Loading...
HomeMy WebLinkAboutprint_page_03-11-2016_56e2d6855449c-0.pdfPERMITS MANAGEMENT Create New Inspection:Select options Create Go to Main Inspection Grid 1 + 1 + Inspections Checklist Edit Info Schedule Inspection Rough Electrical (Rough Electrical (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 03/08/2016 Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel Checklist Edit Info Schedule Inspection Electrical Final (Electrical Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 03/08/2016 Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel