Loading...
HomeMy WebLinkAboutB08-0035 � NO�'E: TH/S PERM/T MUST BE POSTED ON JOBSITE' AT ALL T/MES . , �owxoFVn�, � Town of Vail, Community Development, 75 South Frontage Road,Vail, Colorado 81657 p. 970.4792139, f. 970.479.2452, inpsections 970.4792149 ADD/ALT MF BUILD PERMIT Permit #: B08-0035 Project #: �������� -�p`:� Job Address: 595 VAIL VALLEY DR VAIL Status. . : APPROVED Location......: MANOR VAIL 285 Applied . . : 02/26/2008 Parcel No....: 210108102018 Issued. .. : Expires . ..: OWNER ROBERT J. RODGERS TRUST 02/26/2008 ROBERT J. RODGERS TRUSTEE 529 LONGMEADOW CIR ST CHARLES `��� ��u�-- IL 60174 � APPLICANT G.E.JOHNSON CONSTRUCTION 02/26/2008 Phone:719-473-5321 1 l �� �<��-1 ` 25 NORTH CASCADE AVE#400 `,���-�- \ v COLORADO SPRINGS CO 80903 I License: 128-A �\ �� �G..-�� CONTRACTOR G.E.JOHNSON CONSTRUCTION 02/26/2008 Phone:719-473-5321 � 25 NORTH CASCADE AVE#400 COLORADO SPRINGS �, � � :� CO 80903 License: 128-A ARCHITECT ZEHREN&ASSOCIATES, INC. 02l26/2008 Phone:970-949-0257 P.O. BOX 1976 AVON CO 81620 License:C000001626 Description: MANOR VAIL 285 INTERIOR FINISH-INSTALL ADDITIONAL BATHROOM/FINISHES/P�UMBING FIXTURES/LIGHT FIXTURES Occupancy: Valuation: $30,750.00 , Type Construction: Total Sq Ft Added: 0 ..,.,,,..............................................................x,.......,.,. FEE SUMMARY ......�,....x.,........__........,..»,,........,...........,............,....... Building Permit Fee------> $451.85 Will Cal Fee---------------------> $4.00 Total Calculated Fees-------------> $1,164.55 Plan Check--------------------> $293.70 Use Tax Fee---------------------> $415.00 Additional Fees-----------------------> $415.00 Add'I Plan Check Hours-> $0.00 Restuarant Plan Review-----> $0.00 TOTAL PERMIT FEES--------------> $1,579.55 Investigation-----------------> $0.00 Recreation Fee-----------------> $0.00 Payments-------------------------------> $1,579.55 Total Calculated Fees--------> $1,164.55 BALANCE DUE------------------------> $0.00 ........................................................�..........,..,.................,�........,................,..................................,.,....................,........, DECLARATIONS I hereby acknowledge that I have read this application,filled out in full the information required,completed an accurate plot plan,and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state�laws,and to build this structure according to the towns zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM -4:00 PM. � -- sl2�l�� Signat e of Owner or o ractor Date � h�-,r1s Print Name bld_alt_construction_perm it_041908 h*�wf**�w�t#w�+ ' wwWw+wrtw******f**!f##*�t��x�Wwf�kw*w*t��***/fffflfwfwKx4Afxw�fk##ffrrtwMtw*wwwwtN*ww�*wrtwk*f�**�www*1frtrt�**w��ww**1rt*w*ww'kw4f4w1f�www�**wwN**�w�*wwwwwXN�i##fAw+f4 APPROVALS Permit#: 608-0035 as of 05-27-2008 Status: APPROVED ...........................................................................................,......,.......,......,..,....,.........�..........,....................................... Item: 05100 BUILDING DEPARTMENT 03/17/2008 NSC Action: CR Correction letter sent on 3/17/08 IR#6888 04/28/2008 jplano Action: AP Plans dated 4/08/08 Item: 05400 PLANNING DEPARTMENT 02/28/2008 Warren Action: AP Item: 05600 FIRE DEPARTMENT 03/03/2008 JJR Action: AP ' Item: 05500 PUBLIC WORKS ...............�,,.........,...,.�......,.,...,.....,................................,,..........�..,.,....,.,,..,,,,........,..».,,.....,.:........,..,.......,..,....,,.,,.......... See the Conditions section of this Document for any that may apply. bld_alt_construction_perm it_041908 •�wa�t�a��A�A�A��7xff�*#w�fiMww/w�wwwwwwwwwkw+fT���kwtkfk��#*44*#�fAAAt#�#l++�xf*#ff#��f4��ff�lifffff*t#l+f�#f4##i4lf#ff+f***��f�f#4��44+t#!#kf�*�*k1���f�w��ffffwkkk*4}�f*�#��f��A��• CONDITIONS OF APPROVAL Permit#: B08-0035 as of 05-27-2008 Status: APPROVED tirww+F4ftrM1rttrfiffL4wYr/rt4Lrt4�l44*f#*frkhrttri4il'i4%lfrtYl'hY�A'4�k4#f1flkfftrl4lefelfffMffRRt�IrY'Y'ff ffrrt�k4#fiFrt#'4YlfffrtkfffffAYr#kR�A'L#ir##+i/f1r#f44*f��4**Aff�R41r4**fMflf4iRrtf*MMYr1ee**#R*1rRRf4�Rw*t'4#if#1riRf�lfr#}4!4 Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 40 (BLDG): (MFR/COMM) FIRE ALARM REQUIRED PER NFPA 72. Cond: CON0009928 PATCHING EXISTING CEILING WITH THE SAME MATERIAL ALLOWED, IF THE CEILING IS REPLACED SEE THE LISTED ASSEMBLY ATTACHED TO PLANS � I �I bld_a It_construction_perm it_041908 ���3u 0 APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UN � d ,�,�() Project#: � <5 Building Permit# - ' - � �' - �� �� 870�79-2149(Ins �tions ���F�� a 75 S. Frontage Rd. Vail,Colorado 81657 TOWN OF VAIL BUILDING PERMI7 APPLICATION Separate Permits are required for electrical, plumbing, mechanical,etc.! CONTRACTOR INFORMATION General Contractor. Town of Vail Reg. No.: Contact Person and Phone#'s: GE Johnson Construction Brett Huether(970)476-7296 Email address: huetherb�gejohnson.com Fax#: 970-401-0693 Contractor Signature: � COMPLETE VALUATIONS FOR BUILDING PERMIT Labor�Materials BUILDING: $22,950.00 ELECTRICAL: $3,600.00 OTHER: $ PLUMBING: $4,200.00 MECHANICAL: TOTAL: $30,750.00 For Parcel#Contacf Ea /e Count Assessors O�ce at 970-328-8640 or visit w�vw.ea le-count .com Parcel# .�`�j � � / v Z� l g l Job Name: MV 285 Job Address: Manor Vail-:?85 595 East Vail Valley Drive,Vail, CO 81657 Legal Description Lot: Block: Filing: Subdivision: Owners Name: Bob Rodgers Address: 529 Longmeadow Circle Phone: 630-377-2271 St. Charles, IL 60174 Architect/Designer: Zehren and Address: PO Box 1976 Phone: (970) 949-0257 Associates Avon, CO 81620 Engineer: Address: Phone: Detailed description of work: Install additional bathroom/finishes/plumbing fixtures/light fixtures. Work Class: New( ) Addition ( ) Remodel (X ) Repair( ) Demo( ) Other( ) Work Type: Interior(X ) Exterior( ) Both ( ) Does an EHU exist at this location: Yes( ) No(X ) Type of Bldg.: Single-family( ) Two-family( ) Multi-family(X ) Commercial( ) Restaurant( ) Other( ) No. of Existing Dwelling Units in this building: No. of Accommodation Units in this building: No/T e of Fire laces Existin : Gas A liances Gas L s X Wood/Pellet Wood Bumin No/Type of Fireplaces Proposed: Gas Appliances( ) Gas Logs(X ) Wood/Pellet( ) VNood Buming (NOT ALLOWED Does a Fire Alarm Exist: Yes(X ) No( ) Does a Fire Sprinkler System Exist: Yes(X ) No( ) FOR OFFICE USE ONLY cG Date Received: ���� Received By: � �� C:\Documents and Settings\fretrs\Desktop\F�dsting Owner-Building Permit Application.doc Page 1 of 7 04/17/2007 1 E08-0170: Entries for Item:190 - ELEC-Final 08:52 06/13/2013 Action Comments By Date Unique_ Ke AP shahn 12/03/2008 A000120 587 Total Rows: 1 Page 1 � � .��� F � built�n�. ��������a� Building Departmeat Services April 28, 2008 George Ruther Community Development Director, Town of Vail 75 South Frontage Road Vail, CO 81657 RE: PROJECT: Mountain View#285 ' PERMIT NUMBER: B08-0035 INTERNAL REF#: 6888 ADDRESS: 585 East Vail Valley Drive Dear Mr. Ruther: SAFEbuilt Colorado has reviewed only for their conformance to the provisians of the 2003 International Building Code as adopted by the Town of Vail. SAFEbuilt Colorado finds the documents submitted to be complete for construction. Plans: Description Floor plans, Details and Fire Protection Drawings. Sincere , � John Plano John King Plans Examiner Building Official SAFEbuilt Colorado SAFEbuilt Colorado john.plano(�a,SAFEbuilt.com john.kin ,SAFEbu�lt.com Page 1 of 1 SAFEbuilt Colorado Eagle Office✓P.O.Box 1618 ✓ 1286 Chambers Avenue,Unit 101 ✓Eagle,Colorado 81631 Phone:(970)328-1790✓Toll Free:(877)428-6412✓Fax:(970)328-1791✓V:APlan Review\Vailwlanor Vail\Existing Unit Permits�B08- 0035 FAL.doc 0 TON�'OF YA1L'�. ASBESTOS TESTING REQUIREMENTS THE TOWN OF VAIL AND STATE OF COLORADO DEPARTMENT OF PUBLIC HEAL.TH REQUIRE ASBESTOS TESTING ANY TIME WHEN MORE THAN 160 S.F. OF MATERIAL WILL BE DISTURBED OR REMOVED. AN ASBESTOS TEST AND REPORT IS REQUIRED TO BE SUBMITTED WITH YOUR BUILDING PERMIT APPLICATION FOR ALL REMODEL, ADDITION OR OTHER PROJECTS INVOLVING ANY DEMOLITION OR REMOVAL OF BUILDING MATERIALS THAT MAY CONTAIN ASBESTOS. BUILDINGS CONSTRUCTED AFTER OCTOBER 12, 1988 THAT HAVE NO ASBESTOS CONTAINING MATERIALS ARE E;�EMPT. A COPY OF THE REPORT MUST BE SUBMITTED WITH YOUR BUILDING PERMIT APPLICATION • I have included the asbestos test and report with my building permit application ��� 2 I� �� applicant signature te �� • I certify my project will not disturb or remove more than 160 s.f. of building material. The construction plans submitted with my application clearly indicate this information. (This will be verified during plan review, and will delay your project if found to be inaccurate) applicant signature date OR • The building was constructed after October 12, 1988. The date of construct�on was original construction date applicant signature date C:\Documents and Settings\huetherb\Desktop\Existing Owner-Building Permit Application.doc Page 5 of 7 04/17/2007 _. � � ����� r��� � � - �� � � � '� �� June 20, 2007 � I, Manor Vail Resorts I' Vail, Colorado 81657 FE: Corr�prehensive LE�d �r�d Qsbestes Erspect4�r�, �anoc V�EI R�:sorts To Manor Vaii Resorts: �.s requested, Tetra Tech has completed comprehensive asbestos inspection activities at the site located at Manor Vail Resort. The sampiing activities were completed ori June 15, 2007. As of the date of this report, the site is closed. This report presents the results of the asbestos sampling and subsequent laboratory analysis. SCOPE O�1MORK Tetra Tech's scope of work for this project included collection of bulk samples of suspect asbestos containing materials by personnel certified as Asbestos Inspectors by the State of Colorado Department of Public Health and Environment (CDPHE) and the Environmentai Protection Agency(EPA). Results are included in this report. I�� The scope of work for this assessment included the following: ,� • Conducted a visual inspection of ali areas of the residential units on the property to locate suspected asbestos containing building materials (ACBM) and presumed asbestos containing material (PACM) ■ Collect bulk samples from each suspect material for asbestos content analysis by Polarized Li ht Microsco PLM at an inde endent labor � 9 py ( ) p ator.� e Prepare a written report which presents the results of the sam�>ling conc�ucted This comprehensive asbestos survey included all accessibie areas of the residential units located at Manor Vail. However, inaccessible areas often e;cist within buildings. This could include pipe chases, boiler components, areas behind walis, and hidden spaces belc�w floors. Tetra Tech sampled all materials which could be accessed and identified. Materi�l:s may exist within the building, or beneath the solids on the property, which were not readilPy identifiable. If any additional suspect materials are encountered during demofition activities, Tetra Tech recommends that work be stopped immediately until discovered materiais can be evaluated by a certified Asbestos Inspector. �e'�tU{FL�("�!C PRQ�CEE?E�'RES Suspect materials were grouped into homogeneous areas based on their physicai characteristics, color, texture, and functional application. Suspect materials were divicied into one of three categories based on the following homogeneous area classification schemes recognized by regulatory agencies: 1. Thermal systems insulation (TSI): any type of pipe, boiler, tank or flue insulation 2. Surfacing material: sprayed or troweled onto s�ructural building members 3. Miscellaneous: all other suspect materials, including flooring, ceiling tiles, floor coverings, other insulations, finishing materials, etc. =�!�z �;,ch �`�����y, ����� Random bulk samples were collected according to the guidelines published as Environmental Protection Agency Final Rule: Title II of the Toxic Substances Control Act (TSCA), 15 USC, Sections 2641 through 2654. All samples collected were placed in sealed bags for delivery to thf� laboratory. Samples collected were given unique identification numbers in accordance with established Tetra Tech protocols for sample numbering. aP�aLYTIC�L'FEST�I�G NfETHdQS All bulk samples collected were analyzed by Polarized Light Microscopy (PLM) for asbestos content in accordance with guidelines established by the EPA's Method for Determination of Asbestos in Bulk Materials, method EPA/600/R-g3/116. In accordance with CDPHE regulations, samples which have low leve(s (1%-3%) or trace ! amounts (less than 1%) of asbestos may be analyzed further using point-count methodology in I accordance with provisions of the National Emissions Standard for Hazardous Air Pollutants (NESHAP), 40 CFR Part 61. This method is used to verify or confirrn that a given sample contains 1% asbestos or less vvhen low levels or trace amounts of asbestos are de�ected by PLM analysis. Reservoirs Environmental, Inc. (Reservoirs) was contracted to perform laboratory analysis of the bulk samples collected according to the methods requir2d by the Uniteci States Environmental Protection Agency. Reservoirs is fully accredited by NVLAP for asbestos analysis (Lab Code #101896). This laboratory is also AIHA accredited (Lab ID#101533, Certifiicate#480). �CSCCC�S8��4 Q!F E�E�C�LFS The following summarizes the asbestos and non-asbestos containing rnaterial sampled in all ' residential units. �4C�VI �D�c�s Refer to spreadsheet tables (�or� a,CN9 Refer to spreadsheet tables �II Accor�ing to Colorado Air Quality Control Commission's Regulation fJumber 8, non-friable AC6Ms are exempt from abatement requirements rior to demolition if the remain non- � I' P friable . Y and do not remain on site following demolition. Sincerely, Tetra Tech ,-, :; � ; / .; /� '�.------ J:,� <_.:.��-`_-,\J''"�_"1'" ' ,/� Jim Stout �/ Project Manager I MANOR VAIL /ASB[STO� CONFIRM/�TION TI�BLC June 15, 2007 Non-ACM - Non Asbestos Containing Material Non-ACM Non Asbestos Containing Material t3uilding C Raom # . ,Non-ACM � ACM ='� Room # ;;: ;Non- `130 X 230 . ,, 1�1 X '231 ' 132 X 133 232 _. X 233 , 134 : X 234 .'' 135 X 235 136 X `236 . 137 X 237 . 138 X 238 . 139 X 239 140 X 240 :< 141 X -241 142 X 242 143' X .:,243 :.. 144 X 244 � 145 X 245 - 14G X : 246 : 147 X ' 247. , 148 X `' 248.. X , 149 . . X - 249 X ' 150 X ,,250 X 151 X 251 X 152 X 252 `. - X 153 X - 253 X 154 X 254 : 155 X 255- 156 X 256 ' Roofinq X Roofin - X Roofin X ' Tower X ACM -Asbestos Containing Material Non-ACM - Non Asbestos Containing Material Ht;nn: > ACM ,-: ..-. =Room�# a --:Non-, X ' 330�:-, X 331 ;.; X 332 , = X �333:.� . x - ,334.; X ;.335` ' X 336 ;::; X ' 337 ' : x 338 ., X `339::. : X '- 340 , X ° 341 ,_. x < 342 ..,. X ; 343 ,,._ , X 344 :' : X 345.- : X ` 346 `< � ' 347. -, 348 � �349�;: ' 350 351 `> 352 . -353 X `'354 X X ;355 "°' X x 356 _< x ►�.ivi -, .� X � X X X X X X X X X X X X X X X X �- X X X X X --�Ca-cr"� Quilding D Non-ACM - Non Asbestos Containing Material au�i��„q e �``'��P�� . ��. .���J��� ��n�a�ning iviaterial Ncr-AC�" - �.;�;, ,^»uc�tGg Cuil`l'cllfllily IVIaiOClal F3uilding F Room # Non-ACM- ACM; ,. �. ,dom#.. 081 X '180' ; 083 > X 1$1 -: 0$5 �`t' 182 Ot37 - � �� �" 1$3- 184 �;:,�, �..�� � ,��ff��� �s6 187 �) ��`� ����� .,—N��o--n-ACN►. ACM , Room #• ; X 280= x 281- x , 282 — x 283 — X 284—` x 285 — x 286 � X : 287 X ACM - Asbestos Containing Material � � � X Non-nCM - Non /�sbestos Coniaining Material •,n �o /,I_ �\� /''''�/'��/��i%l�'�� ` � / <�-� ��" �� � � ..:'/� I I� ::>...A�M` Room�# X ,.� 380 X 381 X 382 X 383 : X 384 X 385, X 386 X �s�� �AC X X X �- �,Resdipg_No.�Tlme�.:.� . „-,.',',:Typa:`.�Outat{onNnRa'.,�,;�i�rf;COIAPONENTh ��SROUMNUMBEBS��,fLOOR:tStiE/A�ORESS�:UISPECTOR'�.SAIdPLENOTE;iOTHEpNOTES,Res �.;ESealeT,:6eteCT-Ryu11s,,0ePihlndex i''Aaticn'Level':'FbC���PbGErmcIPbL�.PbCfrwr.�P K-.Pb � o - . .. . _ ..... . . _ _ . , _ , , . . ._,... _ .t .. . , ... . b . KErr r, . -. ._ . . . ..: .. . . -.: �2 4l1G1200712:12PAINT 7B.B7mglcm^2 CALIBFATE . . �PH T�EaT � � TEST . .. .Posi�ive � 1 1 1 0.1 1 0.1 O.i 0.2 3 A/16/2oU7 12:16 PAINT 122 mg/cm^2 Exlernal Door UfJIT C �PH TEST TEST Nega�ive 7 1 0 0.02 0 0.02 -0.24 1.7 4 411GI200712;17PAINT 122mg/cm^2 ExlernalDoor UIJITC � � DPH TEST TEST Nega�ive 1.19 1 0.01 O.oq O.o1 0.04 0.12 0,96 5 4H6I20o7 72:17 PAINT 7.22 mg I cm^2 E„ternal Door UNIT C DPH TEST TEST � Negative 1 1 D 0.02 0 0.02 -0.15 0.97 6 4N612oo712:18P�INT 1z2mglcm^Z ExlemalOoor UNITC OPH TEST TEST Negative 1 1 o OA2 0 0.02 -0.14 7.52 7 A/16/2uo712:ispAINT 122mg/cm^2 ExlemalDoor UNItC �PH TEST TEST Negallve � 7 1 0 0.02 o O.o2 0.3 1,s2 e 4I1s�20o772;q3PAINT 1.22mg/cm^2 DOOR 154�5-6 FIRST UNITC DPH TEST TEST Negalive 126 1 0.03 0.06 0,03 0.06 0.13 O.�J5 9 4I1GI2oo712:43PAINT 1z2ing/cm^2 DOOR 154-5-6 FIRST UNITC DPH TEST TEST Negative 7 1 0 0.02 0 o.o2 �o,s t,q� 10 A/1G/200712;A3PAINT 122mglcm^2 DOOR 154-5-6 FIRST UIJITC UPH � TEST TEST Negalive 1.7t 1 0.04 O,oe O.oM1 o.oe -0.22 1.04 11 A/1G/2oo712:48PAINT 1z2mg/cm^2 IIR.TPIM 154-5-6 FIRST UNITC DPH TEST TEST Nagalive 1.21 1 0.04 0.07 0.04 0,07 -0,05 0.95 12 4/16/2007 12:46 PAINT Y 22 mg/cm^2 DFI,TRIM 154-5-6 FIRST UNIT C �PH TEST TEST Negative 1 1 0 0.02 0 0.02 -0.14 o.s4 13 A/16l200712:4BPAINT 1.e3mglcm^2 WALUMIDDLE 154-5-6 FIRST UNITC �PH TEST TEST Nagative 3.18 1 0.03 0.09 0.03 0.09 -0.15 1,09 14 4I16/2o07 12:5o PAINT 122 m8�cm^2 DOOR 151-2-3 FIRST UIJIT C DPH TEST TEST Negalive 1 1 0 0.02 o a.o2 0.05 0.89 15 A116(2�0712:SOPAINT 122mg/cm^2 UOOR 151-2-3 FIRST UNITC DPH TEST TEST Negalive 1.02 1 0.02 0.04 0.02 0.04 -0.09 1.23 1G 4116l200712:SOPAINT 1.22mg/cm^2 DOOR 151-2-3 FIRST UIJITC DPH TEST TEST Negalive 1,3M1 t o.04 0,07 0.04 0.07 0.04 O.u9 17 A/16/2007 12:50 PAINT 122 mg/cm^2 DOOR 151-23 FIRST UNIT C DPH TEST TEST Negalive 1 1 0 0.02 0 D.02 0.08 0.06 to 4/16I20o712:51PAINT 1,22mg/cm^2 WNDWTRIM 151-2-3 FIRST UNITC DPN TEST TEST Negative 10 1 -O.oe O.e2 0.2s o.61 -O.OS o.92 19 411G/2oo712:52 PAINT 122 mg/cm^2 WNOW TRIM 757-2�3 FIRST UNIT C �PH TEST TEST Negalive 2.32 1 o.os o.13 o.os o.13 -0.07 o.e3 20 4116I200712:52 PAINT 1.22 mg I cm^2 WNDW TFiIM 151-2-3 FIRST UNIT C DPH TEST TEST Negative 1.73 1 D.o4 O,OB 0.04 0.08 -0.03 1.1 21 A/1G/2UD7 12:54 PAINT 7.22 mg/cm^2 WAIUMIDDLE 151-2-3 FIRST UIJIT C �PH TEST TEST Negative 1.89 1 0,01 0,03 0.01 0.03 �o.5B 1.A5 22 4f1G12b0712:57pAINT 122mg/cm^2 DODR 148-49-5o FIRST UNITC �PH TEST TEST Negalive 1 1 0 0,02 0 0.02 -0.41 1A2 23 4I16/2o0712:57PAINT 122mg/cm^2 DOOfa 148-49-5o FIFiST UNITC DPH TEST TEST Negative 1 7 o O.o2 0 0.02 �o.2z O.o3 2A 4/16f2oo7 12:57 PAINT 122 mg I cm^2 DOOR � 748-49-5o FIRST UNIT C DPH TEST TEST Negalive 1.03 7 0.02 0.04 0.02 0.04 -0.28 OJ6 25 A116/200712:58 PAIN7 722 mg/em^2 DOOR 148-09-50 FIRST UNITC DPH TEST TEST Negative 1.16 1 0.02 o.os o.02 0.05 u.15 t.o9 26 4/16/2007 12:50 PqINT 122 mg I cm^2 WNDW TRIM 740-49-50 FIRST UIJIT C DPH TEST TEST Negalive 1.63 1 0.05 0.09 O.oS o.09 -0.02 0.92 27 411GI2oo713:00PAINT 1.22mg/cm^2 WNDWTRIM 148-49�5o FIRST UtJITC DPH TEST TEST Negative 2.39 1 0.05 o.t2 a.o5 0.12 o.u6 1.12 2B 4/16/2007 13:00 PAINT 122 mg/em^2 WNDW TRIM 148-49-50 FIRST UIJIT C OPfi TEST TEST Negalive 1 1 0 0.03 0 0.03 0 0.70 29 4/i612o0713:ooPAINT 1.22mg/cm^2 WNDWTRIM 148-49-5o FIRST UNITC �PH TEST TEST Negative 1 1 • o 0,02 0 o.u2 -o.ot o.o� 30 4/1612007 13:02 PAINT 122 mg!cm^2 WNDW TRIM 145-A6-47 FIRST UNIT C DPH TEST TEST Negative 1 1 0.02 0.04 0.02 0.04 0.15 t.o7 31 4/16/200713:03PAINT 122mg/cm^2 WNDWTRIM 145-46-47 FIFlST UNITC �PH TEST TEST Negative 326 1 0.04 0.13 0,04 D.13 -0.27 1,oB 32 A/16I200713;03PAINT 0.31mg/cm^2 WNDWTRIM 145-46-47 FIRST UNITC �PH TESi TEST Neqative 1 1 0,03 o.t4 0.03 0.14 -o.4e 1.q7 33 q/16/200713:o3p/11NT 1.22ntg/cm^2 WNDWTRIM 145-4s-47 FIRST UNITC DPH 7E5T TEST Negaliva 1 1 0 0.02 o 0.02 -026 o.93 3A A/16/200713:05PAINT 1.22mg/cm^2 OOOR 145-46-47 FIRST UIJITC DPH TEST TEST Negalive 1 7 0 0.02 0 0.02 -024 0.96 35 4/16/200713:o5PAINT 122mg/cm^2 DOOR 145•46-07 FIFST UNITC DPH TEST TEST Negative 1.94 1 0.03 o.oB o.03 o.oe -0.17 1,u2 3G 4/iG/200713:OSPAINT 122mg/cm^2 UOOR 145-46-47 FIRST UNITC DPH TEST TEST Negalive 2.13 1 o.oB 0.13 O.oB o.13 �0.13 0.08 37 41161200713:U6PAIN7 122mg/cm^2 WALUMIDDLE 145-46�47 FIRST UIJITC DPH TEST TEST Negalive 1.56 1 0.03 0.06 0.03 0.06 -0.02 1.31 30 4/i612oo713:o9PAINT 0.92mg/cm^2 WALL/MIDULE 142-43-04 FIRST UNITC DPH TEST TEST Negalive 1 1 0 0.02 0 0.02 -0.32 1.Z4 s9 A/1e/200713:72PAINT tz2mg/cm^2 WNUWTRIM 142-43-44 FIRST UI�ITC DPH TEST TEST Megalive 1.s7 1 0.01 o.o3 O.o1 O.o3 0.18 t.o3 40 4116/2o0713d2PAINT 122my/cm^2 WNDWTRIM 142-43-44 FIRST UNITC DPH TEST TEST Negative 2.15 1 o,oa 0.09 403 0.09 -0.03 1.03 41 4It6/200713d2PAINT 722mg/cm^2 WNDWTRIM 142-43-44 FIR5T UIJITC DPH TEST TE57 Negative 4.07 1 0.02 0.09 O.o2 0.09 -02 o.9F 42 4I16/2007 13:13 PAINT 122 mg/cm^2 DOOR 142-43-44 FIRST UNIT C DPH TEST TEST Negaliva 1 1 0 0.02 0 0.02 -o.os 1,25 A3 4116/20U713:13PNIJT 7.22mglcm^2 UOOR 742-43-44 RRST UNITC DPH TEST TEST Negative 3.18 1 OJq 0.22 0.1A 0.22 �0,07 0.07 AA 4I1G/2o0713:16PAINT 122mg/cm^2 DOOR 142-43-44 PIRST UNITC �PH TEST TEST Negalive 1.41 1 0 0.03 o o,oa o,oa o.99 A5 A/16/20D713:77PAINT o,92mg/cm^2 DOOR tA2-43-44 FIRST UNITC DPN TEST TEST Negalive 2.85 1 -0.35 1.OB 0.02 0.13 -0.35 1.Od 4G AI1G/2ou713:iBPAINT 2.14mg/cm^2 WNDWTRIM 139�40-41 fIRST UNITC UPH Negative 5.46 1 U.o2 o.oe o.02 o.oB -O.os 1 47 Al16/2007 73;20 PAINT 1.22 mg/cm^2 WN�W TflIM 139-40-41 FIRST UIJIT C �PH Negalive 2.84 1 0.11 0.18 0.11 0.18 0.09 0.93 40 411612007 132o PAMT 122 mg!cm^2 WNDW TflIM 139-40-41 FIRST UIJIT C OPH Negalive 3.34 1 O.U6 0.16 0.06 o.iG -0.19 o.BA 4s 4/16I2007 132o Pl�INT 1.22 mg I cm^2 WNOW TR�M �139-40-41 FIRST UIJIT C DPH Negalive 1 1 0 0.02 0 0.02 0,04 0.03 So A/16/2uo7 13:20 PAINT 1.53 mg/cm^2 WNDW TfiIM 139-40-41 FIRST UNIT C DPH Negative 1.05 1 0 0.02 0 0.02 0.07 1.12 51 A11612007 13;23 PAINT 122 mg/cm^2 WNDW TRIM 136-37-38 FIRST LJNIT C DPH Negative 2.02 1 O.o4 o.OS 0.04 0.09 -o.o9 0.g9 62 A116/2007 1a:23 PAINT 122 mg!cm^2 WNDW THIM 136-37-38 FIRST UNIT C DPN Negalive 1 1 0.02 0,05 0.02 0.05 -0.02 1.12 63 4/16l2007 1323 PAINT 122 n�g I cm^2 WNDW TRIM 136-37-38 FIRST UNIT C DPN Negalive 1.18 1 0.02 0.05 0.02 0.05 0.08 0.90 SA A/ts/20o713:24PAINT 1.23mg/cm^2 WNDWTRIM 136-37-38 FIRST UNITC DPH Negative 1 1 0 0.02 0 O.o2 o.ii 1.04 66 A/16/2007 13:24 PAINT 122 mg/cm^2 WNDW TRIM 736-37-38 FIRST UNIT C �PH Negaliva 1.19 1 0.07 0.09 0.07 0.09 -0.19 1 5G 4/16/2oa773:2APAINT o.92mg/cm^2 WALUMIDDLE 138-37-38 FIRST UNITC DPH Nult t � 0.01 0.04 0.01 a.un o.os 1.75 57 q/16/2007 13:26 PAINT 1.22 mg/cm^2 WNDW TRIM 133-34-35 FIRST UNIT C DPH Negalive 3.85 1 0.09 0.2 0.09 0.2 0.00 0.94 50 4/1s120o713;27PAINT 1.22mglcm^2 WWDWTRIM 13334-35 FIRST UIJITC DPH Negalive 3.99 1 O.o5 0.15 0.05 0,15 -0.11 1.17 59 4116/2U07 13:20 PAINT 122 my/cm^2 DOOR 13334-35 FIRST UIJIT C �Pli Negative 1 1 0 o.U2 0 0.02 -0,10 1.02 60 4/16/2007 13:28 PAINT 1.22 mg/cm^2 DOOR 133-34-35 FIRST UWIT C OPH Negalive 1 1 0 0.02 0 OA2 -U.11 0.77 st A/isl20U71328PAINT o.61mg/cm^2 DOOR 133-39�35 FIRST 11NITC DPH Negalive 1 1 o u.02 0 0.02 -0.35 1,12 62 4/16/200713:29PAINT 122tng/cm^2 WALUMIDDLE 1333435 FIRST UNITC DPH Negalive 1 1 0 oA2 0 0.02 -0.45 1 63 a/is/2oo713:31 PAWT 122mglcm^2 WAIVMIDDLE 130-31•32 FIRST UIJITC �PH Negalive 1 1 0 0.02 o o.U2 -0.07 0.9 GA 4/16I2007 13:32 PAINT 0.31 mg/cm^2 DOOR 130-31-32 FIRST UNIT C DPH Negalive 1.97 1 O.o5 0.2G o.05 0.26 -0.68 1.59 c5 4/1s/2oo7 73:32 PAINT 1.22 mglcm^2 DOOR 130-3132 FIRST UIJIT C DPH Negalive 1 1 0 0.02 0 o.oz -o.i2 o.�s fi6 4/16/7.Otl713:33pAINT 122mg/cm^2 DOOR 73031-32 FIFlST UNITC DPH � Negalive 2,27 1 0.03 0.09 0.03 OA9 -0.03 1.01 G7 4176/200713:33PAINT 1,22mg/cm^2 �ODR 13031-32 FIRST UNITC DPH Nagative 2.29 1 D.Oq 0.1 O.UA 0.1 -0.01 1.U2 60 4I16I20W13:33PAIN( 122mg/cm^2 DOOR 730-31-32 FIRST UNITC DPH Negalive 2,97 1 0.05 0.13 0.05 0.13 -0.02 1,oA 69 A11612007 13:37 PAINT 1.72 mg/cm^2 DOOR 254•55-56 SECOI�� UIJIT C OPH Negalive 1 1 0 o.o2 o 0.02 -0.03 0.93 70 4fi s/2oU7 13:30 PAINT 1.22 mg l cm^2 DOOR 254-55-56 SECOND UIJIT C �PH Negalive 1 1 0 o,o2 0 0.07_ -0.12 1.11 71 AI76/2007 13:39 PAINT 1.22 tng I cm^2 DOOR 25A-55-5s SECOND UNIT C �PH Negative. 1.54 1 0.05 0.08 0.05 o.oe 0.3 1.1 t 72 AI76/200713:39PAINT 122mg/cm^2 WN�WTRIM 254-55-56 SECONO UNITC UPH NegalivE� 1.18 1 o.02 0,05 0.02 o.os o.01 0.92 73 4/16I20u713:A0 PAINT 122 mg/cm^2 WIJDW TRIM 254-55-56 SEGOND UNIT C DPH Negalive� 1.34 1 0.02 0.06 0.02 0.06 0 0.00 74 A116/2007 13;40 P111NT 1.22 mg/ctn^2 WN�W TRIM 25C-55-56 SECOND UNIi C DPH Negaliva 2.98 1 0.03 0.1 0.03 o.t -0.06 o.�a 75 4/1612007 13;41 PAINT 2.14 mg I cm^2 WALLRv11DDLE 254-55-56 SECOND UIJIT C OPh1 Negative 1.sz 1 o.o1 o.o3 o.ot o.oa o.05 1.07 7G 4HC,/2007 13:A2 PAINT 2.75 mg I cm^2 WALUMIDC7LE 251-52-53 SECON� UNIT C DPH Negaliv�e 1 1 U 0,02 0 0.02 0.07 O.U3 77 4/16/2oU713:A2PAINT 122mg/cm^2 WNDWTRIM 251-52-53 SECON� UNITC DPH Negaliv�a 1.71 1 0.05 0.1 o,os 0.1 0.17 7.oD 7B 4/1GI2o0713:43PAINT 1.22mg/cm^2 WNDWTRIM 251-52-53 SECON� UNITC DPH Negaliv�3 1.03 1 0.02 O.o4 0.02 o.on -0.16 1.06 79 A/iG/200713:43PAINT 122mglcm^2 DOOR 251-52-53 SECON� UNITC �PH Negalive 1 1 0 0.02 0 O,U2 0.07 1J5 BO q/i6/200713:44P/11NT O.�J2mg/cm^2 �OOR 251-52-53 SECOND UNITC DPH Negaliv�a 1 1 0 0,03 0 0.03 -021 12 at 4/1G/2o0773:n5PAINT o,92mglem^2 DOOR 249-50-51 SECOND UNITC DPH Neyalive 1 1• 0 0.03 0 0.03 -0.35 1.z9 ti2 4/16/200713:46PAIN� 122mg/cm^2 DOOR 249-50-51 SECONU UNITC �PH Negalive 2.01 1 0.04 0.09 U.u4 409 OA3 0.06 03 A/16/200713:A6PAINT 1.221ng/cm^2 WNOWTRIM 24s-50-57 SECOND UIJITC �Pki Negalive 6.72 1 0.25 0.47 0.25 0.47 -o.o7 o.ee oA 4/16/20o71a:46PAINT 122mg/.cm^2 WNOWTRIM 2a9-50-51 SECON� UNITC DPH Negetive 72s 1 0.02 o.os o.02 o.uG -o.a5 o.e5 a5 AI1G/2o0713:47PAINT 1.22mg/cm^2 WNDWTRIM 246-47-48 SECOI�D UNITC DPH Negalive 1,59 1 0.09 0.12 0.09 0.12 �0.11 0.95 06 4(1G/20U7 13:AD PNNT 1.22 mg I cm^2 WNUW TRIM 246-47-48 SECON� UNIT C DPH Negative 2.54 1 0.02 0.07 0,02 O.o7 -0.35 7.02 n7 411612ao713:nBPMNT t22mglcm^2 DOOR 2A6-47-48 SECON� UIJITC f)FH � N=�zlive t f n n.o2 0 ^,e� 0.!3 !.n2 oa A/i6/20o713;49PMN7 122mg/cm^2 DOOR 246-47-40 SECOIJD UNITC �PH Negaliva 1 1 0 OA2 0 0.02 0.1 1.00 os 4/1s/2oo713:5oPAINi 1.53mg/cm^2 WAlVMIODLE 246-47-4e SECOND UNITG �PH Negalive 1 1 0 0.02 0 0.02 �0,21 1.17 90 A11 6/2007 1 3:51 P/11NT 0.92 mg/cm^2 WALVMID�LE 243-44-45 SECOND UNITC DPH Negalive 1 1 0 0.03 0 o.U3 -0.2 1.2 91 4/isl2oo713:51 PAINT 122mglcm^2 DOOR 243-44-45 SECOND UNITC DPH Negative 1 1 0 0.02 o O.o2 -0.02 f,o9 92 4I16/200713:52PAINT 122mg/cm^2 DOOF 243-44-45 SECOND UNITC DPH Negalive � 1.07 1 0 0.02 0 0.02 -o.1B o,�s 93 4l16/200713:52PAINT 122mylcm^2 WNDWTRIM 243-A4-05 SECON� UNITC DPH Negalive 2.65 1 0.05 oJ2 o.u5 0.12 -0.07 0.95 9A 4/16/2007 13;53 PAINT 1.22 mg/cm^2 WNOW TRIM 243-44-05 SECONO UNIT C �PH Negalive 1 1 0.02 0.04 0.02 O.OA O.o6 o.so 95 4/1G/2oo713:5APAWT 1.83mglcm^2 WFILUMIDDLE 243-04-05 SECONO UIJITC DPH Negalive 1 1 0 0.02 0 0.02 oA2 1.19 9G 4/16/20U713:56hAlIJT 1.22mg/cm^2 DOOR 2A0-41-02 SECON� UNITC DPFi tJegative 1.41 1 0.01 0.03 0.01 O.b3 02 o.s7 97 A116/2o07 13:56 P/�INT 1.22 mg!cm^2 WNDW TRIM 240-41-42 SECON� UNIT C �PH Negalive 1 1 0.02 o.oA o.02 0.04 -0.01 0.09 PO 4/1G/2o0�13:57 PNNT 122 mglcm^2 WALUMIDDLE 240-41-02 SECOND UNIT C DPH Negalive i.U3 1 0,01 0.02 0.01 oA2 -0.30 1.31 J9 4/1G/20U713:58PAINT 1.B3rng/cm^2 WAWMIDU�E 237-3839 SECOND UNITC DPH Negalive 5.35 1 0.06 0.16 o.oG o.16 0.02 1,13 1n0 4HG/2D0713:SB PAINT 1.22 mg/cm^2 WNDW SILL 237-38-39 SECOND UNITC DPH Negalide 2J4 1 0.02 0.08 O.o2 0.08 -0.05 1AM1 101 4/1G/2oo713:59Pl�IIJT 122mglcm^2 DOOR 2a7-3e-39 SECOND UNITC OPH Negative 1 1 0 0.02 0 0.02 -o.oa O.Oe 102 4/1G/2U071A:DOPAINT 122tng/cm^2 DOOR � 233-234-235 SECOIdD 111JITC DPH Negalive 1.9 1 409 0.13 4U9 0.13 02 0.07 103 4/76/20U714;o1 PAINT 0.92mg/cm^2 WNDWiRIM 233-234-235 SECON� UNITC DPH Negalive 1.14 1 0.03 0.09 0.03 099 -0.2B 12 to4 4l1s12oo714;02 PAIIJT 1.22 my/cm^2 WNDW TRIM 23o-a7-32 SECON� UNIT C UPH nlegau�e i i o.01 0,04 0,01 0.04 -0.11 t.12 1o5 4/1G/200714;U2PAWT 1.22mglan^2 WNDWTRIM 230-31-32 SECONU UNITC �PH Negalive 1 1 0.02 0.04 0.02 0.04 -OA2 0.97 106 N16/2o07 14:03 PAINT 122 mg!cm^2 WNDW TAIM 23031-32 SECOND UIJIT C DPH Negal���ve 1 1 p.U1 0.03 0.01 0.03 -0.31 0.99 io7 nllsl2oo77n:o4PAINT 1.22mglcm^2 DOOR 2ao-a1-a2 SECON� UIJITC DPH Negalive i 7 0 0.02 o o.n2 -o.os i.o� 1n0 4/1C,/20071A:U4 PI11NT L22 mglcm^2 WALUMIDDLE 230-31-32 SEWND UNITC DPH Negalive 1 7 0 oA2 0 oA2 o.tA 1.13 709 4/1a/2oo714:onPAMT 122mglcm^2 WALVMIDDLE a5q-SS�SS THIFID UI�ITG DPH Negalive, 1 1 0 0.02 0 0.02 -0.33 1,16 110 Al1G/2oo71q;o9PAINT 7.22mg/cm^2 WNDWTRIM 354-55-56 THIR� UNITC OPli Negalive 2.4 1 o.os o.15 0.09 0.15 0.02 O.sO 111 4/tc,/20o71n:11 P�INT 122mg/cm^2 WNDWTRIM 351�52-53 THIR� UIJITC DPH Negalive 3za 1 0.04 0.12 0.04 0.12 o.t4 O.Ofi 112 AIIGI2DU714;71PAINT 1.22mg/cm^2 WNDWTRIM 351-52-53 THIRD UNITC �PH Negalive 1.03 1 0.02 0.04 0.02 o.oA o.04 0.05 713 4l16/20071A:71PAINT 1.22mg/cm^2 DOOR 351-52-53 THIRD UIJITC DPH Nega�ive 1 7 0.01 0.02 0.01 OA2 -029 1,17 11n 4/1G/2ou774:13PAINT o.�J2mg/cm^2 DOOR 34e-49-5o THIRD UNITC �PH Negaiive 1 1 0 0.03 0 0.03 -0.32 1.29 115 q116/2uo71A:13PAINT 1.22mg/cm^2 DOOR 348-49-50 THIFD U�41TC DPH Nega�ive 1 1 0 0.02 0 0.02 0.00 1.07 116 411GI2UU714:14 PAINT 1.22 mg/cm^2 WNDW TFIM 348-49-50 THIRD UNIT C DPH Negalive 1 1 0.02 0.04 0.02 o.oa o.1 f o.s5 117 AI76120U714:14PAINT 122mg/cm^2 WALVMID�LE 34e-A9�SO THIR� UMTC DPH Negafive 1 1 0.01 o.oa o.01 0,03 0.16 1,2s ite 4N6/POO714deP/�INT 7.22mg/cm^2 WALVMIODLE 343-347 THIRD UWITC �PH Neqatt�e t � o o.oz o o.ox -o.zs �.sq 119 4/16/70U7 74:19 PAINT 1.22 mg/cm^2 WNDW Tf�11M 3a3347 1HIRD UNIT C �PH Negative 3.33 1 U.o4 0.13 o.04 0.13 o.t4 0.9 12o AHC/200714:20PAIid� 0.31mg/cm^2 WNDWTRIM 3A0-41-02 THIRD UNITC DPH Negalive 7.63 1 -0.83 1.4 023 1.18 -0.03 1.4 121 4/16/2oU7 1422 PAINT 1.22 mg/cIn^2 WNDW TRIM 3373839 THIRD U(JIT C DPH Mega.live 1 1 0.02 0.04 0.02 0.04 -0.73 1.U7 122 4I1G/20071423PAINT 1.22rng/cm^2 WNDWTRIM 337-38-39 TFIIRD UIJITC DPH Nege�live 1 1 0 0.02 0 0.02 -0,04 1.1 1?3 4/1G/20071A:23PAIfJT 1.22mg/cm^2 OOOR 337-39-39 7FIIRD UNITC DPH Negative 2.95 1 O.U3 0.09 0.03 0.09 -0.14 492 124 A/1G/2oo71A2GPAINT 1.22mg/cm^2 WNDWTRIM 340-41-02 TNIR� UNITC DPH Negalive 6.23 1 0.06 0.18 0.06 0.19 -0.75 0.92 12G 4ASl2uo7iA:2sPAINT 1.22mglcm^2 W�LUMI�DLE 34u-41-42 THIRD UNITC DPH Nege�tive 2.s� � -o.as i.ss o.oe o.�s -o.ss t.ss 12c 4liG/20U)1428P/11NT 1.22mglcm^2 WALL/MI�OLE 334-35-36 THIRD UNITC �PH Neg:,live 1 1 0 0.02 0 0.02 0.06 0.93 127 4/1G/20D714:29PAINT 1.23mglcm^2 WAlUM1UDLE 334-35-a6 THIRD 11NITC DPH Negalive 2.28 1 0.05 D.1 U.US o.1 -o.ofi L2A 12B Altsl2oo7 1A:2s PAINT 1.22 mg!cm�2 WNDW TRIM 334�a5-3� 1HIRD UNIT C �PH Nega�ive 175 1 o.ot o.04 o.n� o.on -o.t o.ss 129 4I16/200714:30PAINT 1.22mB�cm^2 WN�WTFIM 334-35-36 THIRD UIJITC DPH Nega�ive 2.a9 � o.o� o.ta o.o� o.ts -o.n o.�s 130 4/16/20U]14:32PAINT 7.�2mp/cm^2 WNDWTRIM 330-3132 THIRO UNITC �FH Neg�n�ive 1.39 1 0.02 0.05 0.02 0.05 0.07 1.00 131 4I1612uu7 14:33 PA1NT 1.22 mg l cm^2 UOOR 33U-31-32 THIRD UNIT C DPH Negalive 1.55 1 0.�1 o.OA o.ot o.04 0,01 u.J4 132 4116/2oo71A:33PAINT 122mglcm^2 WF�IUMIDOLE 33D-3132 THIRD UNITC DPH Negalive 1.66 1 o.o2 0.06 0.02 0.06 -0,28 1,35 133 4/7W2oo7�4:3e�AINi 1.53mg/cm^2 WAWMIDDLE 160FIRST UNITD �PH Negalive 1 1 0 0.02 0 OA2 0.04 1J3 134 4/7s/2oo7 74:39 PAINT 1.22 mg/cm^2 WNDW TRIM 16o FIRST UIVIT D �PH Negalive 1 1 0 0.02 0 0.02 -0.07 o.sF 135 4/16/20U7 74:30 PAWT 122 mg/cm^2 WNDW TRIM 760 FIRST UNIT D- DPH NeJa1N0 3.52 1 OA7 0.78 0.0� 0.18 -O.OB 0.08 136 411G720071A:39 PAINT 1.22 mg/em^2 DOOR 160 FIRST UIJIT O DPH NagalNe i � o o.u2 o u.o2 -o.ot 0.06 137 4/1G/2007 14:A0 P/�INT t.22 mg/cm^2 DOOR 760 FIRST UNIT D DPF� Negalive 1 1 O 0.02 O 0.02 -O.OG 1.d3 13o n/1G/�n�i714:A1 F/11N'� t.22 mg/cm^2 DOOfa 157 FIRST UNITD OPH Negelive 1 � 0 0,02 U 0.02 -0.04 U.95 �3s qne�2ou7�a:4t PAINT lzzmgtcm^2 WNDW7RIM ts1 FIRST UIJITD DPH Negalive 2,29 t o.u2 o.os o.02 o.os -oze o.ss �40 4HG/?_oU714:A2PAINT i22mg/cm�2 WNDWTRIM 162FIR5T UNITD DPH Neyalive 1.93 1 o.02 u.o7 0.02 0.07 -o.ot o.05 141 411G/2007 14;42 P11W7 1.53 mg/cm^2 WALI/MIDDLE 162 PIRST UNIT D DPH Neqalive 1 1 0 0.02 0 0.02 -o.�a 1.27 1A2 4/16/2oo71A:4�PAINT 1.22mg/cm^2 WALUMIDULE 1s3FIRS7 UNITD �PH Ne��aiiva i � o o.oz o o.oz -o.i ti tA3 4/i6/20071A:A6 PNNT 1.23 mg/cm^2 WNDW SILL 163 FIRST UNITD OPH Negallve 1 1 O 0.02 0 0.02 -0.13 0.91 74n 4/ie/2no71�:AOPAINT t.z2mg/crn�2 WNDWSILI t54FIRS7 UIJIT� DPH Neqa�ive 1 1 0 0.02 0 0.02 0,03 1.07 tA5 nHe/2oo7 1A:4o PAIIJT 122 mg!cm^2 WNDW SILL 184 FlRST UNIT� �PH Nega�ive 5.51 1 0.13 0.31 0.13 0.31 O.OB 0.9 tAS 4/1G/20o714:49PAINT 122mg/cm^2 WNDWSILL 165FIR5T UNITD DPH Negalive 1 1 0 0.02 0 092 -0.7 o.os 1A7 4/1GI2oU714:5o PAINT 1.22 mglcm^2 WNDW SILL 165 FIRST UNIT D DPH Negative 3.16 1 0.05 oJ4 0.05 0.14 -o.t5 oJs 1A0 4l1�I2oU714;50 PAINT 1.22 mg/cm^2 WALUMIDULE 765 FIRST UIJITD DPFI Ne3aliva 1 1 0 0.02 0 0.02 -U,29 t.o4 1A9 41�6/2u071A:61PAINT 1.53mg/cm^Z WAWMIUULE 16sFIR5T UNITD DPFI Negalive 2.42 1 o.ot o.ob o.ot o.04 0,06 1.Oa tSU 4/i�@�07 74:52 PAINT 122 mg/cm^2 DOOR 166 FIRST UNIT D DPH Negalfve 1 1 U 0,03 0 o.oa 0.19 1.1 151 4/16/20071A;52PAIIJT 122mglcm^2 DOOR 166FIR5T UNITO UPH Negalive 1 1 0 0.02 0 oA2 -0.07 o.sl . iF2 4/1G/20071A:53P�INT 722mg/cm^2 DOOf7 767FIRST UIJITD DPH Negalive 1 1 0.02 0.09 0.02 0,04 -0.32 1.0� � 153 4H6/20b714:53PAINT 1.22mg/cm^2 �OOR 167FIRST UNITD �PH Negative t.t2 1 o.ot o.o3 o.ot o.03 -0.01 0.87 154 4/tc/2007 74:55 PI11NT 1.22 my/cm^2 DOOR 260 SECON� UNIT 0 DPH � Negaliva 1 1 0 0.02 o u.02 -0.05 0,93 155 4/16/2no7 14;55 F�INT 123 mg!cm^2 UOOR 260 SECOND UNIT D �PH Negalive 1 1 0 0.02 0 0.02 0.09 1.N 156 4/1G@o071M1:57 I'AINT 722 mg/cm^2 WNDW TRIM 263 SECONO UIJIT� DPH Negaiive 2.72 1 O.u2 o.oB OA2 O.UB 0.01 1.15 157 4/16/200714;50PAINT 1.?2mg/cm^2 WNDWTRIM 263SECOND UNITD DPH Ne�galive 2.56 1 o.os o.12 oA5 0.12 o.tt 1.05 150 4/ifi/200714:59PAINT o.92mylcm^2 DOOR 264SECOND UNITD DPH Negalive 7 1 0 0.02 0 0.02 -o.3z 7.ts 159 4116/20071a:6B PAINT 122 mg!cm^2 D�OR 2sA SEGOND UNIT� DPH NE+galive 1.33 7 0.1 o,it o.t 0.11 oJ9 122 1so 4/ts/zoo7 1n:5e PAINT 1.53 mg/cm^2 WAWMIODLE 26G SECOND UNIT D DPH Neyalive 1 1 0 O.D2 0 OA2 -0.11 0,97 7G1 A/1e/2ou7 75:0o PAINT 1z2 mgl cm^2 WALUMIDDLE 267 SECOND UNIT D DPH Negalive 1 1 0 0.02 0 0.02 -0.71 0.00 1 G2 4/16/2007 15:01 Pl11NT 1.22 mg f cm^2 WNOW SILI 267 SECOND UfJIT D �PH Negalive 1.9s 1 O.u2 0.06 D.02 0.06 -0.2A 0.84 163 AI1c12007 15:03 PAINT L22 mg I cm^2 DOOR 360 THIRD - UNIT D DPH N�:gative 1 1 0.01 OA2 0.01 0.02 -0.04 0.02 iG4 4/16/200715:03PI11NT 122mg/cm^2 OOOR 360THIRD UIJITD DPIi NAgalive 1 1 0.01 0,03 0.01 U.03 0.1 U.99 1Cr5 4/1G/20U7 15:06 PAINT 1.22 mg I cm^2 WN�W SILL 363 TNIRD UNIT D DPH Negalive 2.94 1 0.03 OJ o.oa o.1 -0.01 0.7G 166 4/Ifi/20o715:05 PAINT 1.23 mg/cm^2 WNDW SILL 363 THIRD UNIT D DPH Negalive 1.92 1 DA6 0.11 0.06 0.11 0.ot O.B7 1G7 4/tc/2no7 16:os PAINT a,as mg I cm^2 WIILVMID�LE 363 THIRD UfJIT D DPH Nagalive 1 1 0 0.02 0 0.02 022 0,61 t6e 4/is/1_OO716:07 PAIIJT 1.a3 mg/cm^2 WAWMIDDLE. a64 THIFlD UNIT D DPH Negalive 2J , 1 Qo2 o.s2 0.01 0.04 0.02 0.92 16s 4/iG12o0715:07 PAMT 122 mg!cm^2 WNDW SILL � 364 THIRD UNIT 0 DPH � Negalive 1.45 7 0.01 0.03 o.01 0.03 -o.ov o.ea 170 4/1G/2U0715:11PAINT 1.22mg/cm^2 WNDWSILL 3677HIR� UNITD N_galive 2.07 1 o.tt 0.15 0.11 0,15 0,15 t.us 171 4/10/20071.5;71 PAINT tz2mglcm^2 WNDWSILL 3s7THIRD UIJITD Nagauve 1 t o o.oz o o.oz o.ot o.as 172 q/1s/zo0715:12 PAINT 122 mg/cm^2 WNDW SILL 367 THIRD �UIJIT D � Negalive 1.34 1 0.02 0.05 0.02 oA5 -0,05 0.9 ' 173 AH6I2UD715:12P�INT 122mg/cm^2 DOOR � 367THIRD UNITD Negalive 1.98 1 0.06 0.11 0.06 o.it o.ot u,9 174 4/1fi/?_OD715:14PAINT 2.A4mg/em^2 WALUMIDDLE HAIL THIFlD UNITD Negalive 4,05 1 0 0.83 0.01 0,05 D 0.93 ' 175 4/1G/200715d6PAINT 1.2Zmg/cm^2 DOOR 77oFIRST UIJITE Negalive 1 1 0,02 0,05 0.02 0.05 -0.01 0,93 ' • 176 4f1G/2oo715;1sPAiIJT 1.23mg/cm^2 DOOR 17oFIR5T UIJITE Negative 2.93 1 0,02 o.os o.02 o.os o.03 o.os , , 177 4/1s/20o715:1s PAINT 1.22 mg/cm^2 DOOR 17U FIRST UNITE Negalive 2.11 7 oze o.24 o.2e oz4 o,tz to7 � � 170 4/iG/200715;17 PAINT 1.22 mglcin^2 WNUW SILL 170 FIRST UNIT E 17B Ali6/200715:17p/11NT o.stmg/cin^2 WALVMIDDLE 170fIR5T UfJ1TE Negalive 1.1 1 0.03 0.05 0.03 0.05 0.05 0.92 10o A/16/2007 15:18 PAINT 1.04 mg/cm^2 WALVMI�DLE 170 PIRST UNIT E Null 1 1 0 O.oS o 0.05 0 7,�p '101 4I16/20071G;18 P�II��i 1.22 mglcm^2 WNDW SILL 173 FIRST UNIT E Negalive 1 1 0 0.02 0 0.02 0.03 o.e4 to2 nHG/2uo7152o PqMT 1.23 mg/cm^2 wNDW SILL 173 FIRST UNRE Nega�ive 1.92 1 o.ps o.t o.06 o,t -0.1 1.ot 183 4/16/2oo715:21 PAINT 1.22 mg/pn^2 WNDW SILL 174 FIRST UNITE Negative 1.�7 1 o.oB 0.12 O.UB 0.12 -0.03 1,12 104 4/16/200716;21 PAINT 1,22 mg/Cm^2 WNDW SI�L 174 FIRST UNIT E NegaliVe 2.35 1 0.15 0.19 0.15 0.19 -0.02 0.09 106 4/iG/2007152Z PAINT 1,53 mg/cm^2 WALVMIDDLE 174 FIRST UIJIT E Negative 1 1 a.04 0.06 0.04 0.06 OAS 0.91 1nG 4/is/2oo715:23 PAMT LU3 mg/cm^2 WAWMIUU�E 177 FIRST UNIT E Negative 1 1 0 0.02 0 0.02 -0.35 1,16 107 4/16/2007 15:23 PAINT 123 m J cm^2 WAWMIDDLE Negaiive 1 1 0 OA2 0 0.02 0.09 u.J9 9 177 FIRST UNIT E Negalive 1 1 0 o.U2 0 0,02 -0.04 0.99 7AIt 4/iG/200715:25PAlIJT a.s2rng/cm^2 WALUMIDDLE 271SECOND UNI�E Nu�� i toB 411G/2uo715:2s P111NT o.31 mglcm^2 �OOR 271 SECOND UIJITE 1 0 0.02 0 0.02 -0.29 1.9s 1�JO A/16/2007 152G PAINT O.G1 m /cm^2 DOOR Null � � 0 yy yy p y9 99 0 �n�9 '� 271 SECOND UIJITE Negalive t t o.01 0.05 o.ot o.05 -o.s 7.q1 191 4/16/2007 1526 PAINT L22 my/cm^2 C100R 271 SECOND UNIT E Negalive 3.39 1 0.17 0.25 0.17 025 0.12 0,01 192 Al16I2UU715:27 PAINT 1.22 mg/cm^2 WNDW SILL 271 SECOND UNRE Negative 2.46 1 0.13 0.18 0.13 OJB o.16 1.05 193 4I16/20U715;27 PAINT 1.22 mg I cm^2 WNfJW SILL 271 SECOND UNIT E Negalive 2.18 1 0.4 0.3 0.4 0.3 0.4 7.7_ 194 4/16/2UU715;28 PAINT 1.22 mgl cm^2 WNDW SILL 271 SECOND UNIT E . Negalive 3.40 1 0,9 0.37 0.3 0.37 0.12 1,12 195 A/1G/200715:2fl PAWT 1.22 mg/cm^2 WNDW SILL 271 SECOtJD UNIT E Negativa 1,04 1 0 0.02 0 0.02 -02 0.87 19G 4116/2007 75:30 PAINT 1.53 mg I cm^2 WALLIMIDDLE 272 SECOND UNIT E Negative 1 1 0 0.02 0 0.02 -0,31 1.00 197 4/16/200715;3o PAIIJT o.92 mg/cm^2 WAWMI�OLE 272 SECOND UNIT E Negative 1 1 0 0.03 0 0.03 �02 1.01 190 4/iG/2o07 75:32 P111NT 722 mg/cm^2 WALUMIDULE 274 SECOND UNIT E Negalive 1 1 0 O.o2 0 0.02 0.02 7,�8 1B9 4/16/200715:32 PAWT 1,72 my/an^2 WNDW SILL 27q SECOIJD UNRE Negalive 1 1 0 0.02 0 0.02 -o.14 1.o0 20o A/16/2ou7 15:33 PAINT 122 ing 1 cm^2 WNDW SILL 274 SECOND UIJIT E Negalive 1 1 0 0.02 D o.0�2 O.n5 0.97 201 4I16/20U7 15:33 PAMT L22 mg I cm^2 WNDW Slll 277 SECOND UNIT E � Negalive 1.52 1 O.oB 0.1 0.00 0.1 0.05 o,Dt 202 A/iG/20o7 15:34 PAINi 7.22 mglcm^2 WNDW SIIL 277 SECONO UNIT E Negative t.st 1 o.7s o.77 o.1s o.17 -oJ1 1,oi 203 4I1G/2uU715:36PAINT 1.53mg/cm^2 WALUMIDDLE HA�L SECOND UNITE Negalive 1 1 D 0.02 0 0.02 A.1�J 1.16 204 A/�16/2007 15:30 PAINT 7.22 mg/cm^2 WALUMIODLE 37o THIRD UPJIT E DPH Negative 1 1 0 OA2 0 0.02 -0.30 1.og 205 4A6/2oo715:39 PAINT L22 mg/cm^2 WI1lVMIDDLE 370 THIRD UIJIT E DPN Negalive 1 1 0 0.02 0 0.02 -027 12M1 206 AH6/2DO715;AO PAINT 1,22 mg/cm^2 WAWM�DDLE 377 THIRD UNITE DPH Negative 1 1 0 0.02 0 0,02 -0.4 1.3 207 AHSl2oo7 t5;42 PAINT 7.22 mg/cm^2 DOOFi 377 THIRD UNIT E OPH Nega�ive I.UM1 1 0 0.02 o O.o2 -O.AS 1.0� 2UB 4/1Gl2U0715:42 PAIIJT 122 mg/cm^2 DOOR 377 THIRD UNIT E DPII Negalive 1.89 1 0.04 0.1 0.04 D.1 -U.15 U.�JO 209 A/16/2007 75:42 FAINT 122 mg/cm^2 WN�W SILL 377 THIRD UIJIT E DPN Negalive 3A2 1 0.4 0.4 0.4 0.4 0.17 U.90 210 AliG/2o07 15:43 pAINT 122 mg I cm^2 WNOW Slll 377 THIPD UNIT E DPH Negalive 3.iB 1 0.q 0.4 o.A o.A 0.11 0.92 211 4/76/2UU71;:40PAlIJi 1.B3iny/qn^2 WAIUMI�DLE 18oFIR5T UMTF pPH Negative 1 1 0 0.02 0 U.02 -O.OA 1,OA 212 4/16/2007 1,5:48 PAINT 0.61 mg/cm^2 WALUMIDDLE 180 PIRST UNIT F UPH Negative 1 1 0 0.04 o O,o4 -u.39 1.a4 213 4116l2007 15:4e PAINT 1.22 mg I cm^2 DODR 180 RRST UIJIT F DPH Negalive 6.a1 1 0.11 0.33 OJ 1 0.39 -OA'J 0.'�G 214 4NG/2oo7 15:49 PAINT 1.22 mg I cm^2 UOOR 18o FIRST UNIT F DPH Negalive 3.13 1 U.12 0.2 0.12 02 -027 O.�J6 215 A/16/2007 t5:51 PAWi L22 mg/cm^2 DOOR 183 FIRST UNIiF OPH Negativa 1 1 0 o.o2 0 0.02 �0.00 0.70 216 AIi6/20o7 15:52 PNNT 1.22 my l cm^2 WA�VMIDDLE 183 FIRST UIJIT F DPH Negalive 1 1 0 0,02 0 0.02 -OAS 1.2 217 A/16/2u07 75:53 PAINT 1.22 mg/cm^2 WALVM�bULE 184 FIRS? UNIT F DPH Negalive 1 1 o o.o2 o 0.02 -0.78 t.31 210 4/1G/200715;53PAIN� 0.31mglcm^2 WNDWSIII 184FIRST UNITF UPH Negative 1 1 0,01 0.08 0.01 0.09 -0.64 1.2� 219 4/16l20(l7 15:54 PAINT L22 mg/cm^2 WNDW SILL 187 FIRST UIJIT F DPH Nega�ive 1 1 0 0.02 0 0.02 -0.15 0.79 220 4/16/200715:54PAINT 122mg/cm^2 WNDWSILL 187FIRST UNITF DPH Negative 1 1 0.01 0.0� U.U1 0.03 0.21 0.76 221 4/1G/2o071,:57 PAINi 122 mg/cm^2 WNDW SILL 2BO SECOIJO UNIT F �PH Negalive 1 1 0 0.02 0 0.02 0.06 o,g7 222 4/1s/20u7 75:57 PAINT 1.22 mg I cm^2 WALI/MID�LE 2BO SECOIdD UNI7 F DPH Negalive 1 1 0 0.02 0 o.u2 -0.21 1.57 223 Af16/20o715:58PAINT 123mg/cm^2 UOOR 2805ECOND UNITF DPH Negalive 4.92 1 0.09 0.25 O.o9 025 0.07 o,��J '124 4NG/20U715;59 PAINT 1.22 mg/cm^2 WALUMIDDLE 28o SECOND UNI7F OPH - Negalive 1 1 0 OA2 0 0.02 02 1.07 225 4/16/200716:00 PAINT 722 mglcm^2 WALVMIDDLE 2B3 SECOND UNIT F DPH Negaliva 1 1 0 0.02 0 OA2 -0.17 1.15 22fi 4/1G/2007 i6:00 PAINT 122 mg/cm^2 WNbW SILL 283 SECON� UIJIT F DPH Negalive 1 1 0.01 0.02 0.01 0.02 -0.18 0.74 227 A/1612oo71G;o2 PAINT 122�ny/an^2 WNDW SILL 286 SECON� UNIT f �PH Negalive 1.3s 1 0.01 0.04 O.ul 0.04 -0.41 0.93 220 4/16/2007 1G:o3 PAINT 122 mg l cin^2 WNOW SILL 286 SECOIJ� UNIT F �PH Negalive a.ee 1 0,07 0.18 0.07 0.18 u.10 7.04 229 AAG/2UO7 1G:04 PAINT 1.22 rng!cm^2 WNbW SILL 2B7 SECOND UNIT F �PH Negalive 1 1 0 O.o2 0 0.02 �0.31 o.�JS 230 4/1612u071G;05PAINT 1.22mylcm^Z WALUMIDDLE 2B75ECOND UNITF �PH Negalive 1 7 0 O.o2 0 0.02 O.ot 127 291 A/16/2007 16:U5 PNNT 7.22 mg/cm^2 DOOR 287 SECOIJ� UNIT F �PI-1 Negalive 1 7 0 0.02 0 0.02 -0.07 t.Od 232 A/16/20U7 1s:07 pAINT 1.22 mg!cm^2 DOOR 3B0 THIRD UNIT F DPH Negative 2.07 1 o.o3 0,08 o.ua 0.06 -U.13 1.7�J 233 4/16/2o0�1G:o7 PAINT 1.22 mg/cm^2 DOOR 380 THIRD UIJIT P UPH Negalive 3.s5 1 o.o7 0.1e O.o7 0.18 -0,15 0.92 234 4/16/2UU7 iG08 PAINT 0.61 mg/cm^2 WNDW SILL 380 THIRD UNITF �PH � Negalive 1 1 0 0.02 0 0.02 -0.03 t.ql 235 A116/20071G08PAINl� 1,22mglcm^2 WN�WSILI 38oTHIRD UNITF UPH Negalive 1.5A 1 p.01 O.U3 O.UI o.o3 -0.00 o.n4 236 4116/2007 16:09 PNNT 1.83 mg I crn^2 HALL 380 THIFID UNIT F DPH Negalive 1 1 0 0.02 0 0.112 -0.13 1,01 237 4/16/200716:13 PAWT 1.22 mg/cm^2 DOOR 383 THIRD UIJIT F DPH Negalive 2.36 1 OA2 0.08 0.02 0.00 0.13 7.01 2ao mi�ixoo�is:ia rniNr 122 rn9/mn^2 DOOR 383 THIRD UWIT F OPH Negalive 129 1 0.03 0.06 0.03 O.o6 0.04 0.�1 23s 4/1G/2UO716;16PAIN�T 122my/cm^2 UOOR 383THIR0 UNITF OPH Negalive�. 1 1 0 0.02 0 0.02 Ozo O.sS 2AU 4/16/2007 16:10 PI11NT 1.22 mg/cm^2 DOOR 387 THIR� UNIT F �PN Negalive 7.3 1 0.01 0.03 o.ul 0,03 -0.27 U.04 2A1 A/16/2U071G:1s PAINT i22 mglcm^2 WNDW SILL ae7 THIRD UNI�F �PH Negalive t.ss 1 0.01 O.OM1 o.01 0.04 0.14 0,92 2A2 A/16/2ti07 1G:19 PAWT 122 mg/cm^2 WNUW SILL 387 THIR� UNIT F DPH Negalive: 1 1 0.01 0.03 0.01 0.03 0.12 L02 243 4/16/2UO7 16:29 PNNT 19.80 mg/cm^2 CALIBRATE-BACIC Posilive 7.on t 1 o.t t o.i u.s o2 Z E H R E N AND ASSOCIATES February 19,2008 Mr. Charlie Davis Chief Building Official Town of Vail 75 South Frontage Road Vail, CO 81657 RE: Manor Vail Existing Unit Renovations Dear Charlie: Attached is an application for a Building Permit for and existing unit at Manor Vail that wishes to renovate while the lazger project is under construction. The work will be done by the same contractor and design team as the lazger project and it has been proposed under all of the existing terms and permit conditions of that lazger project. Per out discussion,we are submitting this under the"Commercial Tenant Finish/Improvement"Application and Checklist. We make the following notations with regazd to the checklist: • Construction plans stamped and signed by a Colorado State Licensed Architect o Provided • Original Building Construction Type per IBC chapter 6 o Type VA-no change to approved Manor Vail Project • Tenant suite or tenant space number o Noted on drawings • Tenant space location identification within overall building o Shown in key plan on drawings • Floor Plans with existing and proposed wa11s o Provided • Reflected ceiling and finish plan o Provided • Door Schedule o The information for the Doors is provided on the plans. • Means of egress plan o There will be no change to the occupant load for this unit. The means of egress is unchanged from that reviewed for the master�project. • Areas requiring two(2) exits o None • Windows o Window shop drawing provided ARCI IITECTURF • PLANNING • INT�RIORS P.(�. Gox 1976 •Avon,Coloiado 81G20 • (970)94�3-0257 • FAX(970)949-1Of30 •vail�+zehren.com •wwwzehren.coni • All areas and rooms accessible ' o Not applicable—Private Residence • Accessible maneuvering clearances o Not applicable—Private Residence • Service counter-tops and built-in work stations accessible o Not applicable—Private Residence • Bathroom facilities accessible o Not applicable—Private Residence • Sepazate sex bathroom facilities o Not applicable—Private Residence • Toilet room floors/walls finish schedule o Not applicable—Private Residence • Occupancy sepazations o No change will occur to the occupancy sepazations • Fire-stopping o Will be per the Manor Vail master MOU • Plumbing,Electrical, and Mechanical Plans stamped by a Colorado State Licensed Engineer o Minor changes to domestic water and electrical withing the unit will be performed design/build by licensed plumbers and electricians. • Fire/smoke dampers o None Required • Fire sprinkler plans o Provided • Fire Alann plans o Provided I will be happy to answer questions. Sincerely, ti Brian Sipes,AIA Principal Zehren and Associates, Inc. CC: Brett Huether Kelsey Dunaway Kirk Johnston ****�******�**************+****�********��**+*******�***�*+*�******************************* TOWN OF VAIL, COLORADO Statement *************+�****�***��+*************�**********************************�**�***»:********** Statement Number: R080000794 Amount: $1,579.55 05/27/200808:15+ AM Payment Method: Check Init: RLF Notation: #8523 .GE JOHNSON ----------------------------------------------------------------------------- Permit No: B08-0035 Type: ADD/ALT MF BUILD PERMIT' Parcel No: 2101-081-0201-8 Site Address: 595 VAIL VALLEY DR VAIL Location: MANOR VAIL 285 Total Fees: $1,579.55 This Payment: $1, 579.55 Total ALL Pmts: $1,579.55 salance: $0. 00 ********************************************************************************�+********** ACCOUNT ITEM LIST: Account Code Description Cu�rrent Pmts -------------------- ------------------------------ ------------ BP 00100003111100 BUILDING PERMIT FEES 451.85 PF 00100003112300 PLAN CHECK FEES 293 .70 UT 11000003106000 USE TAX 4� 830.00 WC 00100003112800 WILL CALL INSPECTION FEE 4.00 ' ------------------------------------------------------------------------------ NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL T/MES .� �owxoFVn� � Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139 f. 970.479.2452 inspections 970.479.2149 ELECTRICAL PERMIT Permit #: E08-0170 ( �b� -�a�� AMF Project #: PRJ08-0050 Job Address: 595 VAIL VALLEY DR VAIL Status . . . : ISSUED Location.....: MANOR VAIL 285 Applied . . : 07/23/2008 Parcel No...: 210108102018 Issued . . : 07/31/2008 Expires . .: 01/27/2009 OWNER ROBERT J. RODGERS TRUST 07/23/2008 ROBERT J. RODGERS TRUSTEE 529 LONGMEADOW CIR ST CHARLES IL 60174 APPLICANT ENCORE ELECTRIC 07/23/2008 Phone: (970)949-9277 PO BOX 8849 AVON CO 81620 License: 331-E CONTRACTOR ENCORE ELECTRIC 07/23/2008 Phone: (970)949-9277 PO BOX 8849 AVON CO 81620 License: 331-E Desciption: INTERIOR FINISHES: UPGRADE LIGHTING AND MISC ELECTRICAL Valuation: $0.00 Square feet: 1000 .,«.«.,**.***....,.,,..**..,�.**.,***.,.,..,,.,,..,,..,.....................,,.... FEE SUMMARY «.,,..*..,.**.,,,.,..,*.*.**..,,**..«...,«.,....«.,.,,..,......*.,,......*..**.***..,,. Electrical Permit Fee---------> $51.75 Total Calculated Fees--> $55.75 Investigation Fee--------------> $0.00 Additional Fees----------> $0.00 Will Call Fee--------------------> $4.00 Use Tax Fee-------------------> $0.00 TOTAL PERMIT FEE---> $55.75 '� Total Calculated Fees-------> $55.75 Payments-----------------> $55.75 �', BALANCE DUE---------a $0.00 *.,...........*..*.**,,.,,.,...,,»,,,.,...,.,,...,,.....,,......�....,�..,.,..�...,*..,,..,..,..,,.,,...,,.,,..*..*«*.....*.*.,,...*..»..,,....«,....,.....,,,.....,«.,......*..**...*.,,�.. � APPROVALS Item: 06000 ELECTRICAL DEPARTMENT 07/23/2008 JLE Action:AP w********�t�t***tr�k**i`*i`Yri`lrtrirR#trrti!#a41rtr#ir*1r+!*************A*************ir*fr******************4**t�ki`�kietr4**tr#ir*itirf*f*A*���tit*f4+4#k##'+*#+k*#*#+Y*A*1�**1r**k*#i`irf 1r f'tr�kir�tfrfrtrtr##ir CONDITIONS OF APPROVAL Cond: 12 �i (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. ,,..,,.,,,,.�.,...�.,*�..,�*.*.,.�,.�,.*...,,..,.,,..,,,,,,...................�.,...,«...,...,........��....,.,,....,...�....,..,��.,,..,.**,,....,*.,*.«...,*«*..*.*...k.,......*.*...........» DECLARATIONS I hereby acknowledge that I have read this application,filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review appraved, International Building and Residential Codes and ot er ordinances of the Town applicable thereto. REQU FO INS CTION SHAL E MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 97 .479. 149 OR AT OUR OF E FRO :00 M -4 PM. �-- .il�� Signature of Owner or Contractor � Date � —�_ - �C.C� � Print Name elec_prm_041908 ******���*�***�*****�*����*�**********��+++*�**++++*++******************���********�*******� TOWN OF VAIL, COLORADO Statement *��****��***�****++�*****�+�******************��****��*****�************�*�*�*************+* Statement Number: R080001270 Amount: $55 .75 07/31/200812 :34 PM Payment Method: Check Init: DDG Notation: Encore 1963 ----------------------------------------------------------------------------- Permit No: E08-0170 Type: ELECTRICAL PERMIT Parcel No: 2101-081-0201-8 Site Address: 595 VAIL VALLEY DR VAIL Location: MANOR VAIL 285 Total Fees: $55.75 This Payment: $55.75 Total ALL Pmts: $55 .75 Balance: $0. 00 *****************************************��*�***+*****�****************��******��****+****** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ -- ---------- EP 00100003111100 ELECTRICAL PERMIT FEES 51.75 WC 00100003112800 WILL CALL INSPECTION FEE 4.00 � > Development Review Coordinator 75 South Frontage Road Vail, CO 81657 Phone: 970-479-2128 , Fax: 970-479-2172 � � Inspections: 970-�79-2149 ����!� � TOWN OF VAIL ELECTRICAL PERMIT APPLICATION Project Address /�n 11 �.��� � 1a , ��5 �.s�k I � VGc 1 I e�Y L�t^� v'�' , Project#: �` �' � WS� " , Building Permit#: �Q�C`���� "1r� Contractor Information ���,! ��r{� � ��/» ) Electrical Permit#: ��J V Company: ��'l C d✓'e �IC'C�Y'I C __�✓�C_: ! ,n/� /� {� Detailed Description of Work: Company Address:^�� (�' (e�Cc'i 1�t�- 1�� City: �VU4'l State:��Fax:9TD_ _q� 1�1P�.r"Alli° U��?���r��. U✓1CY Contact Name: �i^� C �✓t��� � � �r '/� i//,�v� �'l► s�e�lu�rPOu�� lec_f�'�c� 1 Contact Ph: Cell: 7/���C�J�`/7�-�.J E-Mail: ��"���� � (Use additional sheet if necess�ry) Town of Vail Contr ctor Regi ' o: � �— COMPLETE SQ.FOOTAGE FC)R AREA OF WORK AND X � � VALUATION OF WORK(Labor&Material) C actor Signat e(re ed) Amount of SQ Ft Electrical$ � ���f�� Property Information Parce�#:���1 C7� 1 ���1 � Work Class: Legal Description:Lot# Blk# New( ) Addition( ) Remodel( Repair( )Other( ) Subdivision: Building Type: Job Name: I d(G1�4�� �JL,t► � � 5�� Single-Family O Two-Family O Multi-Family O Commercial( ) Townhome�Other( ) Owner Name: Mailing Address: Date Received: (For Parcel#Contact Eagle County assessors Office at 970-328-8640 or visit www.eagleco u nty.u s/patie) Architect( ) Designer( ) Engineer( ) Name: Phone: Fax: , � � (�--�"_� E-Mail: � �� � � f� �� .�� JUL 21 1008 � TOW�I p�qlL � - i . lUR11�! F� � Amendment to the 2002 N.E.C.Town of Vail Ordinance 4. Series of 2005 ❑ Overhead services are not allowed in the Town of Vail. ❑ Underground services shall be in conduit(PVC)from the utility transformer to the electric meter, main disconnect switch, and to the first electrical distribution circuit breaker panel. ❑ The main disconnect switch shall be readily accessible, and located next to the meter on the exterior wall of the structure.All underground conduits are required to be inspected before back-filling the trench. ❑ In multi-family dweliing units,no electrical wiring or feeder cables shall pass from one unit tc�another. Common walls and spaces are exempt. ❑ NM Cable (Romex) can be used only in single and multi-family dwellings. Type NM cannot be used in any building mixed with Type A,B.E,F,H,I,M 8S occupancies. ❑ Aluminum conductors smaller than size#8 are not permitted. TOWN OF VAIL ELECTRICAL PERMIT GUIDELINES ❑ All installations of exterior hot tubs or spa's require a DRB approval from planning. This application will not be accepted without a copy of the DRB approval form attached (if applicable). ❑ If this permit is for installation of an exterior hot tub or spa on a new elevated platform or c4eck over 30"above grade, you must also obtain a building permit. ❑ If this permit is for installation of an exterior hot tub or spa on any existing deck or elevated platForm, a structural engineer must review the existing condition and verify that it will support the added concentrated load.Please provide a copy of the structural engineers wet stamped letter or drawing with this application. ❑ If this is a remodel in a multi-family building with a homeowners association,a letterof perrnission from the association is required. ❑ If this permit is for a commercial space,two(2)sets of stamped drawings are required.E/ectrical one-line and panel schedules are required if load is added or distribution is altered. I have read and under n e a ve. / � � ��� g atur Date ' If you have any questions regarding the above information or have additional questions, please contact the Town of Vail Electrical Inspectorat 970-479-2147.The inspectorcan be reached on Monday thru Friday mornings between the hours of 8am and 9am. You may also leave a voice mail and the inspector will call you back. i TOWN OF VAIL FIRE DEPARTMENT VAIL FIRE DEPARTMENT I 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2135 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES SPRINKLER PERMIT Permit #: F08-0059 ��-(Xj ��`� t�'1�)� C.��'`� Job Address: 595 VAIL VALLEY DR VAIL Status . . . : ISSUED Location.....: MANOR VAIL 285 Applied . . : 08/20/2008 Parcel No...: 210108102018 Issued . . : 09/24/2008 Project No : Expires . .: OWNER ROBERT J. RODGERS TRUST 08/20/2008 ROBERT J. RODGERS TRUSTEE 529 LONGMEADOW CIR ST CHARLES IL 60174 APPLICANT ALL STATE FIRE PROTECTION, I 08/20/2008 Phone: 303-288 -3901 6045 E 76TH #12 COMMERCE CITY CO 80022 License: 370-5 CONTRACTOR ALL STATE FIRE PROTECTION, I 08/20/2008 Phone: 303-288-3901 6045 E 76TH #12 COMMERCE CITY CO 80022 License: 370-5 Uesciption: INTERIOR REMODEL: RELOCATE (2) TWO SPRINKLER HEADS Valuation: $400.00 r�+r+►+r**+a�*a*M*+*�*fi►*►�++►*�*+�*+**+r*rr*r*r*«r***�+*��s*�s***►+ FEE S UMMARY r+**+a�*+�+++*+*+**s***:r***++�r+rr*s**r**+*�++s#s*�**s**++�*• Mechanical---> $0.00 Restuarant Plan Review--> $0.00 Total Calculated Fees---> $367.00 Plan Check---> $350.00 DRB Fee---------------------> $0.00 Additional Fees-----------> $0.00 Investigation-> $o.o o TOTAL FL'ES--------------> $3 6 7.0 0 Total Permit Fee----------> $3 6 7.0 0 W ill Call-----> $0.0 0 Payments-------------------> $3 6 7.0 0 [3ALANCE DUl3---------> $o.o0 •*##+k*+k4*#�F#�F}#*#+k##M*#*tF**M*+k�F*#►**�h�F######*t#�*#*M*#4�F4+k**W*#*#***##+k#M4**#tt*#####rt#M4***+kM#*►#*+k#►t*M1#M+#�t#*#t#*#**#*#Yrt#*4***rt+##i�**#M*m+k Item: 05100 BUILDING DEPARTMENT Item: 05600 FIRE DEPARTMENT � 09/09/2008 JJR Action: AP CONDITION OF APPROVAL Cond: 12 (BLDG. ) : FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPL:IANCE. *.+*+*.*......+.+�.�*,�*+*.+...+..*.+..+++...+.**++*..*++..+++*.*..**..#+�..+.*...*.,�..+M..*+.*,....*.*,+.«**..�.�*�*.�+*......*+*:*..++.*.#.*.+.. DECLARATIONS [ hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE SEVENTY-TWO HOURS [N ADVANCE BY TELEPHONE AT 970-479-2252 FROM 8:00 AM -5 PM. � ����Y�(iv'� UG�`'�1 SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER *****��*****�*+***************+****+****�*******�************************�****����*�*****��* TOWN OF VAIL, COLORADO Statement ****�****+***��+**��*�************************�*************************�*******+��:�******�* Statement Number: R080001738 Amount: $367. 00 09/24/200810:29 AM Payment Method:Credit Crd Init: DDG Notation: credit card - Chris Gibler ------------------------------------------------------------------ ----------- Permit No: F08-0059 Type: SPRINKLER PERMIT Parcel No: 2101-081-0201-8 Site Address: 595 VAIL VALLEY DR VAIL Location: MANOR VAIL 285 Total Fees: $367. 00 This Payment: $367 . 00 Total ALL Pmts: $367. 00 � Balance: $0. 00 *�**�****�****+******+********************************************************************** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ BP 00100003111100 SPRINKLER PERMIT FEES 17. 00 PF 00100003112300 PLAN CHECK FEES 350.00 ----------------------------------------------------------------------------- APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIG D /> - Project#: 1��`b �'�� Buiiding Permit#: 8�g�0036 Sprinkler Permit#:�Q �- QO�� � 970-479-2135(/n�pectlons) TOA'NOFYAII TOWN OF VAIL FIRE SPRINKLER PERMIT APPLICATION Fire Sprinkler shop drawings are required at time of permit submittal and 75 S. Frontage Rd. must include the following. Permit application will not be ac�epted Vail, Colorado 81657 without this information: • A Colorado Registered Engineer's stamp or N.I.C.E.T. Levei II1 (min) stamp. • Equipment cut sheets of materials. • Hydraulic calculations. • A State of Colorado Plan Registration form. • Plans must be submitted by a Registered Fire Protec:tion Contractor. CONTRACTOR INFORMATION Fire Sprinkler Contractor: Town of Vail Reg. No.: Contact and Phone#'s: �pn ? U- a - Z8�3- 390 E-Mail Address: � ��f /L L L / BdTEGT1�, GG.+7 Contractor Signature: ��'c✓4/1. COMPLETE VALUATIONS FOR ALARM PERMIT (Labor& Materials) � ��� _ Fire Sprinkler: $_�U O,D D Contact Ea le Count Assessors Off/ce at 970-328-8640 or visit www.ea .le-count .com for Parcel# Parcel # �Q 0�S 20 l� Job Name: Job Address: S�5 �• (�/��� v��`/��2 „/d 4l / uNiT Z13 Legal Description Lot: Block: Filing: Subdivision: Owners Name: Address: Phone: Engineer: Address: Phone: - Detailed Location of work: (i.e., floor, unit#, bldg.#) �� GOG NO Goo2 Detailed description of work: G � G 1� Z S Work Class: New ( ) Addition( ) Remodel Repair( ) Retro-fit( ) Other( ) Type of Bldg.: Single-family ( ) Two-family( ) Multi-family(� Commercial ( ) Restaurant( ) Other( ) No. of Existing Dwelling Units in this building: No.of Accommodation Units 1n this building: Does a Fire Alarm Exist: Yes,b() No( ) Does a Fire Sprinkler System Exist: Yes j� No ( ) ********,+******************************FOR OFFICE USE ONLY****************** * * * �*�,*��,�, -7 _..� '�` � '��, �� \�- � l��� ���� � � Date:'Recei�e:'dr. -- Approved as S �Perr�nit ee, ' Ac;�e te�l T ��_`� ''` ` ���� "i_ �� %'��� � Approved as roup � v � � y: �� /�.�� ,�,�,��6_ �°C)1�� �F� ��a��. ' �: UVail\datalc ev � � . 07/24/2002 _ _.., �__� `.S f� O 2--. k�•_ l�� 2 � ��. . NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES : 10WNOFVAQ, ' Town of Vail, Community Development,75 South Frontage Road,Vail, Colorado 81657 p.970.479.2139 f.970.479.2452 inspections 970.479.2149 PLUMBING PERMIT Permit #: P08-0074 ��� ����� AMF Project #: PRJ08-0050 Job Address: 595 VAIL VALLEY DR VAIL Status. . . : ISSUED Location.....: MANOR VAIL 285 Applied . . : 07/18/2008 Parcel No...: 210108102018 Issued. . . 07/18/2008 Expires . .: 01/14/2009 OWNER ROBERT J. RODGERS TRUST 07/18/2008 ROBERT J. RODGERS TRUSTEE 529 LONGMEADOW CIR ST CHARLES IL 60174 APPLICANT DESIGN MECHANICAL, INC. 07/18/2008 Phone:(303)449-2092 168 CTC BLVD. STE. D LOUISVILLE CO 80027 License:310-P CONTRACTOR DESIGN MECHANICAL, INC. 07/18/2008 Phone: (303)449-2092 168 CTC BLVD. STE. D LOUISVILLE CO 80027 License: 310-P Desciption: MANOR VAIL 285 INTERIOR REMODEL: REPLACE PLUMBING FIXTURES I Valuation: $6,095.00 .................................«,......««.......».....«.........»..«.......... FEE SUMMARY ..................................,.........................«..................+,.. Plumbing Permit Fee---> $105.00 Will Call------------------> $4.00 Total Calculated FE;es---> Plan Check----------------> $26.25 Use Tax Fee------------> $135.25 $0.00 Additional Fees------------> $0.00 Investigation--------------> $0.00 TOTAL PERMIT FF_ES--> $135.25 Total Calculated Fees--> $135.25 Payments-------------------> $135.25 BALANCE DUE----------a $0.00 ....�..,..««...................«.............«................_...................................,...........................»..............................«.....................«..... APPROVALS Item:05100 BUILDING DEPARTMENT 07/18/2008 JLE Action:AP .....__..,»...........«....................«...,,....,..,...,.............+....«..................................................,....................................._..._............. CONDITION OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. *#Y'Y'rtKYrMMiYiYA*f Irf�#**#kwROfh****f#*#iiYtW+'rt***R***Ir#1rR*#f#�trt'JMfi***tkf 1rf�*#tM*fiPrt4+'ti##*JJi/**i*4it****ft##'MYrifFlRR#�##pt4�It�R�R►Y�***kir##*#�RO'k►►M�kt4Ytfkkk#*#MNrt'kit****���!*#**df�FY�'RYtt***ir*RiRi4Y'ii##;kirf*#�Y DECLARATIONS I hereby acknowledge that I have read this application,filled out in full the information required,completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Godes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0( AM- P � 4 Signature of Owner o Contractor w� ` �� �Il Date � -1��?�( ' .�-�.1�. �����n r� ��( C.�� Print Name plmbpermt1_041908 * . � - , APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGNED �a����� � . " . . Project #: _ Building Permit �:_ �� -�OG� ` �� , Plumbing Permit #: 'E'Q�—OiQ1�- �'�'��"�`� � 970-479-2149 (Inspections) 75 S. Frontage Rd. Vail, Colorado 81657 TOWN OF VAIL PLUMBING PERMIT APPLICATION CON�RACTOR INFORMATION Plumbing Contractor: Town of Vail Reg. No.: Contact Person and Phone #'s: , �: w :�.. - P �, ` Ic�-, o.- - E-Mai Address• � Fax #: _� g Con ' nature: � COMPLETE VALUATION FOR PLUMBING PERMIT (Labor & Materials) PLUMBING: $ �j Q q Gj Contact Ea /e Coun Assessors O�ce at 970-328-8640 0�visit www.ea /e-coun .com for Parce/# Parcel # • i o �o z c�� Job Name: , Job Address: / � 2 8 S' /v(a�a., U.>. . � �9 c;/� � cs ( , Legal Description Lot: Block: Filing: Subdivision: � ner N e: . Ad regs: , s�- � �-� Phone: tr� �- L•-+ !nC-�...► c�✓ �.L. !�O/7 � Engineer: Jd i� ` g�ldre, s: � A J o .o $ Phone' �o y c}��— �/b ��� Detailed description of work: (r � c,-�cst.i <�� . x�--c�� ' {�crmod�c�c ck� �,-, c>�,� fi " �/� ,�°-_ ` Work Class: New ( ) Addition ( ) Alteration (�) Repair( ) Other ( ) Type of Bldg.: Single-family( ) Duplex( ) Multi-family(X) Commercial ( ) Restaurant( ) Other( ) No. of Existing Dweiling Units in this building: ( z 3 No. of Accommodation Units in this building: ***************************�***********FOR OFFICE USE ONLY*********;�********�****************** � /' � r— 'r�3��IR...�.:��IXeiPn.7N��k�a�,� �i'"��xF�}?�f,�. .;��� "1� �i.Pr�W�,dw�;�,^�'�',z�+,'i;�Y �r,�;F,`b `/"�'� / �.'�7 , ;4 �i F,,, ,�✓� (/v ��i� ��a� .i ,fi;£ '� r�:�'u " F:\Cdev\FORMS\PERMITS\Buildina\olumbina nermit 1 t-73-7005.d�r P�na 1 nf i i�n�i�nn� r *#*+k*********#+k#*********##**+##+*##**#**#**�****4**********:k****+k#**##****#*�#*#*#�****##*# TOWN OF VAIL, COLORADO Statement *********************�*********+***�*�*****************************�*�******+*�************+ Statement Number: R080001203 Amount: $135.25 07/18/200812 : 53 PM Payment Method:Credit Crd Init: JLE Notation: DILLEN ------------------------------------------------------------------------------ Permit No: P08-0074 Type: PLUMBING PERMIT Parcel No: 2101-081-0201-8 Site Address: 595 VAIL VALLEY DR VAIL Location: MANOR VAIL 285 Total Fees: $135.25 This Payment: $135.25 Total ALL Pmts: $135.25 Salance: $0.00 *********************�****************+**********�********************************�********* ACCOUNT ITEM LIST: Account Code Description Cur:rent Pmts -------------------- ------------------------------ ------------ PF 00100003112300 PLAN CHECK FEES 26.25 PP 00100003111100 PLUMBING PERMIT FEES 105.00 WC 00100003112800 WILL CALL INSPECTION FEE 4 .00 ----------------------------------------------------------------------------- 12-03-2008 Inspection Request Reporting Page 29 4:19 pm Vail, CO=CitTpf _ Requested Inspect Date: Thursday, December 04, 2008 Inspection Area: sfb Site Address: 595 VAIL VALLEY DR VAIL MANOR VAIL 285 A/P/D Information Activity: 608-0035 Type: A-MF Sub Type: AMF Status: ISSUED Const Type: Occupancy: Use: Insp Area: sfb Owner: ROBERT J. RODGERS TRUST Contractor: G.E. JOHNSON CONSTRUCTION Phone: 719-473-5321 Architect: ZEHREN &ASSOCIATES, INC. Phone: 970-949-0257 Description: MANOR VAIL 285 INTERIOR FINISH-INSTALL ADDITIONAL BATHROOM/FINISHE=S/PLUMBING FIXTURES/LIGHT FIXTURES � � �' Reguested Inspection(s) � � ��j''�� � . ` l� Item: 90 BLDG-Final Requested ime: 0'3:00 PM Requestor: G.E. JOHNSON CONSTRUCTION Phone: 719-473-5321 Comments: gate code 2580` # 8 Assigned To: JMONDRAGON �.J� . � Entered By: DGOLDEN K Action: (/ Time Exp Comment: , , permi s need finals cancel � ���� I_nspection Historv Item: 30 BLDG-Framing `"Approved*" 09/03/08 Ins�p ector: GCD Action: CR CORRECTION REQUIRED Comment: 1.FIRESTOP ALL PENETRATIONS 2.BACK BOX LIGHT FIXTURES 09/09/08 Inspector: GCD Action: AP APPROVED Comment: Item: 50 BLDG-Insulation Item: 60 BLDG-Sheetrock Nail '"Approved'" 09/30/08 Inspector: JGG Action: AP APPROVED Comment: Drywall screws Ok. Ceiling in bathroom needs lid. Item: 90 BLDG-Final 12/02/08 Ins ector: JRM Action: NO NOTIFIED Comment: E,�P permits need finals cancel REPT131 Run Id: 8756 r t 12-03-2008 Inspection Request Reporting Page 82 4:20 pm Vail, Cp - Citv Of Requested Inspect Date: Thursday, December 04, 2008 Inspection Area: JRM Site Address: 595 VAIL VALLEY DR VAIL MANOR VAIL 285 A/P/D Information Activity: P08-0074 Type: B-PLMB Sub Type: AMF Status: ISSUED Const Type: Occupancy: Use: Insp Area: JRM Owner: ROBERT J. RODGERS TRUST Contractor: DESIGN MECHANICAL, INC. Phone: (303)449-2092 Description: MANOR VAIL 285 INTERIOR REMODEL: REPLACE PLUMBING FIXTURES Requested Inspection(s) f 2"-6�7`'� � .���L—� Item: 290 PLMB-Final Requested Time: 04:00 PM � Reques tor: D E S I G N M E C H A N I C A L, I N C. P h o n e: (3 0 3)4 4 9-2 0 9 2 Comments: gate code 2580' #28 Assigned To: JMONDRAGON • � l� Entered By: DG�OLDEN K Action: Time Exp: �..� Inspection History Item: 260 PLMB-Misc. "Approved"" 07/24/08 Inspector: shahn Action: PA PARTIAL APPROVAL Comment: UNDERSLAB DWV OK. 08/08/08 Ins pe�ctor: GCD Action: AP APPROVED Comment: NEW BATHROOM 5 si TEST. WATER STREET P�ESSURE TEST Item: 290 PLMB-Final REPT131 Run Id: 8756 i i