Loading...
HomeMy WebLinkAboutEngineers Framing letter_1.pdf tic Ali •••• S "••• 141 'Patt FRAMING NOTES 03 CI �t X405/22/2016;' Ell i� tt O,�t�ti. •�v 1/4"=11-0" �O,gSS`••"�G\�_ �,,1�OMAlE� NQTES: 1. WALL FRAMING PREVIOUSLY LOCATED AND POSSIBLY SUPPORTING THE MEMBER ABOVE SHALL BE RETURNED TO PRE-WATER DAMAGE LOCATION AND CONFIGURATION.IT IS THE CONTRACTORS RESPONSIBILITY TO RETURN THIS FRAMING TO EXACTLY THE WAY IT WAS BEFORE DEMO. 2. MINIMUM SUPPORT COLUMN SHALL BE(3)-3X6 AT CORNER INFILL AND BE OF DOUGLAS-FIR No.2 GRADE OR BETTER. 3. ALL EXTERIOR WALLS SHALL BE CONSTRUCTED OF 2x6 DOUGLAS-FIR STUD GRADE STUDS OR BETTER SPACED AT 16"o.c.,TYPICAL, UNLESS NOTED OTHERWISE. ALL WALLS SHALL HAVE CONTINUOUS STUDS FROM FLOOR TO FLOOR AND FLOOR TO ROOF. 4. TOP AND BOTTOM PLATES SHALL BE OF DOUGLAS FIR-LARCH OR HEM-FIR#2 OR BETTER. PLATES IN DIRECT CONTACT WITH CONCRETE OR MASONRY SHALL BE OF PRESSURE TREATED HEM-FIR#2.PRESERVATIVE TREATED LUMBER REQUIRES ALL CONNECTIONS AND NAILING BE GALVANIZED PER CODE. 5. TIE NEW TOP PLATE SECTIONS TO OLD WITH SIMPSON STA2122 STRAPS AND 10D X 1 1/2"NAILING,TYP. 6. WALL SHEATHING SHALL BE 7/16" PLYWOOD OR OSB SHEATHING RATED 24/16 EXPOSURE 1 OR BETTER NAILED WITH 10d GUN NAILS(0.131"x3")AT 4"o.c. MIN AROUND ALL OPENINGS,AND AT PANEL EDGES. BLOCK ALL PANEL EDGES. 7. FOR ALL SOLID OR BUILT-UP COLUMNS BEARING THROUGH FLOOR JOIST SPACES,PROVIDE BLOCKING IN JOIST SPACE WITH CROSS SECTIONAL AREA TO MATCH COLUMN ABOVE. TITLE FRAMING NOTES PROJECTJOBPOTATO PATCH CONDO /oBNo. 16005 SHEET REMEDIATION - UNITS I & 3 T NO. A 5 one design o TOWN OF VAIL, CO engineering consulting N SCALE 1.25 .75 1.25 S 1.1 333n ISR 9A 3E3� 0 05/22/2016 ISSUED FOR CONSTRUCUON MSV MSV 3/4"=1'-0" c"w.nm,mei®x m NO. DATE DESCRIPTION BY CHK I a1.016.150URCECOM STRUCTURAL ENGINEERING-CIVIL ENGINEERING-ARCHITECTURAL DRAFTING-3D MODELING