HomeMy WebLinkAboutprint_page_06-02-2016_575061e39335e-0.pdfPERMITS MANAGEMENT
Other
see paper plans in G-1 with B16-0166
Create New Inspection:
Project: Lifthouse Boiler Replacement 2016
Select options Create Go to Main Inspection Grid
1 +
1 +
Inspections
Checklist Edit Info Schedule Inspection
Electrical Final (Electrical Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled
Info
Status Unscheduled
Requested Date
Estimated Duration 1 Hour(s)
Permit Number E16-0097
Parcel
Checklist Edit Info Schedule Inspection
Rough Electrical (Rough Electrical (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled
Info
Status Unscheduled
Requested Date
Estimated Duration 1 Hour(s)
Permit Number E16-0097
Parcel