Loading...
HomeMy WebLinkAboutprint_page_06-09-2016_5759de00239b6-0.pdfPERMITS MANAGEMENT Create New Inspection: Project: Sheffield Foundation Stabilzation 2016 Select options Create Go to Main Inspection Grid 1 + 1 + 1 + Inspections Checklist Edit Info Schedule Prerequisites Schedule Inspection Special Inspection Final Special Inspection Final ((UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 05/03/2016 Estimated Duration 1 Hour(s) Permit Number B16-0128 Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Special Inspection Special Inspection ((UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 05/03/2016 Estimated Duration 1 Hour(s) Permit Number B16-0128 Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Building Final (Building Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date Estimated Duration 1 Hour(s) Permit Number B16-0128 Parcel