Sheet Title: Consultant Revision Date Sheet Information Project Information Original Issuance 10/26/2017 3:24:11 PM15924.00 AD200C.2 2017 EAST WING ADDITION 180 S. Frontage Road West, Vail, CO 81657DEMOLITION ELEVATIONS & DETAILS - AREA C 10/25/2017DP2 VAIL HEALTH 1/4" = 1'-0"A3 DEMOLTION ELEVATION - AREA C - SOUTH ELEVATION 1/4" = 1'-0"A1 DEMOLITION ELEVATION - AREA C - WEST ELEVATION 1 1/2" = 1'-0"D4 DEMO SECTION 1 1/2" = 1'-0"D5 DEMO SECTION 1 1/2" = 1'-0"D3 DEMO SECTION 12/21/17