HomeMy WebLinkAboutB17-0453_G002_1513876491.pdf1. IF DISCREPANCIES OCCUR BETWEEN DRAWINGS OR BETWEEN THE
DRAWINGS AND THE SPECIFICATIONS, SUBMIT AN RFI FOR RESOLUTION.
2. DO NOT SCALE THE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
DETAILS SHOWN CLOSER TO ACTUAL SCALE GOVERN OVER LARGER
SCALE DETAILS. IF CRITICAL DIMENSIONS DO NOT APPEAR ON
CONSTRUCTION DOCUMENTS, NOTIFY THE ARCHITECT IN WRITING FOR
RESOLUTION. SUBMIT AN RFI IF CRITICAL DIMENSIONS DO NOT APPEAR
ON THE DRAWINGS.
3. THE BUILDING EXTERIOR IS DEFINED BASED ON A SYSTEMS
METHODOLOGY. REFER TO A-700 DRAWING SERIES FOR COMPONENTS
THAT COMPRISE EACH SYSTEM.
4. THE CONTRACT DOCUMENTS IN THEIR ENTIRETY ARE THE
RESPONSIBILITY OF ALL TRADES. WHERE REQUIREMENTS ARE SHOWN
IN ONE SECTION OF THE SPECIFICATIONS OR DRAWINGS BUT NOT
ANOTHER, THE CONTRACTOR OR SUBCONTRACTOR IS NOT RELIEVED
FROM PROVIDING COMPLETELY FINISHED AND PROPERLY FUNCTIONING
SYSTEMS.
5. THE CONTRACTOR / SUBCONTRACTOR SHALL BE FULLY RESPONSIBLE
FOR THE LAYOUT AND COORDINATION OF DIMENSIONS IN THE FIELD
THAT ESTABLISH WORK POINTS FOR THEIR WORK AND VARIOUS
TRADES.
6. ANY MISCELLANEOUS ITEMS OR MATERIALS NOT SPECIFICALLY NOTED,
BUT REQUIRED FOR THE PROPER EXECUTION, INSTALLATION, OR
PERFORMANCE OF THE WORK, SHALL BE PROVIDED BY THE
CONTRACTOR / SUBCONTRACTOR.
7. ALL ITEMS REQUIRING A METHOD OF PROCEDURE APPROVAL SHALL BE
SUBMITTED FOR REVIEW 21 DAYS IN ADVANCE.
8. THE CONSTRUCTION SITE IS TO BE KEPT CLEAN AND FREE OF DEBRIS.
THE CONTRACTOR / SUBCONTRACTOR IS RESPONSIBLE FOR ALL
PHASES OF SECURING, HANDLING, TRANSPORTING AND DISPOSING OF
DEBRIS.
9. THE CONTRACTORS / SUBCONTRACTORS SHALL NOT SHUT OFF OR
INTERRUPT ANY SYSTEMS OR SERVICES WITHOUT FIRST COORDINATING
WITH THE OWNER.
10. THE CONTRACTOR / SUBCONTRACTORS SHALL COORDINATE WITH THE
OWNER TO IDENTIFY AND PROTECT EXISTING STRUCTURE,
ELECTRICAL/DATA/TELECOM SYSTEMS, UTILITIES, SURFACES AND
FINISHES WHICH ARE TO REMAIN. ANY DAMAGED DURING
CONSTRUCTION SHALL BE REPAIRED BY THE
CONTRACTOR/SUBCONTRACTOR.
11. DELIVERY AND STORAGE OF CONSTRUCTION MATERIALS AND
EQUIPMENT (STAGING AREAS) SHALL BE COORDINATED WITH THE
OWNER AND SHALL NOT TO INTERFERE WITH HOSPITAL TRAFFIC.
12. THE CONTRACTOR / SUBCONTRACTOR SHALL TAKE CARE TO PROTECT
ALL NEWLY INSTALLED MATERIALS AND FINISHES UNTIL WORK IS
FORMALLY ACCEPTED BY THE ARCHITECT OR THE OWNER'S
REPRESENTATIVE AND TRANSFERRED TO THE OWNER
13. ALL PENETRATIONS THROUGH FLOORS, WALLS AND RATED ASSEMBLIES
AS WELL AS ALONG SLAB PERIMETERS AND SEPARATION WALL
PERIMETERS, SHALL BE SEALED AND PROTECTED WITH U.L. APPROVED
SAFETY ASSEMBLIES AND/OR PROTECTIVE DEVICES HAVING THE SAME
OR GREATER TESTED RATING AS THAT REQUIRED FOR THE ASSEMBLY
BEING PENETRATED. ALL PENETRATIONS SHALL BE PROTECTED TO
MAINTAIN FIRE RATED ASSEMBLY INTEGRITY.
14. PROVIDE ELECTROLYTIC PROTECTION / ISOLATION BETWEEN ALL
DISSIMILAR METALS, AND BETWEEN TREATED WOOD AND METALS TO
PREVENT ELECTROLYTIC REACTION AND/OR CORROSION.
15. ALL WOOD, EXCEPT ARCHITECTURAL WOODWORK, USED ON THIS
PROJECT SHALL BE FIRE RETARDANT, NON-COMBUSTIBLE TREATED AS
APPROVED FOR USE BY THE LOCAL CODE AUTHORITIES. NO WOOD
(WHETHER TREATED OR NOT) SHALL BE USED WITHIN THE CEILING
PLENUM SPACE.
16. THE CONTRACTOR / SUBCONTRACTOR SHALL PROVIDE ADEQUATE
BLOCKING, BACKING OR STRUCTURAL SUPPORT AS REQUIRED TO
PROPERLY INSTALL ALL MOUNTED ASSEMBLIES, INCLUDING ALL
ATTACHED EQUIPMENT (OWNER AND CONTRACTOR FURNISHED ITEMS),
PLUMBING FIXTURES, MILLWORK, AND CASEWORK. NOTE: ALL FRAMING
OR CONCEALED BLOCKING SHALL BE METAL BETWEEN STUDS AS IS
RECOMMMENDED FOR WALL MOUNTED ITEMS. REFER TO THE A-700
SERIES DRAWINGS FOR FUTHER INFORMATION.
17. WHERE FIRE EXTINGUISHER CABINETS, ELECTRICAL PANELS OR OTHER
EQUIPMENT OR DEVICES ARE RECESSED IN FIRE-RATED PARTITIONING
AND/OR SOUND RATED PARTITIONING, MODIFY PARTITION
CONSTRUCTION TO PROVIDE CONTINUOUS ENCLOSURE FOR
UNINTERRUPTED ASSOCIATED FIRE RATING AND/OR SOUND RATING.
18. ALL ROOMS OR AREAS WITH CEILINGS OPEN TO STRUCTURE ARE TO
HAVE METAL WALL GRILLS FOR AIR DUCT OPENINGS OR AT OPEN AIR
TRANSFERS. COORDINATE SIZE OF GRILLE WITH MECHANICAL
DRAWINGS AND AIR FLOW REQUIREMENTS.
19. METAL FRAMING STUD SPACING MAY VARY AT LOCATIONS RECEIVING
MOISTURE RESISTANT GYPSUM BOARD. INSTALL FRAMING AT WALLS,
HARD CEILINGS AND SOFFITS PER MANUFACTURER'S
RECOMMENDATIONS. REFER TO SPECIFICATIONS FOR A DISCRIPTION
OF THE LOCATIONS TO RECEIVE MOISTURE RESISTANT GYPSUM BOARD
INCLUDING BUT NOT LIMITED TO LOCATIONS ADJACENT TO PLUMBING
FIXTURES.
20. THE GC SHALL CARRY FIRE WATCH COSTS TO PROVIDE PERSONNEL PER
NFPA.
21. THE OWNER WILL BE REQUIRED TO SIGN OFF ON ROUGH IN AND
ARCHITECTURAL DEVICES BEFORE PROCEEDING. SEE SPECIFICATION 01
4000 FOR MORE INFORMATION.
22. GC TO PROVIDE ICRA COMPLIANCE PLAN TO OWNER FOR APPROVAL
PRIOR TO COMMENCING WORK.
PROJECT
FRONTAGE RD.
W. MEADOWS
LIONSHEAD CIR
VAIL RDBEAVER DAM
FOREST
ROCKLEDGE
MILL CR
E
EK RD
MILL CRE
E
K
RDLIFT 8
I-70
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
DPA Project:
Sheet Number:
Sheet Title:
Location Map
Consultant
Revision Date No.
Sheet Information
Project Information
Project Team
COPYRIGHT - DAVIS PARTNERSHIP, P.C.
Original Issuance Date
Sheet General 10/26/2017 3:24:13 PM15924.00
G002EAST WING ADDITION
180 S. Frontage Road West, Vail, CO 81657SHEET INDEX
AND PROJECT
DATA
ARCHITECT
Davis Partnership Architects
2901 Blake Street
Suite 100
Denver, CO 80205
P. 303.861.8555
Scott Nevin
scott.nevin@davispartnership.com
OWNER
Vail Valley Medical Center
180 S Frontage Road W
Vail, CO 81657
CIVIL ENGINEER
Martin/Martin, Inc.
0101 Fawcett Rd.
Suite 260
Avon, Co 81620
P. 970.926.6007
Mark Luna
mluna@martinmartin-mtn.com
OWNER REPRESENTATIVE
Project One Integrated Services
88 Inverness Cir E
Building G, Suite 101
Englewood, CO 80112
P. 303.917.7507
Chris Knight
chrisk@projectoneis.com
MECHANICAL, ELECTRICAL, PLUMBING
Cator Ruma & Associates Co
896 Tabor Street
Lakewood, CO 80401
P. 303.232.6200
Wayne Trader
wtrader@catorruma.com
CODE CONSULATANT
Advanced Consulting Engineers
3900 S. Wadsworth Blvd.
Suite 595
Lakewood, CO 80235
P. 720.981.4150
Masoud Sabounchi
masoud@acecode.com
STRUCTURAL ENGINEER
Martin/Martin, Inc.
12499 W. Colfax Ave.
Lakewood, CO 802015
P. 303.431.6100
Shane McCormick
smccormick@martinmartin.com
MEDICAL EQUIPMENT
Mitchell Associates
630 Dundee RD Suite 340
Northbrook, IL 60062
360.798.7653
Matt Gibbs
mgibbs@mitchellplanning.com
INTERIOR DESIGNER
Davis Partnership Architects
2901 Blake Street
Suite 100
Denver, CO 80205
P. 303.861.8555
Janette Ray
janette.ray@davispartnership.com
LANDSCAPE
Davis Partnership Architects
2901 Blake Street
Suite 100
Denver, CO 80205
P. 303.861.8555
Lynn Moore
lynn.moore@davispartnership.com
2017
10/25/2017DP2 VAIL HEALTH
NUMBER SHEET ISSUANCEISSUE DATEREVISION NAMEREVISION DATE01 General
G001.2 COVER DP2 10/25/2017
G002 SHEET INDEX AND PROJECT DATA DP2 10/25/2017
02 Life Safety
LS100 CODE ANALYSIS DP2 10/25/2017
LS101 LIFE SAFETY PLAN - LEVEL 1 DP210/25/2017
LS102 LIFE SAFETY PLAN - LEVEL 2 DP210/25/2017
07 Structural
S-012 MSA STAIR DP2 10/25/2017
S-013 MSA STAIR DETAILS DP2 10/25/2017
08 Architectural Demolition
AD100.2 OVERALL DEMOLITION PLAN - LEVEL 0 DP2 10/25/2017
AD101.2 OVERALL DEMOLITION PLAN - LEVEL 1 DP2 10/25/2017
AD102.2 OVERALL DEMOLITION PLAN - LEVEL 2 DP2 10/25/2017
AD103.2 OVERALL DEMOLITION PLAN - ROOF DP2 10/25/2017
AD103C.2 ENLARGED DEMOLITION PLAN ROOF - AREA C DP2 10/25/2017
AD200C.2 DEMOLITION ELEVATIONS & DETAILS - AREA C DP2 10/25/2017
09 Architectural
A000 ABBREVIATIONS & SYMBOLS DP210/25/2017
A010.2 OVERALL SITE PLAN DP2 10/25/2017
A101.2 OVERALL FLOOR PLAN - LEVEL 1 DP2 10/25/2017
A101C.2 ENLARGED PLANS, SECTIONS, & ELEVATIONS - AREA C DP2 10/25/2017
A102.2 OVERALL FLOOR PLAN - LEVEL 2 DP2 10/25/2017
A103.2 OVERALL ROOF PLAN DP2 10/25/2017
A488.2 STAIR DETAILS DP2 10/25/2017
A720.2 DOOR SCHEDULE, PARTITION TYPES, WALL SYSTEMS,
AND DETAILS
DP2 10/25/2017
15 Mechanical
M-100.2 MECHANICAL PLANS - CENTRAL STAIR ADDITION DP2 10/25/2017
17 Electrical
E-100.2 ELECTRICAL PLANS - CENTRAL STAIR ADDITION DP2 10/25/2017
21 Technology
T-100.2 TECHNOLOGY PLANS - CENTRAL STAIR ADDITION DP2 10/25/2017
12/21/17