HomeMy WebLinkAboutTivoli Permit worksheet.pdf Permit Fee Worksheet
ROW Use(min$50)
Construction Season(as defined by Town of Vail Municipal Code)
Fee Das Lft of Closure
Single Lane $ 0.15 x x 1 = $ -
Two Lane $ 0.45 x x = $ -
Three Lane $ 1.50 x x = $ -
Sidewalk/Bike Path $ 0.15 x x = $ -
Fee Months Sqft of Closure
Paved Surface $ 0.25 x x ' = $ -
Non-Paved Surface $ 0.05 x _ x = $ -
Fee Weeks Soft of Closure
Core Areas Heated Streetscape $ 0.25 x x I = $ -
Non-Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 1.00 x x = $ -
Two Lane $ 3.00 x x = $ -
Three Lane $ 6.00 x x = $ -
Sidewalk/Bike Path $ 0.50 x x = $ -
Fee Months Sqft of Closure
Paved Surface $ 1.00 x x = $ -
Non-Paved Surface $ 0.20 x 1 x 400 = $ 80.00
Fee Days Sqft of Closure
Core Areas Heated Streetscape $ 0.50 x I x I = r$ -
Sub-total $ 80.00
Street Cut(min$50)
Non-Moratorium Streets
Surface Fee S ft of Cut
ACC/PCC $ 0.30 x $ -
Brick Paver $ 1.00 x = $ -
Pothole(each) $ 50.00 x = $ -
Non-Paved Surface $ 0.05 = $ -
Moratorium Streets
Surface Fee Sqft of Cut
ACCIPCC $ 8.00 x = $ -
Brick Paver $ 15.00 x = $ -
r
Pothole(each) $ 200.00 x = $ -
Non-Paved Surface $ 0.25 = $ -
Sub-Total $ -
Application/Inspection Fee $ 100.00
Total Permit Fee $ 180.00 X 2
01-0 .°`7 )
r ezi,,
20 ,,,,,- za, 662 1(00 -A ‘;- S501),°â€˜) i---ef--.
F-1PW1SpecfficafionslRDWYStandardslPermitFee Waksheet.xls ,— 0 d 7
6400( -iv _t__ __il—
4