Loading...
HomeMy WebLinkAboutBid Proposal.pdfPSI Plumbing Systems Inc Date: Client/Owner: Project Address: Proposal: Bid By PSI Tech: PLUMBING SYSTEMS INC. Master License 185796 PO Box 3879, Avon, Colorado 81620 -970.390.7763 Cell 970.926.0500 Office -970.569.3209 Fax Bid Proposal September 1, 2015 Jay & Lisa Green 1824 Glacier Court -Unit B Vail, CO 81657 Air Conditioning Install Clay Swaney I Tom Johnson Description of Work: We propose to furnish labor and material for plumbing -complete in accordance with the below specifications as follows: Option 1: Great Room/Kitchen Area Install a 3-ton Mitsubishi Model MSZ36DNA-8 indoor, wall-hung cassette with a 3-ton Mitsubishi Model MUZD36NA outdoor condensing system, to be located outside basement walkout door on the south side of building. This includes all lines, filters and associated parts needed to complete the job. These units are to be complete with remote controls. Labor and Materials for work listed above: $9,900 Option 2: Master Bedroom Install a 1-ton Mitsubishi Model MSZGE12NA-9 indoor, wall-hung cassette with a 1-ton Mitsubishi Model MUZGE12NA2 outdoor condensing system, to be located outside basement walk out door on the south side of building. This includes all lines, filters and associated parts needed to complete the job. These units are to be complete with remote controls. Labor and Materials for work listed above: $4,350 Option 3: Upstairs Bedroom Install a %-ton Mitsubishi Model MSZGE09NA-9 indoor, wall-hung cassette with a %-ton Mitsubishi Model MUZGE09NA2 outdoor condensing system, to be located on the left side of entry door in grass area. This includes all lines, filters and associated parts needed to complete the job. These units are to be complete with remote controls. Labor and Materials for work listed above: $4,040 **Note: Electrical work must be provided by customer. PS! will need to be involved to ensure that electrical work is performed to equipment specifications. General Material Specifications: Interior Work: All drain waste and vent lines to be Schedule 40 PVC pipe. All water lines to be Type M copper. Gas pipe to be Schedule 40 black steel and corrugated stainless steel (CSS). GREEN, JAY -AIR CONDITIONING INSTALL.DOC