Loading...
HomeMy WebLinkAboutNarrative_20.pdf '-I t! IJiii IMINIAMPPAIMM rrmimeaprar UMI1611 III1M 27 February 2017 Members of the PEC: We are submitting for a conceptual review of a proposed employee housing project to be located on the current Solar Vail site. Rather than submit a completely designed building we are asking for your input very early in the process. We do not have polished renderings or 3D models to show you, only rudimentary plans and some rough elevations. Hopefully this is enough for you to give us some direction and guidance on how best to move forward with the project. History: In late 2007,the current owner received approval to re-zone the property from HDMF to the Housing zone district. This was done because the Housing zone district offered more flexibility in terms of the number of EHU's allowed on the site as well as the fact that the PEC is allowed to determine many of the design standards. In 2008, we received unanimous PEC and DRB approval for a project on this site: that building had 6 levels of EHU's over two levels of parking; 80' maximum building height, with 82 EHU's and 4800 sf of professional office space. Approvals included a variance for permission to build into the man-made 40% slope behind the building, encroachments into the west side setback, and a reduction in the required parking for the EHU's. That project did not proceed as the downturn in the economy hit and the simple fact was that the numbers didn't work. They still would not work for that building. We are proposing a similar but smaller development today. We believe this design will still address the needs of the Applicant and the Community but offer more sound financial metrics. The Site: The approximately 1 acre site is bordered to the south by the 1-70 right-of-way,to the east by TOV owned lands,to the west by the Red Sandstone/VRD Gymnastics Center and to the north by steeply sloping TOV owned open space. Access from the Frontage Road is via a driveway that crosses the TOV owned property. It does not meet and will not meet TOV driveway standards due to the steepness and angle of intersection with the Frontage Road. The buildable area of the site is severely reduced on the north side by the steepness of the open slope. Down near the existing building, some of the slopes exceed 40%although it appears that these slopes were the result of grading done during construction of the existing building. (It should be noted that the VRD Gymnastics center next door is built into this same slope.) GPSL ARCHITECTS , P . C . 953 S. Frontage Road West, Suite 230 • Vail, CO 81657 • tel: 970.476.1 147 info@gpslarchitects.com • www.gpslarchitects.com Solar Vail Conceptual Review-27 February 2017 2 Along the east property line is a 20' utility easement with electric service and possibly gas lines (Xcel isn't sure) in it. The south property line is encumbered with a 30' utility easement and another 20' utility easement that branches off to the northwest and effectively cuts off the southwest corner of the site. All in all, less than 50% of the site is buildable per the TOV Code but does allow for the proposed development if the PEC and utility companies will allow the necessary encroachments. For the proposed use,the location of the site could not be more ideal. It is a 3 minute walk to the bus stop in front of the school, only slightly longer to get onto the pedestrian bridge over the interstate and into Lionshead. Many of the current residents choose to walk east to Town rather than wait for the busses. The Existing Building: The existing building consists of 24 single bedroom units on three floors. It was built in the 70's and offers only Spartan accommodations. One level of parking is at grade, half of which is tucked under the south side of the building. The building currently serves as employee housing for Sonnenalp Properties. Employee usage of the parking is very low-typically 6-8 cars during the Winter season. Vacant spaces are often used for overflow parking by the Hotel. The roof of the existing building is an "antenna farm"that provides cell phone service from the mouth of Dowd Junction eastward to the golf course. This proposed project: In light of all the discussions and media reports on the dire state of employee housing in Vail and downvalley,the Owner decided that it may be time to take another look at improving the property and adding more EHU's to the site. A development team of local experts has been assembled to handle the project. We are here to get PEC feedback on our proposal. Because the building is an important source of employee housing for the Owner, it is imperative that the start-to-finish on-site construction be completed between April and December. To minimize the construction duration, we are looking to use "systems built"technology that will allow pre-constructed and prefininshed modules to be trucked to the site and erected quickly. This technology is not cost effective for a building more than 4 stories. Therefore, we are proposing a significantly smaller building than was approved in 2008: maximum building height of 50' instead of the previously approved 80'. The EHU count will be approximately 68 units and the office area (the offices are primarily for Sonnenalp functions related to employee housing) has been reduced to less than 1700 sf. The proposed building is not intended to be limited solely to employees of the Sonnenalp. This location is ideal for employees of the Hospital, shops and restaurants in the Village and Lionshead. It is also ideal for young families whose children will be attending RSES next door. The school has also indicated that it would be an ideal location for some of their teachers- most of whom now live west of Dowd Junction and get cut off when that section of highway closes. GPSL ARCHITECTS , P . C . 953 S. Frontage Road West, Suite 230 ■ Vail, CO 81657 ■ tel: 970.476.1 147 info@gpslarchitects.com ■ www.gpslarchitects.com Solar Vail Conceptual Review-27 February 2017 3 We are also requesting a substantial reduction in the required parking from what was approved in 2008. As housing is not a listed use in the Chapter 10 Schedule B parking schedule,the PEC determines the requirements. Our proposal is for 36 total spaces plus one dedicated loading space for Fed Ex/UPS delivery trucks. This number includes the parking in the front setback and is all that will fit on the site on one level. Thirty (30) spaces will be under the building(i.e. covered). Seven (7) of these spaces are required to satisfy the Chapter 10 requirement related to office space although we would argue that this number could be reduced due to the fact that office hours and resident hours are the opposite of one another. That leaves 29 spaces to be allocated to the EHU's, or a ratio of.43 spaces per unit. The restricted site area,the historic lack of demand for parking on this site and the lessons learned at Middle Creek would seem to justify the requested reduction. And, as in 2008, we will submit a Parking Management Plan for PEC review and approval per section 12-61-8. Small portions of the building are proposed to encroach into both side setbacks and we anticipate that once again we will be building into a small portion of the 40%slopes. Another improvement over the previous project is in the access driveway. Before, we needed to construct a Vail Fire hammerhead that cut deeply into the hillside (we received Town Council approval for this). In this proposal,that turnout will be eliminated and fire truck movements will be accommodated on site. Finally, the new building will coordinate with the Cellular Service providers to incorporate as much of their hardware into the building as possible. The design will include chimneys at each end that will house most, if not all, of the antennae and receivers. In this "conceptual" PEC review, we are looking for as much concrete feedback as you can give us, especially with regards to the proposed parking numbers. Structured parking is prohibitively expensive for this project and based on the historical parking needs of this site, our proposed numbers look to adequately address the need. Information required by the TOV as part of the application: Describe the nature of the proposed use and measures proposed to make the use compatible with the other properties in the vicinity. Applicant response: The property is zoned in the Housing zone district and currently contains a building being used for employee housing. No change in this use is proposed. The only other buildings in the immediate vicinity are the VRD Gymnastics Center and Red Sandstone Elementary School. Having housing next to a school and rec center is a compatible use. The relation and impact of the use on development objectives of the Town. Applicant response: Employee housing is one of the Town of Vail's top priorities at this point in time. Expanding and improving this use is therefore consistent with the objectives of the Town. GPSL ARCHITECTS , P . C . 953 S. Frontage Road West, Suite 230 ■ Vail, CO 81657 ■ tel: 970.476.1 147 info@gpslarchitects.com ■ www.gpslarchitects.com Solar Vail Conceptual Review-27 February 2017 4 The effect of the use on light and air, distribution of population, transportation facilities, utilities, schools, parks and recreation facilities, and other public facilities and public facility needs. Applicant response: The proposed building is only one story(or so) higher than what exists now so there is little, if any, impact on the distribution of light and air. By increasing the quality and number of EHU's in such close proximity to Lionshead and Vail Village, the effect on the distribution of population is entirely positive. It allows more people to live close to their place of employment and recreation and provides the Town with an increased population base that earns, spends and recreates within the Town. The effect on transportation is also entirely positive. Fewer cars driving into and out of town for the workday with the attendant decrease in demand for daytime parking in the structures or along the Frontage Roads. Better utilization of the existing bus system and pedestrian routes increases their efficiency and benefits the environment. These all combine to reduce the need for more/wider roads, parking, road maintenance,traffic management, etc. The effects on utilities are minimal as there are already utilities in place at the site and surrounding the site. While there are no plans at this time to include a solar array on the building, it is an ideal location for such an installation and perhaps at some point in the near future there will be adequate incentives to take advantage of the opportunities this site and building have to offer. Red Sandstone elementary is operating below capacity. By increasing the number of EHU's and offering a wider mix of unit sizes,we are increasing the possibility that there will be families with young children at this location who will be able to walk to and from the school. There is really very little change from the existing in terms of the impact on parks and recreation facilities and the other public facilities in the Town. By increasing the number of residents in such close proximity to the Town and all it has to offer(including the Mountain), we are only serving to increase the rate of utilization of these facilities with no increase in traffic. The effect upon traffic, with particular reference to congestion, automotive and pedestrian safety and convenience, traffic flow and control, access, maneuverability, and removal of snow from the streets and parking area. Applicant response: A traffic study was done in conjunction with the much larger project approved in 2008. That study concluded that there was no appreciable increase in traffic to and from the site. No new turn lanes or other traffic flow control improvements were warranted. The currently proposed building is substantially smaller. And, by bringing more employees in closer to their place of employment and recreation, we are reducing traffic congestion. The reconfiguration of the driveway to the building will also aid in traffic flow as the drive will now intersect the Frontage road at a right angle instead of the acute angle that exists today. Most of the proposed parking on site will be under cover and snow removal requirements will be no different than exists already. On site snow storage will be per TOV requirements. GPSL ARCHITECTS , P . C . 953 S. Frontage Road West, Suite 230 ■ Vail, CO 81657 ■ tel: 970.476.1 147 info@gpslarchitects.com ■ www.gpslarchitects.com Solar Vail Conceptual Review-27 February 2017 5 The effect upon the character of the area in which the proposed use is to be located, including the scale and bulk of the proposed use in relation to surrounding uses. Applicant response: The existing 3 story-over-parking building is well hidden from most perspectives by the existing berm and retaining wall. We propose to keep the wall and berm to help mask the lower portions of the new building. The new building is only proposed to be one story taller although the roof will be more prominent than the existing roof. This extra height will be masked by bringing the eave line of the proposed roof down to the floor line of the top floor. This proposed building is about 1/3 lower in height than the one approved in 2008 so it will be more in scale with the neighboring Gymnastics building and the school. GPSL ARCHITECTS , P . C . 953 S. Frontage Road West, Suite 230 ■ Vail, CO 81657 ■ tel: 970.476.1 147 info@gpslarchitects.com ■ www.gpslarchitects.com