Loading...
HomeMy WebLinkAboutprint_page_07-29-2016_579bdcf5a2a0c-0.pdfPermits Management (B16-0106) Fee Charges (10) Child Cases (1) Contacts (4) Contractors (1) Properties (1) Inspections (10) Documents (11) Tagged Cases (0) Activities (121) Add Tag PERMITS MANAGEMENT Create New Inspection: Project: Fuentes Bathroom 2016 Select options CreateGo to Main Inspection Grid 1 + 1 + 1 + 1 + 1 + 1 + 1 + Type: Construction Multi-Family Start Date: 04/14/2016 Status: Issued Parent Case Collapse All Expand All Electrical: #E16-0051 Ulf & Associates LLC Date Exp: 04/30/2017 Status: Active Contractor #: CT-0051 State License #: Contractor Type: General [210108256041] 27 100 E MEADOW DR 27 Snow Avalanche: No Land use: Village Master Plan Zone District Designation: Public Accommodation TOV Subdivision: VAIL VILLAGE FILING 1 Legal Subdivision: VAIL VILLAGE PLAZA CONDOS Rock Fall: No Lot Number: O TOV Block: 5D 100 year plain - Flood Hazard Zone: Debris Flow: No Lot Area: There are no Tagged Cases at this time. Inspections Dry Wall Dry Wall ((PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon Batt Insulation (Batt Insulation (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Rough Plumbing (Rough Plumbing (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon Rough Mechanical (Rough Mechanical (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Gas Piping (Gas Piping (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Minor Framing (Minor Framing (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Checklist Edit Info Plumbing Final (Plumbing Final (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon Info Florencio (JR) Mondragon at 07/08/2016 10:01:37 am Approved Status Completed Estimated Duration 1 Hour(s) Permit Number B16-0106 Parcel Requested Date Inspection Date 07/08/2016 Inspection Time Morning Date Completed 07/08/2016 Schedule Notes Result Pass 1 + 1 + Florencio (JR) Mondragon at 07/08/2016 10:01:41 am Inspector Signature Florencio (JR) Mondragon at 07/08/2016 10:01:41 am Applicant Signature Result comments Send NotificationInsert Re-Inspection Checklist Edit Info Planning Final (Planning Final (PassPass))Inspector: Inspector: Chris NeubeckerChris Neubecker Info Status Completed Estimated Duration 1 Hour(s) Permit Number B16-0106 Parcel Requested Date Inspection Date 07/08/2016 Inspection Time Morning Date Completed 07/13/2016 Schedule Notes Result Pass Result comments Send NotificationInsert Re-Inspection Checklist Edit Info Building Final (Building Final (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon Info Status Completed Estimated Duration 1 Hour(s) Permit Number B16-0106 Parcel Requested Date Inspection Date 07/08/2016 Inspection Time Morning Date Completed 07/08/2016 Schedule Notes 1 + Florencio (JR) Mondragon at 07/08/2016 10:01:53 am Approved Florencio (JR) Mondragon at 07/08/2016 10:01:57 am Inspector Signature Florencio (JR) Mondragon at 07/08/2016 10:01:57 am Applicant Signature Result Pass Result comments Send NotificationInsert Re-Inspection Mechanical Final (Mechanical Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled