Loading...
HomeMy WebLinkAboutB17-0453_G002_1513876491.pdf1. IF DISCREPANCIES OCCUR BETWEEN DRAWINGS OR BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, SUBMIT AN RFI FOR RESOLUTION. 2. DO NOT SCALE THE DRAWINGS. WRITTEN DIMENSIONS GOVERN. DETAILS SHOWN CLOSER TO ACTUAL SCALE GOVERN OVER LARGER SCALE DETAILS. IF CRITICAL DIMENSIONS DO NOT APPEAR ON CONSTRUCTION DOCUMENTS, NOTIFY THE ARCHITECT IN WRITING FOR RESOLUTION. SUBMIT AN RFI IF CRITICAL DIMENSIONS DO NOT APPEAR ON THE DRAWINGS. 3. THE BUILDING EXTERIOR IS DEFINED BASED ON A SYSTEMS METHODOLOGY. REFER TO A-700 DRAWING SERIES FOR COMPONENTS THAT COMPRISE EACH SYSTEM. 4. THE CONTRACT DOCUMENTS IN THEIR ENTIRETY ARE THE RESPONSIBILITY OF ALL TRADES. WHERE REQUIREMENTS ARE SHOWN IN ONE SECTION OF THE SPECIFICATIONS OR DRAWINGS BUT NOT ANOTHER, THE CONTRACTOR OR SUBCONTRACTOR IS NOT RELIEVED FROM PROVIDING COMPLETELY FINISHED AND PROPERLY FUNCTIONING SYSTEMS. 5. THE CONTRACTOR / SUBCONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LAYOUT AND COORDINATION OF DIMENSIONS IN THE FIELD THAT ESTABLISH WORK POINTS FOR THEIR WORK AND VARIOUS TRADES. 6. ANY MISCELLANEOUS ITEMS OR MATERIALS NOT SPECIFICALLY NOTED, BUT REQUIRED FOR THE PROPER EXECUTION, INSTALLATION, OR PERFORMANCE OF THE WORK, SHALL BE PROVIDED BY THE CONTRACTOR / SUBCONTRACTOR. 7. ALL ITEMS REQUIRING A METHOD OF PROCEDURE APPROVAL SHALL BE SUBMITTED FOR REVIEW 21 DAYS IN ADVANCE. 8. THE CONSTRUCTION SITE IS TO BE KEPT CLEAN AND FREE OF DEBRIS. THE CONTRACTOR / SUBCONTRACTOR IS RESPONSIBLE FOR ALL PHASES OF SECURING, HANDLING, TRANSPORTING AND DISPOSING OF DEBRIS. 9. THE CONTRACTORS / SUBCONTRACTORS SHALL NOT SHUT OFF OR INTERRUPT ANY SYSTEMS OR SERVICES WITHOUT FIRST COORDINATING WITH THE OWNER. 10. THE CONTRACTOR / SUBCONTRACTORS SHALL COORDINATE WITH THE OWNER TO IDENTIFY AND PROTECT EXISTING STRUCTURE, ELECTRICAL/DATA/TELECOM SYSTEMS, UTILITIES, SURFACES AND FINISHES WHICH ARE TO REMAIN. ANY DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR/SUBCONTRACTOR. 11. DELIVERY AND STORAGE OF CONSTRUCTION MATERIALS AND EQUIPMENT (STAGING AREAS) SHALL BE COORDINATED WITH THE OWNER AND SHALL NOT TO INTERFERE WITH HOSPITAL TRAFFIC. 12. THE CONTRACTOR / SUBCONTRACTOR SHALL TAKE CARE TO PROTECT ALL NEWLY INSTALLED MATERIALS AND FINISHES UNTIL WORK IS FORMALLY ACCEPTED BY THE ARCHITECT OR THE OWNER'S REPRESENTATIVE AND TRANSFERRED TO THE OWNER 13. ALL PENETRATIONS THROUGH FLOORS, WALLS AND RATED ASSEMBLIES AS WELL AS ALONG SLAB PERIMETERS AND SEPARATION WALL PERIMETERS, SHALL BE SEALED AND PROTECTED WITH U.L. APPROVED SAFETY ASSEMBLIES AND/OR PROTECTIVE DEVICES HAVING THE SAME OR GREATER TESTED RATING AS THAT REQUIRED FOR THE ASSEMBLY BEING PENETRATED. ALL PENETRATIONS SHALL BE PROTECTED TO MAINTAIN FIRE RATED ASSEMBLY INTEGRITY. 14. PROVIDE ELECTROLYTIC PROTECTION / ISOLATION BETWEEN ALL DISSIMILAR METALS, AND BETWEEN TREATED WOOD AND METALS TO PREVENT ELECTROLYTIC REACTION AND/OR CORROSION. 15. ALL WOOD, EXCEPT ARCHITECTURAL WOODWORK, USED ON THIS PROJECT SHALL BE FIRE RETARDANT, NON-COMBUSTIBLE TREATED AS APPROVED FOR USE BY THE LOCAL CODE AUTHORITIES. NO WOOD (WHETHER TREATED OR NOT) SHALL BE USED WITHIN THE CEILING PLENUM SPACE. 16. THE CONTRACTOR / SUBCONTRACTOR SHALL PROVIDE ADEQUATE BLOCKING, BACKING OR STRUCTURAL SUPPORT AS REQUIRED TO PROPERLY INSTALL ALL MOUNTED ASSEMBLIES, INCLUDING ALL ATTACHED EQUIPMENT (OWNER AND CONTRACTOR FURNISHED ITEMS), PLUMBING FIXTURES, MILLWORK, AND CASEWORK. NOTE: ALL FRAMING OR CONCEALED BLOCKING SHALL BE METAL BETWEEN STUDS AS IS RECOMMMENDED FOR WALL MOUNTED ITEMS. REFER TO THE A-700 SERIES DRAWINGS FOR FUTHER INFORMATION. 17. WHERE FIRE EXTINGUISHER CABINETS, ELECTRICAL PANELS OR OTHER EQUIPMENT OR DEVICES ARE RECESSED IN FIRE-RATED PARTITIONING AND/OR SOUND RATED PARTITIONING, MODIFY PARTITION CONSTRUCTION TO PROVIDE CONTINUOUS ENCLOSURE FOR UNINTERRUPTED ASSOCIATED FIRE RATING AND/OR SOUND RATING. 18. ALL ROOMS OR AREAS WITH CEILINGS OPEN TO STRUCTURE ARE TO HAVE METAL WALL GRILLS FOR AIR DUCT OPENINGS OR AT OPEN AIR TRANSFERS. COORDINATE SIZE OF GRILLE WITH MECHANICAL DRAWINGS AND AIR FLOW REQUIREMENTS. 19. METAL FRAMING STUD SPACING MAY VARY AT LOCATIONS RECEIVING MOISTURE RESISTANT GYPSUM BOARD. INSTALL FRAMING AT WALLS, HARD CEILINGS AND SOFFITS PER MANUFACTURER'S RECOMMENDATIONS. REFER TO SPECIFICATIONS FOR A DISCRIPTION OF THE LOCATIONS TO RECEIVE MOISTURE RESISTANT GYPSUM BOARD INCLUDING BUT NOT LIMITED TO LOCATIONS ADJACENT TO PLUMBING FIXTURES. 20. THE GC SHALL CARRY FIRE WATCH COSTS TO PROVIDE PERSONNEL PER NFPA. 21. THE OWNER WILL BE REQUIRED TO SIGN OFF ON ROUGH IN AND ARCHITECTURAL DEVICES BEFORE PROCEEDING. SEE SPECIFICATION 01 4000 FOR MORE INFORMATION. 22. GC TO PROVIDE ICRA COMPLIANCE PLAN TO OWNER FOR APPROVAL PRIOR TO COMMENCING WORK. PROJECT FRONTAGE RD. W. MEADOWS LIONSHEAD CIR VAIL RDBEAVER DAM FOREST ROCKLEDGE MILL CR E EK RD MILL CRE E K RDLIFT 8 I-70 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver DPA Project: Sheet Number: Sheet Title: Location Map Consultant Revision Date No. Sheet Information Project Information Project Team COPYRIGHT - DAVIS PARTNERSHIP, P.C. Original Issuance Date Sheet General 10/26/2017 3:24:13 PM15924.00 G002EAST WING ADDITION 180 S. Frontage Road West, Vail, CO 81657SHEET INDEX AND PROJECT DATA ARCHITECT Davis Partnership Architects 2901 Blake Street Suite 100 Denver, CO 80205 P. 303.861.8555 Scott Nevin scott.nevin@davispartnership.com OWNER Vail Valley Medical Center 180 S Frontage Road W Vail, CO 81657 CIVIL ENGINEER Martin/Martin, Inc. 0101 Fawcett Rd. Suite 260 Avon, Co 81620 P. 970.926.6007 Mark Luna mluna@martinmartin-mtn.com OWNER REPRESENTATIVE Project One Integrated Services 88 Inverness Cir E Building G, Suite 101 Englewood, CO 80112 P. 303.917.7507 Chris Knight chrisk@projectoneis.com MECHANICAL, ELECTRICAL, PLUMBING Cator Ruma & Associates Co 896 Tabor Street Lakewood, CO 80401 P. 303.232.6200 Wayne Trader wtrader@catorruma.com CODE CONSULATANT Advanced Consulting Engineers 3900 S. Wadsworth Blvd. Suite 595 Lakewood, CO 80235 P. 720.981.4150 Masoud Sabounchi masoud@acecode.com STRUCTURAL ENGINEER Martin/Martin, Inc. 12499 W. Colfax Ave. Lakewood, CO 802015 P. 303.431.6100 Shane McCormick smccormick@martinmartin.com MEDICAL EQUIPMENT Mitchell Associates 630 Dundee RD Suite 340 Northbrook, IL 60062 360.798.7653 Matt Gibbs mgibbs@mitchellplanning.com INTERIOR DESIGNER Davis Partnership Architects 2901 Blake Street Suite 100 Denver, CO 80205 P. 303.861.8555 Janette Ray janette.ray@davispartnership.com LANDSCAPE Davis Partnership Architects 2901 Blake Street Suite 100 Denver, CO 80205 P. 303.861.8555 Lynn Moore lynn.moore@davispartnership.com 2017 10/25/2017DP2 VAIL HEALTH NUMBER SHEET ISSUANCEISSUE DATEREVISION NAMEREVISION DATE01 General G001.2 COVER DP2 10/25/2017 G002 SHEET INDEX AND PROJECT DATA DP2 10/25/2017 02 Life Safety LS100 CODE ANALYSIS DP2 10/25/2017 LS101 LIFE SAFETY PLAN - LEVEL 1 DP210/25/2017 LS102 LIFE SAFETY PLAN - LEVEL 2 DP210/25/2017 07 Structural S-012 MSA STAIR DP2 10/25/2017 S-013 MSA STAIR DETAILS DP2 10/25/2017 08 Architectural Demolition AD100.2 OVERALL DEMOLITION PLAN - LEVEL 0 DP2 10/25/2017 AD101.2 OVERALL DEMOLITION PLAN - LEVEL 1 DP2 10/25/2017 AD102.2 OVERALL DEMOLITION PLAN - LEVEL 2 DP2 10/25/2017 AD103.2 OVERALL DEMOLITION PLAN - ROOF DP2 10/25/2017 AD103C.2 ENLARGED DEMOLITION PLAN ROOF - AREA C DP2 10/25/2017 AD200C.2 DEMOLITION ELEVATIONS & DETAILS - AREA C DP2 10/25/2017 09 Architectural A000 ABBREVIATIONS & SYMBOLS DP210/25/2017 A010.2 OVERALL SITE PLAN DP2 10/25/2017 A101.2 OVERALL FLOOR PLAN - LEVEL 1 DP2 10/25/2017 A101C.2 ENLARGED PLANS, SECTIONS, & ELEVATIONS - AREA C DP2 10/25/2017 A102.2 OVERALL FLOOR PLAN - LEVEL 2 DP2 10/25/2017 A103.2 OVERALL ROOF PLAN DP2 10/25/2017 A488.2 STAIR DETAILS DP2 10/25/2017 A720.2 DOOR SCHEDULE, PARTITION TYPES, WALL SYSTEMS, AND DETAILS DP2 10/25/2017 15 Mechanical M-100.2 MECHANICAL PLANS - CENTRAL STAIR ADDITION DP2 10/25/2017 17 Electrical E-100.2 ELECTRICAL PLANS - CENTRAL STAIR ADDITION DP2 10/25/2017 21 Technology T-100.2 TECHNOLOGY PLANS - CENTRAL STAIR ADDITION DP2 10/25/2017 12/21/17