HomeMy WebLinkAboutSI Report - Excavation (2).pdf cESARE,
,_.
INC.
Geotechnical Engineers&Construction Materials Consultants
Inspection date December 21, 2017
Letter prepared January 9, 2018
Mr. Gary Kendall
Beck Building Company
P.O. Box 4030
Vail, CO 81658
Subject: Open Excavation Observation
Galvin Residence
Vail Rowhouses Units 9 and 10 Gore Creek Drive
Vail, Colorado
Cesare Project No. 14.5012
Dear Mr. Kendall:
Cesare, Inc. (Cesare) personnel visited the site to conduct an open excavation observation for the
proposed continuous footing foundation for the Galvin Residence renovation. The continuous
footing foundation is located on the east side of the party wall for Units 8 and 9 at an elevation of
8,165.75 feet. Soils encountered at the proposed bottom of the footing elevation were native
medium dense sand, with silt and gravel, with a trace of cobbles, low to no plasticity, slightly moist,
and reddish brown in color. Random T-probe strikes and relative nuclear densities indicated the
subgrade was medium dense.
Prior to leaving the site, Cesare recommended to you that the native soils be compacted again prior
to concrete placement with a jumping jack or walk behind sheepsfoot. The additional compaction
will help to minimize potential settlement. Cesare also recommended the soils be covered and
heated prior to concrete placement.
It is Cesare's opinion, the subgrade soils exposed for the base of the continuous footing foundation
will support a foundation system designed for a maximum allowable soil bearing pressure of 3,000
pounds per square foot (psf), with a low risk of movement. Refer to Photos 1 and 2.
Contact us with any questions or comments regarding this information.
Sincerely, .Fpv R E 4
#'0,t £0.e.4.,,...
CESARE, INC. '/'yrs °'••� '�' <`' ',,
,ii.)1..,04:41L:
�',, °• 1/9/2018 /c�J
(7— 7 i
Ian M. Cesare William H. Koechlein, P.E.
Summit Office Manager Senior Geotechnical Consultant
Corporate Office: 7108 South Alton Way, Building B Centennial,CO 80112
Centennial Office 0 Frederick Office Silverthorne Office Crested Butte Office
Phone 303-220-0300 www.cesareinc.com
CESARE,INC.
101 11
efi
. i
..„-ii
- ,\
Y '
N . -
'4• .\
. . , ....,, ._. ,., „.,„,..
_� \ . 1.
fit•
•
Photo 1. Overview looking north at open hole excavation and initial demolition of Unit 9, and
preparation of soils for foundation footing for Units 8 and 9 party wall.
R : 1t �E.
- 1 , ' ' QI
- , f, --
I ,,,
-- •
-4. _ vi
: -
�.
. .. — ,A .
. .
. .. .
,,, _ ,
• , . _
, ,
. ,. •
Photo 2. View looking north along party wall for Units 8 and 9. Soil elevation for continuous footing
foundation is about 8,165.75 feet.
14.5012 Galvin Residence Open Excavation Observation(inspected 12.21.17)Letter 01.09.18 2