HomeMy WebLinkAboutE08-0285NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
.~
1DWNOFVAQ. '
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139 f. 970.479.2452 inspections 970.479.2149
ELECTRICAL PERMIT Permit #: E08-0285
ACOM
Job Address: 710 W LIONSHEAD CR VAIL
Location.....: VAIL SPA CONDOS
Parcel No...: 210106317001
OWNER LOFTON, KEVIN E. 11/25/2008
47 TAMARADE DR
LITTLETON
CO 80127
APPLICANT LIESL LIGHTING AND ELECTRICA 11/25/2008 Phone: (303) 573-0074
2601 WALNUT STREET, SUITE 100
DENVER
COLORADO 80205
License: 363-E
CONTRACTOR LIESL LIGHTING AND ELECTRICA 11/25/2008
2601 WALNUT STREET, SUITE 100
DENVER
COLORADO 80205
License: 363-E
Phone: (303) 573-0074
Desciption: COMMON ELEMENT: INSTALL ONE 20 AMP CIRCUIT FOR POOL
EQUIPMENT ROOM EXHAUST
Valuation: $2,000.00 Square feet: 0
Status ...
Applied ..
Issued . . .
Expires . .:
PRJ08-0647
ISSUED
11 /25/2008
12/05/2008
06/0(t3/2009
O"~
~\k~
~ ~~
lU
FEE SUMMARY
Electrical Permit Fee---------> $57.50 Total Calculated Fees--> $61.50
Investigation Fee--------------> $0.00 Additional Fees----------> $0.00
Will Call Fee--------------------> $4.00
Use Tax Fee-------------------> $0.00 TOTAL PERMIT FEE---> $61.50
Total Calculated Fees-------> $61.50 Payments-----------------> $61.50
BALANCE DUE----------> $0.00
APPROVALS
Item: 06000 ELECTRICAL DEPARTMENT
12/04/2008 shahn Action: AP
CONDITIONS OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Entry: 12/04/2008 By: shahn Action: AP PER APPROVED REVISED PLANS.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that
all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state
laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and
Residential Codes and other ordinances of the Town applicable thereto.
REQUEST FO TIO SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR
OFFICE FR M 8 4 P
~ C ~g
Signatur f Ow a or Contractor D to
Project #:
elec_prm_041908
TOWNOFVNL ,
I1
lag~~XN~
7~o a-~~ ~jti72Z
Development Review Coordinator
75 South Frontage Road
Vail, CO 81657
Phone: 970-479-2128
Fax: 970-479-2172
Inspections: 970-479-2149
TOWN OF VAIL ELECTRICAL PERMIT APPLICATION
Project Address
Contractor Information
Company:1,(1=`~l `JC~VC,r
-~ i~~ // ~ n
Company Addreshs: J~l~C~ ': ~l~+I`\/
City: ~ 1'~. State: Zip:
Contact Name:
Contact Ph: Cell: ~yLS ~~,C ~~ -~'~ j ~~i
Property Information
Parcel #: 2.1[~ Il'~
~Ov'Ti o+1
Legal Descripti~o/n: Lot #Id ~t 1 1 Blk # 2~ ,
Subdivision: 1~~,~ 1..~1Ot~~i~~
Job Name:
.~
Owner Name: i ~ ~"
Mailing Address:
(For Parcel # Contact Eagle County assessors Office at 970-328-8640 or visit
www.eaglecounty. us/patie)
Architect~Ol,~ Desig~n-er~O, Engineer ( )
Name: c~~.) 1~ 1~ \ 9~/fib
Phone: ~l~f+ -~i~~ - (o I
Fax: •~
', E-Mail L~~ nQL~~hl~. l !.~`~ . C1:~(Y 1
~~n 1t= I Y1L(~i~~o[v I I IOI~~ (y IS 't~t~.
h(~o . ~iJ~ i
~~5
Project #: I ~ ~~ "~ ~ -1
Building Permit #:
Electrical Permit #: ~06~6' ~iU.7
Detailed Description of Work: ~ b~-' (~~
2~ An1~ cis ~~ ~~l_ ~~~xmr~"~i
~m C~cl~l'~~~- -'SArt
fuse aaaiuonai sneer it necessary
COMPLETE SO. FOOTAGE FOR AREA OF WORK AND
VALUATION OF WORK (Labor & Material)
Amount of SQ Ft
Electrical $ ~~ )(1~-gym
Work Class:
New ()Addition ( )Remodel ( )Repair ( )Other ( )
Building Type:
Single-Family ( ) Two-Family ( ) Multi-Family ( )
Commercial ~) Townhome ( ) Other ( )
Date Received:
pqV 25 2008
TOWN OF VAIL
TOWN OF VAIL, COLORADO Statement
Statement Number: 8080002315 Amount: $61.50 12/05/200811:34 AM
Payment Method: Check Init: JLE
Notation: 8609 LIESL
LIGHTING
---------------------------------------------------------------
Permit No: E08-0285 Type: ELECTRICAL PERMIT --------------
Parcel No: 2101-063-1700-1
Site Address: 710 W LIONSHEAD CR VAIL
Location: VAIL SPA CONDOS
Total Fees: $61.50
This Payment: $61.50 Total ALL Pmts: $61.50
Balance: $0.00
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
---
----------------- ------------------------------ -
EP 00100003111100 ELECTRICAL PERMIT FEES -----------
57.50
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
Development Review Coordinator
75 South FrontageRoad
- Vail, CO 81657
Phone: 970-479-2128
~,: Fax: 970-479-2452
~' - ~+ ,~' ..:_ inspections: 970-479-2149
~/~ ,{p __
T~~tT~~ 11f ~Iltl.~ ~ - W
Transmittal Form
Revision Submittals:
1. "Field Set" of approved plans MUST accompany revisions
2. No further inspections will be performed until the revisions are approved & the permit is re-issued.
3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance.
Revisions
Permit #(s) information applies to: Attention: 1~ Response to Correction Letter
_attached copy of correction letter
Off, -02~i ~fA~ ~'~ ()Deferred Submittal
()Other
Project Address:
YWl.~pq. C~pO -~ IOV,! C.i1~t~- lI~-IV
`' Contact Information
Company: I~-tU ~'rnOS (~
`, Company Ph: ~ ~1~ Fax:
Contact Name: l~5 C~t~'F'
Contact Ph: Cell:
lV E-Mail: Gl~fL1S t~.~4ca0 tiNDt01. ~M.
Town of Vail Contractor Registration No:
'X
Signature (required)
Revised ADDITIONAL Valuations (Labor 8~ Materials)
(DO NOT include original valuation)
Building $
Plumbing $
Electrical $
Mechanical $
Fire Sprinkler/Alarm $
Total $
(Use additional sheet if necessary)
Date Received:
DEC 0 3 2008
TOWN OF VAIL
0
^STUDIOS, INC.
--~
~:
~-
~ --
=~---~-
12103108
Town of Vail
Attention: Stan Hahn
Department of Community Development
Building Safety and Inspection Services
75 South Frontage Road
Vail, CO 81657
I~~~ ~
DEC o 3 ?pp9 D
T- ~A~L I
FILE COPY
Architecture i Design i Strategy
Re: Permit E08-0285 -PLAN REVIEW COMMENTS 11 /28/08
In response to the Plan Comments noted above we are submitting a revised letter set, document set and panel schedule referencing
Panel AH within the Vail Spa Building.
Panel AH has been designated as the panel from which we will pull the power for the new roof mounted fan assembly based on field
inspections and multiple discussions with the Owner and Engineer regarding a number of issues surrounding this work.
The attached stamped panel schedule will provide documentation the needed capacity is available from the designated panel and can
be done in accordance with applicable NEC code requirements.
Please feel free to call me if you have questions.
L__.X:.~--- ~ ~~--.
Christopher J. een, A A
Encl.: letter - Beaudin-Gonze - 2 pages (Revised 12.02.08)
Panel Schedule - El -1 page (12.03.08)
Upper Garage Plan -Revised for Panel AH -1 page (Revised 12.03.08)
office i970~748i9414
fax 1970174819476
www.agostudios.com
~O U ~ Q ~~ ~ 2909 June (reek trail #1
PO Box 18457
Avon, Colorado 81620
~~ ~~ ~
D L~CC~~MI~n
II
DEC 0 3 2008 ~
TOWN OF VAIi. __
Department of Community Deve%pment
Building safety and Inspection Services
75 South Frontage Road
fail, Co%rado 81657
970-479-2138
FAX 970-479-2452
www. vailgov.com
BUILDING SAFETY AND INSPECTION SERVICES PLAN REVIEW COMMENTS:
TO: Liesl Lighting
Victor Sperling
Architect
proj#
FAXJEmail #: vic@lielslighting.com
NUMBER OF PAGES:
FROM:
DATE:
BUILDING PERMIT #:
OWNERS NAME:
OCCUPANCY GROUP:
TYPE OF CONSTRUCTION:
NUMBER OF STORIES:
BUILDING AREA:
Stan Hahn
11/28/08
E08-0285
Vail Spa Condo Assoc
The documents submitted for this project have been reviewed for compliance with the 2003
International Building Code, 2003 International Residential Code, 2003 International Mechanical
Code, 2003 International Fuel Gas Code, 2003 International Plumbing Code, 2003 International
Energy Conservation Code and 2008 National Electrical Code as modified and adopted by the Town of
Vail.
The fo/%wing comments wi//need to be addressed prior trv issuance of a bui/ding permit:
For processing:
• Please submit four complete sets of revised construction documents containing the reauested
information with all plan revision items clouded or otherwise identified. Partial Ulan sets or
loose Ulan sheets are not accepted.
• Please respond in writing to each comment with a response letter stamped and signed by the
architect and/or engineer Indicate which plan sheet detail specification or calculation shows
the requested information Please resubmit complete plan revisions, response letter and
a Town of Vail transmittal form to the Town of Vail Community Development Office.
• Please be sure to include on the resubmittal the architect's stamp and or engineer's stamp,
signature registration number and date on all sheets of the plans.
Electrical Comments
Provide Panel schedule and Load calculation for PNL DH.
Please refer to the cover sheet for information on resubmitting plans. In order to avoid delays in issuance of
a permit, please check all requested information is included with the resubmitted plans. Please submit
revised plans as a complete set. Partial plan resubmittals will not be reviewed.
F ~ \cdev\CH RIS\PERMIT.COMMENTS\ 1 STAN DARDCOMM ENT5B060000(2003 I-CODES)\commentlettercover. DOC
~~~-oz~s
D F,.~C.E.Wt BE12 3~ z°~
Mr. Robert Grant
East West Resorts
710 W. Lionshead Circle
Vail, Colorado 81657
RE:
~.
consulting engineers, inc.
D ~ C~ [~ D ,~% (~
DEC d 3 2008
Vail Spa Condominiums, Pool Room Ventilation
Project No. 8579.00
Dear Robert:
As a follow-up to our recommendation letter dated June 18, 2008 regarding the Vail Spa
Condominium pool room ventilation, we have further outlined the exhaust ductwork and
electrical power supply.
New ductwork shall be installed from the current termination within the gazage to the location of
the new exhaust fan, located on the low roof between the two towers. The exhaust tunnel from
the spa equipment room to the lower garage shall be sealed to the new ductwork. The contractor
should not disturb any of the ductwork or piping within the exhaust tunnel.
Upon leaving the tunnel, the ductwork shall turn up through a new penetration in the ceiling of
the garage and continue up the wall of the upper garage. Once the duct reaches the structure of
the upper gazage (above the ceiling) the duct should be routed horizontally to the location of the
exhaust fan then penetrate the roof and tie into the roof curb supporting the fan itself. This
routing should be field coordinated by the installing contractor, the size of the ductwork may
change but the internal free area shall remain constant. Refer to attached sketches for additional
information.
Currently there is not a fire damper installed within this exhaust system. Afire damper shall be
installed where the ductwork exits the exhaust tunnel and enters the garage; the delineation point
between the old system and the new ductwork. The fire damper shall carry the same rating as
the walls of the spa equipment room and be sized to fit the field-coordinated ductwork.
Between the drywall ceiling of the upper garage and the roof penetration, the ductwork shall be
wrapped with 3M Fire Wrap, or equivalent. This wrapped section shall be sealed per the
manufacturer's specifications to the drywall ceiling and fire caulked at the roof penetration.
p. 970.949.6106
p. 303.276.3820
p. 530.550.7334
p. 970.221.5691
VAIL
DENVER
LAKE TAHOE
FORT COLLINS
www.bece.com
East West Resorts
Vail Spa Condominiums
November 21, 2008
Page - 2
The new spa exhaust fan should be a Cook 165 ACRU-A, or equivalent, and be located on the
roof near the existing garage exhaust fan. Fan should be all aluminum and have a Phenolic
Epoxy w/[JV coating. Fan data should be as follows: 1,500 CFM and 0.5" ESP at 8,150 feet
above sea level (to be confirmed based on actual duct routing and sizing). Motor should be
totally enclosed fan cooled (TEFC) type. The new fan shall be interlocked with the exhaust fan
within the existing pool room ventilation system. Attached is a sample cut sheet of the Cook 165
ACRU-A for reference. ~~„~
IZ 3'4g
Electrical power for the new exhaust fan shall come from the main elec 'cal room for the
building. A circuit shall be added to the panel distribution labeled ` 'and electrical
power to the fan shall be routed from that location. The circuit breaker shall be 20 Ampere,
single pole. A control wire shall be routed along the ductwork from the new exhaust fan to the
spa equipment room to interlock the new fan and the existing relief fan.
Conduit shall be routed horizontally to the wall of the electrical room toward the doors. Upon
penetrating the wall of the electrical room, the conduit shall be routed through the roof neaz the
sprinkler stand pipe. The conduit shall be routed parallel to the sprinkler pipe, utilizing the same
uni-strut supports, to the location of the new exhaust fan. A single pole, 20 Ampere rated
disconnect switch shall be installed at this location to serve the fan.
Upon completion, balance the complete system..
S:~BGProjecta~8579.00 Ya0 Day S~\CorrcsPcndence~BGCE1857900M1A2JD.doc
Engineer
r~
W
a
Z
m
m
t
~
~ 0
°
~
W
a ~
m
~
~ ~ ~
°c
~
® O0
N
Q 7 ~ 0
U
~
ZVd
Q~ w
O
OWO v
Z2J
p
0 ~
Q
Z
0~ Z
a
fA j a
J
Q O
~ ~
ti
a r
0
~
~~
mu~c4irn
E
e
Hm°~'
U
cyf C
>~OIL
W v
~ Z z cn
Q Q
W
~
W Z
M
W
W O
V
s
0
U
~_
z
~
U ~ ~ ~`
~
'o `O w
a
N Q
U ~ y .~ o
C A
~ o
~ p N s
~~'
p
~
~ ~ ~ ~ a~i ~a o °~ m
a~33c~ ~
> ~ ~ o
a~
?~; ,° 4f: z > cC~wr=> 003 J
efi ~~ ;s N
,~ ~ ~ f,` i- ~t III r 1t ~ s-. ~A
_ 6 r ~~~ -,
~ ~ ~ 9 ~ I ~. ~ F t'. t~ t~ i~ k 2 - ~~~a
~ ~ I wg
. ~- ' i .,
~' ~.~
~ E: !'~ ;
3~~~,
Ij i y
s
s_ _
.; i ~ ,.
~ -" r ~ Y1 -,__ - {
~~ 1. :_
~.
_ : ~ ,. .
~ ~~~ '~ b
_-- -
~ g ~ ~ ~ G ) ~ i' ~ "V
C~~ ~ ~ I
{1~ ~ ~ N N ~ ~C ~I
°~M .~ 4~.
9[ ~ ~~~ ~ U ° ~ ~ .~ ~ ,
~ A Ca ~ ~.
~~ fj I iJ... it ~ V rd F " i'4 y ~I. ~ F ~~
(Y (~ ~ ~ U K ~ ai
b T a) ~ ,~}
\_ ~i ~. 3 w ,p t .rJ.
'+ u.. ~i 1'- _ °~'• O b ~ p~„ ~ f ~ -; ~. r ..mss ~'~
~1 yy ,.
~ ~ ,~ ~ ~ ~ q 3 ~, ~ ,«-.weE~i' ~ ;~
Qw ~+5~. I I .. o w' a p I '~v ~+y
'~= I z l` ~xt I
.~ -. ._ - -- ~a ~ a~-- ~ - - ~ - - '-°~~W-fir ~ ~ 4~ ~: ~i,
t - .. ~ - .-._ ~ ~ t
~,
~:
dt z e ~ ~1 i - ~ ~ /'
z =- 5 _
}.-_ i_- - - _.i _._ r
~ _,`„ ~ ~ ~ ,r. ~ ~ r
=~ a4 - ~' ,va. a -
BEAUDIN
GANZE
consulting engineers, inc.
November 21, 2008
Mr. Robert Grant
East West Resorts
710 W. Lionshead Circle
Vail, Colorado 81657
RE:
Vail Spa Condominiums, Pool Room Ventilation
Project No. 8579.00
li
y~ r ~
Dear Robert:
_ As a follow-up to our recommendation letter dated June 18, 2008 regarding the Vail Spa
Condominium pool room ventilation, we have further outlined the exhaust ductwork and
electrical power supply.
New ductwork shall be installed from the current termination within the garage to the location of
the new exhaust fan, located on the low roof between the two towexs. The exhaust tunnel from
the spa equipment room to the Lower garage shall be sealed to the new ductwork. The contractor
should not disturb any of the ductwork or piping within the exhaust tunnel.
Upon leaving the tunnel, the ductwork shall turn up through a new penetration in the ceiling of
the garage and continue up the wall of the upper garage. Once the duct reaches the structure of
the upper garage (above the ceiling) the duct should be routed horizontally to the location of the
exhaust fan then penetrate the roof and tie into the roof curb supporting the fan itself. This
routing should be field coordinated by the installing contractor, the size of the ductwork may
change but the internal free area shall remain constant. Refer to attached sketches for additional
information.
Currently there is not a fire damper installed within this exhaust system. Afire damper shall be
installed where the ductwork exits the exhaust tunnel and enters the garage; the delineation point
between the old system and the new ductwork. The fire damper shall carry the same rating as
the walls of the spa equipment room and be sized to fit the field-coordinated ductwork.
Between the drywall ceiling of the upper garage and the roof penetration, the ductwork shall be
wrapped with 3M Fire Wrap, or equivalent. This wrapped section shall be sealed per the
manufacturer's specifications to the drywall ceiling and fire caulked at the roof penetration.
110 E. Beaver Creek Blvd., X202, P.O. Box 9650. Avon, CO 81620 • p. 970.949.6108 • f. 970.949.6159 VAIL
1626 Cole Blvd., Suite 300, Building 7, Lakewood, CO 80401 • p. 303.278.3820 • f. 303.278.3843 DENVER
11430 Deerfield Drive, X65, Truckee, CA 96161 • p. 530.550.7334 • f. 530.550.7336 LAKE TAHOE
251 Linden 51., 11200, Fort Collins, CO 80524 • p. 970.221.5891 • f. 970.221.5697 FORT COLLINS
www.bece.COm
East West Resorts
Vail Spa Condominiums
November 21, 2008
Page - 2
The new spa exhaust fan should be a Cook 165 ACRU-A, or equivalent, and be located on the
roof near the existing garage exhaust fan. Fan should be all aluminum and have a Phenolic
Epoxy w/LTV coating. Fan data should be as follows: 1,500 CFM and 0.5" ESP at 8,150 feet
above sea level (to be confirmed based on actual duct routing and sizing). Motor should be
totally enclosed fan cooled (TEFC) type. The new fan shall be interlocked with the exhaust fan
within the existing poolroom ventilation system. Attached is a sample cut sheet of the Cook 165
ACRU-A for reference.
Electrical power for the new exhaust fan shall come from the main electrical room for the
building. A circuit shall be added to the panel distribution labeled `PNL DH' and electrical
power to the fan shall be routed from that location. The circuit breaker shall be 20 Ampere,
single pole. A control wire shall be routed along the ductwork from the new exhaust fan to the
spa equipment room to interlock the new fan and the existing relief fan.
Conduit shall be routed horizontally to the wall of the electrical room toward the doors. Upon
penetrating the wall of the electrical room, the conduit shall be routed through the roof near the
sprinkler stand pipe. The conduit shall be routed parallel to the sprinkler pipe, utilizing the same
uni-strut supports, to the location of the new exhaust fan. A single pole, 20 Ampere rated
disconnect switch shall be installed at this location to serve the fan.
Upon completion, balance the complete system.
P. Larson, P.E.
/~
S:~BGpmjects18S79.00 Vaa Day SpaVCortopo~dnKS1BGCb'1857900MIA27D.doe
Engineer
~~
~e; . yn
;~
s~ ~ s~:s
= ~ ~ ~
~
,~
.4.; ~ Y':~z
`o' ~ Si oo
O O
A U ~n
y, `~ ~ ~ W
p,
z W
9' ,/ w, ti ,p a y ~ ~ a C 0.i ~ ~ .
..ir _r ~ j
V ~•• ~ r~ „~~ U ~ ~
f
~
~ ~ ~ ~
O ~ ~ ~ ~
~y+
~
V
4l~, ~~ :
a~ ~~
~ . 'Z ~ W
W C~ ~ W ~
i ~ w
a SM"
f~ 11
> F,f1
~ ~ ~..
~~o ~ ~ . o .
~ :1 m ~ /
•Y ~ 4 _ -~. ti '~. "R'4 '/ it Y(`i ~ t
BEAUDEN /
GANZE j
consulting engineers, inc.
Vaif: (970) 949-G10S
Lake Tahoe: (530) 550-7334
Denver: (303) 278-3520
Fort Collins: (970) 221-569t
BY ~~1--, DATE E ~ Nab U$
SUBJEC7 V ~ ~ ~ ~ oa ~au ~ U e~•.~
SHEET NO. l OF
2
JoB No. S S 7 4. d o
~ ~f ~ I I~j i I ~ ~ ~ I ~ / I
~ ~ i
~ I
~e ~~a
I ~ / I I N `CQ L 'C b LE O
I I '
o~ ,
~cE
v
c
~
I G ~/4 ~ G ! ~ , I MA~~T A~i J F RL ~. A2 EA
I w ~~ ; ~ I !T I
~ ~ I I
I t o ~T o~ Sx l
i
~
I
i
nIS'C
x I
~,
'v'fi~ '
~
oui
r~ I , '~
,~
. N
i
-
Nyd.
E .!
2 be l ;
~(~ 1
TN
t.G
1~
N1
~ L
I ~ ~ Q ~ P P~ p
~ ~; _
~ ~. ~ .,
I I I I
Ari fco I ~ _ ~ I ~ I E L r+ ~ c ~o w ~- ,
-
I
~ I ~ i -B , 9 ~2 -`
i ' ~ ~ ' ~ ~ I ~
I x ~ Ex rt r<
i
~
r i ~
' -~ - (
I
f F Ct '' I
i l
i
t 'r r , Y~ l l l ~~ ! t
~
I
~
w
0.
I i
A
A
~
~
L c
~fl
~
~~~~ r
~,.
ani+m
nrr, ~
o
~
y~'• o
:
I ~ ~ `
I I . ~ I i I I 8 1 * oc
I I (
I i ~ _.-~~~ ~
BEAUD[N/
GANZE j
consulting engineers, inc.
Vail: (97D) 949-6108
lake Tahae:(530)550-7334
Den.~er: (303) 275-3820
Forr Collins: (970) 221-5691
BY S _I ~-- DATE E S /1J o f C~ S
SUBJECT ~u' 1 SC~/k P~,,~. ~I~.NT.
SHEET NO. ~ OF
JOB NO. S57~T. 00
°i i~ li ' yi d i r// ~~, ~ ~% i, ~ p ~ ~ I
I
~
i I , I
i
~
i ~~ T
' ~ I t c.C ~ ~ vc. R
I ?
ti~
~~
Ft
~
( I i ~
I
~
x+ I
I
I I
I N I
~ I I
I-- ~ .: _„
13p x l0 I ~ i ~ -: G ? L
x IA ~ ~ o P
~~ ~ u ~
~ I y I I
j ~ ~ r-- -
I ~ ~ ~ ~
i
i ~ t
~ tl {
~ P ~ ~ I ~ o a. F L
f ro fl I I (
I
i l
f ~ i 1 I
i
~ ~~ ~i ~ ~ r < ~ ~ ~ ~j , j .t ~ ~ ~~ I
~ ~
i
+
~
~ ..a a
~ Z ~ La v
;
~ ~~
.`O
~ ~
• ~
.~ ~ ~,
I ~ •
I - o.
• ; ~
~ ,
_
~ ~ ~4 ~, l ~ ~ C ~ ~
' ~
.
•~. t ~~
.• ~~
~.
~
~
i
~
~ /! 1j N{-I-11 ~~~
COOK
AC R U-A
Aluminum Construction
Upblast Centrifugal
Exhaust Ventilator
Roof Mounted/Belt Drive
•:~'« MARK: EF-1
'°"~° PROJECT: VAIL SPA
C ~L us DATE: 11-21-2008
STANDARD CONSTRUCTION FEATURES:
All aluminum housing -Backward inclined all aluminum wheel -
Two piece top cap with stainless steel quick release latches -
One piece bottom spinning -Welded curb cap corners - Birdscreen -
Vibration isolators -Lifting Lugs -Permanently lubricated
ball bearing motors -Static resistant belts -Adjustable pitch
drives through 5 hp motor -Corrosion resistant fasteners -
Regreasable bearings in a cast iron pillow block housing, rated
at 200,000 hours average life - Atl fans factory adjusted to t
specified fan RPM -Transit tested packaging. Standard motors ~- T sq. --..-.~
ship factory installed.
Dimensions (inches)
Pprfermancp
Qty Catalog
Number Flow
(CFM) SP
(inwc) Fan
RPM Bhp
(HP)
1 165R3B 1500 .500 934 .200
Altitude {ft): 8150 Temperature (f=}: 70
Motor Intorrnation
HP RPM Volts/Ph/Hz Enclosure Mounted
1 /4 1725 115/1 /60 TEFC Yes
Sound I~at'a R C}CtAVP_ RAnd~ dA f9n -12 WAttxl
1 2 3 4 5 6 7 8 LwA dBA Sones
80 77 70 63 61 57 53 50 68 56 9.0
Accessories:
STD DISCONNECT PREWIRED
BD-18 DAMPER
ROOF CURB RGA 22-9.5 H WlTRAY
PHENOLIC EPOXY W/W
Fan Curve Legend
CFM vs SP
CFM vs HP
System Curve - - - - -
Point of Operation
A 20-15/16
B 34-11 /16
C 30-3/4
G 2
T Sq. 24
Roof O en. Sq.* 19-1/2
Unit Wt Ibs ~** 122
• Roof openhg size for curbs aupplled by Cook onty.
'••InGudes ian, motor & aasssorles.
Fan Curve
0.75
0.60
0.45
SP
(inwc)
0.30
0.15
0
i
~ P~
~ (H
t
i
~ '
250
200
f50
ewer
P)
100
050
0.00
600 1200 1800 2400 3000
Flow {CFM}
~s.oatiy.o
12-09-2008 Inspection Request Reporting Page 17
4:11 pm Vail_ C_T O -City ~f _
Requested Inspect Date: Wednesday, December 10, 2008
Ins ection Area: SH
Site Address: 710 W LIONSHEAD CR VAIL
VAIL SPA CONDOS
A/P/D Information
Activity: E08-0285 Type: B-ELEC Sub Type: ACOM Status: ISSUED
Const Type: Occupancy: Use: Insp Area: SH
Owner: LOFTON, KEVIN E.
Contractor: LIESL LIGHTING AND ELECTRICAL Phone: (303) 573-0074
Description: COMMON ELEMENT: INSTALL ONE 20 AMP CIRCUIT FOR POOL EQUIPMENT ROOM EXHAUST
Requested Inspe
Item:
Requestor:
Comments:
Assigned To:
Action:
ction s /~ ~ ,~`~
190 ELEC-Final /~
LIESL LIGHTING AND EL CTRICAL
will call Jim (303) 557-8565
SHAHN
Time Exp: _
Requested Time: 09:30 AM
Phone: (303) 557-8565
Entered By: DGOLDEN K
~~~`~
Inspection History
Item: 110 ELEC-Service
Item: 120 ELEC-Rough
Item: 130 ELEC-Conduit
Item: 140 ELEC-Misc.
Item: 190 ELEC-Final
REPT131
Run Id: 8773