HomeMy WebLinkAboutaction_form_drb_04-14-2017_58f12842468d6-0.pdf Planning & Environmental Commission (PEC)
Department of Community Development
75 South Frontage Road West
TOWN OF 51/iiii_ ACTION FORM Vail, CO 81657
Tel: 970-479-2139
www.vailgov.com
Project Name: Bridge Street Land LLC 2017 Application Number: PEC17-0004
Application Type: Exterior Alteration Date Applied: 02/23/2017
Exterior remodel of existing unit R-1 . R-1 is two separate units and will add the
Project Description: possible 250 sf per unit, adding 500sf of residential space. This remodel will
update a dated section of the building and also provide new rental units which
can be rented as 5 bedroom to 3 individual units.
CONTACTS
Contact Type: Property Owner
Full Name: BRIDGE STREET LAND LLC
Address: 226 S OCEAN BLVD APT C R-1 DELRAY BEACH, FL Phone: None
33483-6798
Project Address: 291 BRIDGE ST R1 (210108262007)
Job Site Location: R1
Legal Description: Subdivision: VAIL VILLAGE FILING 1 Lot: F - K Block: 5C
Parcel Number: 210108262007
BOARDS/STAFF ACTION
Motion By: Kurz Action: Approved
Second By: Lockman
Vote: 6-1-0 (Gillette Opposed) Date: 04/10/2017
Conditions:
- Approval of this project shall lapse and become void one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
- Planning and Environmental Commission approval shall not become valid for 20 days following the date of
approval pursuant to Section 12-3-3, Appeals, Vail Town Code.
- No changes to these plans maybe made without the written consent of Town of Vail staff and/or the
appropriate review committee(s).
- Approval of this exterior alteration request is contingent upon the applicant obtaining Town of Vail approval
of an associated design review application.
- Prior to final approval by the Design Review Board, the applicant shall submit an updated and stamped
topographic survey.
- Prior to requesting a framing inspection, the applicant shall submit an Improvement Location Certificate
(ILC) from a Colorado licensed surveyor to verify that the proposed addition and alterations are built per
approved plans and do not encroach into View Corridor #4. The ILC shall include both the vertical and
horizontal location of the improvements and shall also include a comparison of the as-built conditions of the
addition to View Corridor#4. Any encroachment into View Corridor#4 shall be removed by the applicant
consistent with Title 12, Chapter 22, View Corridors, Vail Town Code.
- The applicant shall mitigate the employee housing impact created by the net new square footage in
accordance with the provisions of Chapter 12-24, Inclusionary Zoning, Vail Town Code, and the applicant
shall make the required fee in lieu payment to the Town of Vail prior to the issuance of any building permit.
- Prior to the issuance of a building permit, the applicant shall submit revised floor plans for verification by
staff that the addition to the third floor unit, R1-A, will not result in any increase of Gross Residential Floor
Area (GRFA) which exceeds the 250 square feet that can be added to the unit's current GRFA under Section
12-15-5, Vail Town Code.
Planner: Matt Panfil